NAVY S-F-695 G (1)-1983 FRYERS DEEP-FAT (ELECTRIC)《深油煎锅(电力)》.pdf

上传人:orderah291 文档编号:984647 上传时间:2019-03-12 格式:PDF 页数:3 大小:90.85KB
下载 相关 举报
NAVY S-F-695 G (1)-1983 FRYERS DEEP-FAT (ELECTRIC)《深油煎锅(电力)》.pdf_第1页
第1页 / 共3页
NAVY S-F-695 G (1)-1983 FRYERS DEEP-FAT (ELECTRIC)《深油煎锅(电力)》.pdf_第2页
第2页 / 共3页
NAVY S-F-695 G (1)-1983 FRYERS DEEP-FAT (ELECTRIC)《深油煎锅(电力)》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、S-F-695G AMENDMENT- 1 December 15, 1983 FEDERAL SPECIFICATION FRYERS, DEEP-FAT (ELECTRIC) This amendment, which forms a part of Federal Specification S-F-695G, dated June 25, 1981 is approved by the Assistant Administrator, Office of Federal Supply and Services, General Services Administration, for

2、the use of all Federal agencies. PAGE 3 2.1, under “Federal Specifications“: .Delete “QQ-S-698 - Steel Sheet and Strip, Low Carbon“, PAGE 4 2.2, under “American Society for Testing and Materials (ASTM)“: Add “A 366 - Steel, Carbon, Cold Rolled Sheet, Commercial Quality“. PAGE 5 3.4.1, line 2: Delete

3、 “QQ-S-698“ and substitute “ASTM - A 366“. 3.6.8: Delete, and substitute: “3.6.8 Thermostat. An adjustable thermostat shall be provided with a range from 2000 to 2750F and a maximum range from 3750 to 4000F. The thermostat shall have a positive “OFF“ position and be marked at 50 degree intervals. A

4、separate “ON-OFF“ switch may be provided in addition to, or in lieu of, the positive “OFF“ position to control power to the thermostat. Thermostat and switch shall be located so as to be readily accessible to the operator. The thermostat shall maintain an average temperature of 375 + 50F when tested

5、 as specified in 4.4.2.1. The temperature amplitude of the thermostat shall not exceed 250F when tested as specified in 4.4.2.2. Instructions for calibrating the thermostat shall be provided with each fryer (see 3.8.2). The thermostat shall be equipped with an overload switch that will limit the max

6、imum temperature to 4250F. The overload switch shall cut off the entire electrical system. The restart button shall be in an accessible location.“ FSC 7310 . THIS DOCUMENT CONTAINS .I 2 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-S-F-695G

7、2) 73 9977774 00LA90b O R S-F-695G Amendment-1 PAGE 10 (contd) 3.6.8.1, line 6, following t14.433tt: Insert “A means shall be provided to facilitate checking the operation of the overtemperature thermostat by rendering the first thermostat inoperative. A signal light shal indicate when the overtemp

8、erature thermstat is operated when tested as specified in 4.4.3.“ overtemperature C.ircuit.“ Line 7: Delete “thereof“ and substitute “of the mawal reset type . PAGE 11 3.6.8.1.1: Delete. 3.6.9.3 first sentence, following “above,“: Delete “and shall be c.apable of recovery to 375OF prior to completio

9、n of frying cycle“. PAGE 17 Table IV, under “Examine“ and following “Signal light or lights“: Delete listed defect and substitute “Not provided (power “ON“ and “overtemperature thermostat“ lights)“. PAGE 18 4.2.2.3, line 2, after “and“: Add “when required for shipboard use.“ PAGE 19 4.4.3, 2nd and 3

10、rd sentences: Delete and substitute “The first thermostat shall be rendered inoperative in accordance with the manufacturers operating instructions. The hydrogenated vegetable oil temperature shall be increased until the overtemperature thermostat specified in 3.6.8.1 opens the heating element circu

11、it.“ PAGE 20 4.4.3 (contd), line 4, after “times“: Add a period and delete the remainder of the sentence. Line 5: Delete “sall“ and substitute “shalltt, 4.4.4.2 (a) last sentence: Delete. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-S-F-695G Ame

12、ndment-1 MILITARY INTERESTS: Custodians: Army - GL Navy - YD Air Force - 99 Review Activities Army - MD, TX Navy - SA, MC Air Force - 84 DLA - GS User Activity Army - CE CIVIL AGENCY COORDINATING ACTIVITIES: GSA - FSS VA - DMS PREPARING ACTIVITY: Army - GL .- Project No, 7310-0674 3 -“ . ._ c) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • GOST R 55260 1 8-2013 Hydro power plants Part 1-8 Hydroelectic power stations The general rules of the organization of building manufacture at erection《水力发电厂 第1-8部分 水力发电站 在建建筑制造组织的.pdf GOST R 55260 1 8-2013 Hydro power plants Part 1-8 Hydroelectic power stations The general rules of the organization of building manufacture at erection《水力发电厂 第1-8部分 水力发电站 在建建筑制造组织的.pdf
  • GOST R 55260 1 9-2013 Hydro power plants Part 1-9 Hydraulic structures of hydropower stations Safety requirements under operation《水力发电厂 第1-9部分 水电站的水利构筑物 操作安全要求》.pdf GOST R 55260 1 9-2013 Hydro power plants Part 1-9 Hydraulic structures of hydropower stations Safety requirements under operation《水力发电厂 第1-9部分 水电站的水利构筑物 操作安全要求》.pdf
  • GOST R 55260 2 1-2012 Hydro power plants Part 2-1 Hydrotreaters Procurement specification《水力发电厂 第2-1部分 水处理器 购置规范》.pdf GOST R 55260 2 1-2012 Hydro power plants Part 2-1 Hydrotreaters Procurement specification《水力发电厂 第2-1部分 水处理器 购置规范》.pdf
  • GOST R 55260 2 2-2013 Hydro power plants Part 2-2 Hydrotreaters Hydraulic estimation procedures of operating conditions《水力发电厂 第2-2部分 水处理器 操作条件的液压评估程序》.pdf GOST R 55260 2 2-2013 Hydro power plants Part 2-2 Hydrotreaters Hydraulic estimation procedures of operating conditions《水力发电厂 第2-2部分 水处理器 操作条件的液压评估程序》.pdf
  • GOST R 55260 3 1-2013 Hydro power plants Part 3-1 Hydraulic turbines Procurement specification《水力发电厂 第3-1部分 水轮机 购置规范》.pdf GOST R 55260 3 1-2013 Hydro power plants Part 3-1 Hydraulic turbines Procurement specification《水力发电厂 第3-1部分 水轮机 购置规范》.pdf
  • GOST R 55260 3 3-2013 Hydro power plants Part 3-3 Hydraulic turbines Technical requirements for operation monitoring systems《水力发电厂 第3-3部分 水轮机 系统运行监测的技术要求》.pdf GOST R 55260 3 3-2013 Hydro power plants Part 3-3 Hydraulic turbines Technical requirements for operation monitoring systems《水力发电厂 第3-3部分 水轮机 系统运行监测的技术要求》.pdf
  • GOST R 55260 4 1-2013 Hydro power plants Part 4-1 Hydroelectric power plants The technological part hydroelectric power plants and pumped storage plants General specifications《水力发电.pdf GOST R 55260 4 1-2013 Hydro power plants Part 4-1 Hydroelectric power plants The technological part hydroelectric power plants and pumped storage plants General specifications《水力发电.pdf
  • GOST R 55261-2012 Testing agricultural tractors and machines Potato planters Methods of testing《农用拖拉机和机械试验 马铃薯播种机 试验方法》.pdf GOST R 55261-2012 Testing agricultural tractors and machines Potato planters Methods of testing《农用拖拉机和机械试验 马铃薯播种机 试验方法》.pdf
  • GOST R 55262-2012 Dry machines and installing the agricultural purpose Test methods《农用烘干机及其安装 试验方法》.pdf GOST R 55262-2012 Dry machines and installing the agricultural purpose Test methods《农用烘干机及其安装 试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1