NAVY MIL-V-17501 F (2)-1993 VALVES CONTROL TYPE MAGAZINE AND HANGAR DECK SPRINKLER《弹药舱喷淋和飞机库甲板喷淋控制阀》.pdf

上传人:eveningprove235 文档编号:983009 上传时间:2019-03-12 格式:PDF 页数:5 大小:159.02KB
下载 相关 举报
NAVY MIL-V-17501 F (2)-1993 VALVES CONTROL TYPE MAGAZINE AND HANGAR DECK SPRINKLER《弹药舱喷淋和飞机库甲板喷淋控制阀》.pdf_第1页
第1页 / 共5页
NAVY MIL-V-17501 F (2)-1993 VALVES CONTROL TYPE MAGAZINE AND HANGAR DECK SPRINKLER《弹药舱喷淋和飞机库甲板喷淋控制阀》.pdf_第2页
第2页 / 共5页
NAVY MIL-V-17501 F (2)-1993 VALVES CONTROL TYPE MAGAZINE AND HANGAR DECK SPRINKLER《弹药舱喷淋和飞机库甲板喷淋控制阀》.pdf_第3页
第3页 / 共5页
NAVY MIL-V-17501 F (2)-1993 VALVES CONTROL TYPE MAGAZINE AND HANGAR DECK SPRINKLER《弹药舱喷淋和飞机库甲板喷淋控制阀》.pdf_第4页
第4页 / 共5页
NAVY MIL-V-17501 F (2)-1993 VALVES CONTROL TYPE MAGAZINE AND HANGAR DECK SPRINKLER《弹药舱喷淋和飞机库甲板喷淋控制阀》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-V-L750LF (2) = Ob L97040 706 INCH-POUND MIL-V-17 5 O 1F (SH) AMENDMENT 2 O9 December 1993 SUPERSEDING AMENDMENT 1 05 November 1990 MILITARY SPECIFICATION VALVES, CONTROL TYPE, MAGAZINE, AND HANGAR DECK SPRINKLER This amendment forms a part of MIL-V-l7501F(SH), dated 29 October 1990, and is appro

2、ved for use by the Naval Sea Systems Command, Department of the Navy and is available for use by all Departments and Agencies of the Department of Defense. PAGE 3 * Add new 2.1.2 as follows: “2.1.2 Other Government documents. drawinss, and publications. The following other Government documents, draw

3、ings, and publications form a part of this documentation to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS NAVAL SEA SYSTEMS COMMAND (NAVSEA) 803-6397408 - Valve, Sprinkler, 1-1/2 thru 8-in Size Assembly distribution is unlimited. 1

4、of 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-L7501F (2) D 9999906 3970430 428 D PAGE 6 * TABLE I, under : Delete iiCL1it column. * TABLE I, under “Name of part“ column: Delete “Diaphragm washer2“ and substitute “Diaphragm wacherli. PAGE

5、 7 * TABLE I, under flApplicationlt : Delete iiCL1fi column. Delete footnote 2. * TABLE I: Delete footnote 2. PAGE 8 * 3.5: Delete itclass 1“ and substitute ticlass Sit * 3.5.2.1: Delete and substitute: *3.5.2.1 Class 1. Class 1 valves shall be in accordance with drawing NAVSEA 803-6397408.1t PAGE 9

6、 * 3.6.1: Add at end of third sentence Itin accordance with drawing NAVSEA 803-6397408.Ii PAGE 10 * 3.6.1.1, First sentence: Delete and substitute IiType I, Class 1 valve dimensions shall be in accordance with drawing NAVSEA 803-6397408.“ * Delete TABLE II in its entirety. * 3.6.2.1, first sentence:

7、 Delete IfMIL-F-20042, Class 250. II and substitute “drawing NAVSEA 803-6397408.1t PAGE 11 * 3.6.2.2: Delete first and second sentence and substitute Valves, except Type I, Class 1 actuation connections shall be in accordance with drawing NAVSEA 803-6397408.t1 * 3.6.2.3: Delete. * 3.6.3: Delete last

8、 sentence. * 3.6.9 : After ltclassll, delete (Il, U. * 3.6.10: Delete. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-l7501F(SH) AMENDMENT 2 PAGE 12 * 3.6.11: Delete last sentence. * 3.6.13: Delete and substitute: “3.6.13 Test fittinas. Unle

9、ss otherwise specified (see 6.2), removable test fittings shall be in accordance with drawing NAVSEA 803-6397408. II PAGE 13 * 3.11: Add: “Marking for Type I, Class 1, valves shall be in accordance with drawing NAVSEA 803-6397408.11 PAGE 14 4.2 (a) : Delete llQualificationvl and substitute llfirst a

10、rt ic 1. e It . 4.3: Delete “Qualification“ and substitute Ilfirst article“. PAGES 15 AND 16 4.3.1: Delete and substitute: O# “4.3.1 Sample. One valve of each type and class shall be selected as a sample for first article inspection. Each sample shall be produced with equipment and procedures normal

11、ly used in production. First article approval of a type I, class 1, valve shall be in accordance with drawing NAVSEA 803-6397408. Other valves covered by this specification shall have each type, class, and si.ze separately inspected for first article acceptance. Sample valves shall be subjected to a

12、nd pass the test requirements as specified.“ 4.3.2: Delete llqualificationtl and substitute “first article“. 4.3.2, Table III: Delete I1Qualificationt1 and substitute “First. article“. 4.3.3: Delete ltrefusal to grant qualification. II and substi.tute ggrejectionrv. 4.4: Delete 4.4.1: Delete qualifi

13、cationv1 and substitute “first articl.etl. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MJ-V-L750LF (2) 9999906 L9704L2 2TO D MIL-V-17 501F (SH) AMENDMENT 2 * 4.4.2: Add: 91Sampling for type I, class 1, valves shall be in accordance with drawing

14、 NAVSEA 803-6397408.“ * 4.5: Add: Visual and dimensional examination of type I, class 1, valves shall be in accordance with drawing NAVSEA 803- 6397408. I * 4.6: Add: “Test procedures for type I, class 1, valves shall be in accordance with drawing NAVSEA 803-6397408.Il PAGE 18 * 5.1: Add: “Preservat

15、ion, packing, and marking for type I, class 1, valves shall be in accordance with drawing NAVSEA 803- 6397408. I * 6.2: After first sentence add: Acquisition for type I, class 1 valves shall be in accordance with drawing NAVSEA 803- 6397408.“ * 6.2: Delete: “e. Sizes and . . . 3.6.1.1) 6.2: Add: !I(

16、) First article inspection, if required (see 3.1) .I8 PAGE 19 6.5 Delete and substitute: “6.5 First article. When first article inspection is required, the contracting officer should provide specific guidance to offerors whether the item should be a first article sample and the number of items to be

17、 tested as specified in 4.3.1. The contracting officer should also include specific instructions in acquisition documents regarding arrangements for examinations, approval of first article test results, and disposition of first articles. Invitations for bids should provide that the Government reserv

18、es the right to waive the requirement for samples for first article inspection to those bidders offering a product which has been previously acquired or tested by the Government, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bid

19、that prior Government approval is presently appropriate for the pending contract. Bidders should not submit alternate bids unless specifically requested to do so in the solicitation.Il 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* ML-V-L750LF (

20、2) 999990b 1970413 L37 = MIL-V-l7501F(SH) AMENDMENT 2 6.5.1: Delete entire paragraph. NOTE: The margins of this amendment are marked with an asterick ii*ii to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenien

21、ce only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Preparing activity: (Project 4810-N107) Navy - SH 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASTM D7091-2005 923 Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic Nonconductive Coatings .pdf ASTM D7091-2005 923 Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic Nonconductive Coatings .pdf
  • ASTM D7091-2012 9375 Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic Nonconductive Coatings.pdf ASTM D7091-2012 9375 Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic Nonconductive Coatings.pdf
  • ASTM D7091-2013 1304 Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic Nonconductive Coatings.pdf ASTM D7091-2013 1304 Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic Nonconductive Coatings.pdf
  • ASTM D7093-2013 1250 Standard Test Method for Formability of Thin Film Organic Coatings on Steel Over a Biaxially Stretched Dome《双轴拉伸穹面上钢的有机涂层薄膜的可成形性的标准试验方法》.pdf ASTM D7093-2013 1250 Standard Test Method for Formability of Thin Film Organic Coatings on Steel Over a Biaxially Stretched Dome《双轴拉伸穹面上钢的有机涂层薄膜的可成形性的标准试验方法》.pdf
  • ASTM D7094-2004 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用改良的连续闭杯试验仪测量闪点的标准试验方法》.pdf ASTM D7094-2004 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用改良的连续闭杯试验仪测量闪点的标准试验方法》.pdf
  • ASTM D7094-2004(2009) 8125 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用改良的连续闭杯试验仪测量闪点的标准试验方法》.pdf ASTM D7094-2004(2009) 8125 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用改良的连续闭杯试验仪测量闪点的标准试验方法》.pdf
  • ASTM D7094-2012 red 8750 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用经改良的连续闭杯 (CCCFP) 试验器测定闪点的标准试验方法》.pdf ASTM D7094-2012 red 8750 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用经改良的连续闭杯 (CCCFP) 试验器测定闪点的标准试验方法》.pdf
  • ASTM D7094-2012e1 5010 Standard Test Method for Flash Point by Modified Continuously Closed Cup &40 MCCCFP&41 Tester《采用经改良连续闭杯试验仪测定闪点40 MCCCFP41的标准试验方法》.pdf ASTM D7094-2012e1 5010 Standard Test Method for Flash Point by Modified Continuously Closed Cup &40 MCCCFP&41 Tester《采用经改良连续闭杯试验仪测定闪点40 MCCCFP41的标准试验方法》.pdf
  • ASTM D7094-2016 9865 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用改性连续闭杯 (MCCCFP) 试验机测定闪点的标准试验方法》.pdf ASTM D7094-2016 9865 Standard Test Method for Flash Point by Modified Continuously Closed Cup (MCCCFP) Tester《用改性连续闭杯 (MCCCFP) 试验机测定闪点的标准试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1