NAVY UFGS-01 58 00-2009 PROJECT IDENTIFICATION《项目选定》.pdf

上传人:cleanass300 文档编号:984696 上传时间:2019-03-12 格式:PDF 页数:10 大小:39.88KB
下载 相关 举报
NAVY UFGS-01 58 00-2009 PROJECT IDENTIFICATION《项目选定》.pdf_第1页
第1页 / 共10页
NAVY UFGS-01 58 00-2009 PROJECT IDENTIFICATION《项目选定》.pdf_第2页
第2页 / 共10页
NAVY UFGS-01 58 00-2009 PROJECT IDENTIFICATION《项目选定》.pdf_第3页
第3页 / 共10页
NAVY UFGS-01 58 00-2009 PROJECT IDENTIFICATION《项目选定》.pdf_第4页
第4页 / 共10页
NAVY UFGS-01 58 00-2009 PROJECT IDENTIFICATION《项目选定》.pdf_第5页
第5页 / 共10页
点击查看更多>>
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 58 00 (August 2009)-Preparing Activity: NAVFAC SupersedingUFGS-01 58 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 58 00PROJECT

2、 IDENTIFICATION08/09PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.3.1 Rendering1.3.1.1 Preliminary One Line Drawings1.3.1.2 Final Rendering Sample1.3.1.3 Final Framed Rendering and Copies1.3.2 Facility Recognition Plaque1.4 PROJECT SIGN1.4.1 Project Identification Signboard (Navy)

3、1.4.1.1 Project Rendering1.4.2 Project Signboard (Air Force)1.4.3 Construction Project Signs (USACE)PART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -SECTION 01 58 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAV

4、FAC / AFCESA / NASA UFGS-01 58 00 (August 2009)-Preparing Activity: NAVFAC SupersedingUFGS-01 58 00 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION 01 58 00PROJECT IDENTIFICATION08/09*NOTE: This guide specification covers the requirem

5、ents for temporary signs for project identification.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective

6、project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.R

7、ecommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for AIR FORCE, AVIANO (Aviano Air Base Italy), NAVFAC Atlantic, and USACE. Selection or deselection of a tailoring option will include or exclude that option in the

8、 section, but editing the resulting section to fit the project is still required.*NOTE: Include the following on project drawings:1. Location of project sign.*PART 1 GENERAL1.1 REFERENCES*SECTION 01 58 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from

9、 IHS-,-,-NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference fea

10、ture when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the pro

11、ject specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN WOOD PROTECTION ASSOCIATION (AWPA

12、)AWPA C1 (2003) All Timber Products - Preservative Treatment by Pressure ProcessesAWPA C2 (2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure ProcessesU.S. ARMY CORPS OF ENGINEERS (USACE)EP 310-1-6a (2006) Sign Standards Manual, VOL 1EP 310-1-6b (2006) Sign Standard

13、s Manual, VOL 2, Appendices*NOTE: Include the following Submittal and Quality Assurance paragraphs in all design-build projects and on other applicable projects where the Contractor must provide the rendering. *1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SU

14、BMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are alrea

15、dy marked with a “G”. Only delete an existing “G” if the submittal item is not SECTION 01 58 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the su

16、bmittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects usin

17、g the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy,

18、 Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Contro

19、l approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsPreliminary one line drawings

20、of project rendering; G; G, _preliminary drawing indicating layout and text content; G; G, _Sign Legend Orders; G; G, _SD-04 SamplesFinal rendering sample; G; G, _Final framed rendering and copies; G; G, _ Facility Recognition Plaque; G; G, _1.3 QUALITY ASSURANCE1.3.1 RenderingProvide the project re

21、ndering in accordance with the following drawing stages as required in paragraph entitled “Submittals“. The following submittal data is required to properly identify the appropriate view and approve the final rendering of the facility. The final painted rendering will be used to produce the image fo

22、r the signboard and framed photographic copies provided to the Contracting Officer.SECTION 01 58 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3.1.1 Preliminary One Line DrawingsProvide three different views of the facility in a prelimin

23、ary single line drawing (black and white) format. These three views will represent the best angles at which to view the proposed facility showing the _best design features and the three dimensional character of the facility.1.3.1.2 Final Rendering SampleProvide a photographic copy (200 by 250 millim

24、eters 8 by 10 inches minimum size) of final rendering for approval of color, landscaping, and foreground/background development prior to final submittal.1.3.1.3 Final Framed Rendering and CopiesProvide final full color rendering of the proposed facility as specified. 1.3.2 Facility Recognition Plaqu

25、e*NOTE: Include this paragraph for new people oriented/ people occupied MCON/MILCOM facilities such as: BEQ, Administration, Child Care Centers, Fitness Centers, and other appropriate landmark or unique facilities. Confirm the decision to use this plaque with the Project Manager. Provide design, det

26、ails and specifications on the contract documents for this plaque. Coordinate the names and organizations that will be identified on the plaque with the Project Manager. Refer to UFC 1-300-09N, Design Procedures for further plaque requirements.*Submit full size drawing of Facility Recognition Plaque

27、 for approval. Contractor shall confirm the content (message), location and mounting with Contracting Officer prior to fabrication. The names on the plaque shall be determined at the end of the project duration to assure that current participants can be identified and recognized on the plaque.1.4 PR

28、OJECT SIGN*NOTE: TO DOWNLOAD UFGS GRAPHICS Go to http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.*NOTE: Provide project signboard on all MILCON and other significant facility projects for CNIC and NAVFAC in accordance with Plates 1, 3, and 4 of attached sketches. For USMC and NAVFAC projects, provide s

29、ignboard in accordance with Plates 1MC, 3 and 4 of attached sketches. Significant projects are those projects, greater than $1,000,000, that are located in an area visible to large numbers of people; will provide visual construction activities; will be of sufficient size and scope; or of high intere

30、st to the using activity. Unless waived by government project management, provide project SECTION 01 58 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-signboard with rendering for all MILCON and other significant projects. Signboard with re

31、ndering details for CNIC and NAVFAC are indicated in accordance with Plates 2, 3, 4 and 5 of attached sketches. Signboard with rendering details for USMC and NAVFAC are indicated in accordance with Plates 2MC, 3, 4 and 5 of attached sketches. Signs are generally not required for projects located in

32、remote areas; projects involving all interior work; parking lot and utilities projects whether overhead or underground; etc. Discuss the necessity of a sign with the using Activity.*NOTE: The 1220 mm (4-0“) by 2440 mm (8-0“) size of the signboard depicted in Plates 1 and 2 is a minimum size requirem

33、ent. Adjust size to suit, massing, distance from most traveled roads, traffic and speed. When a size larger than the minimum is warranted, provide adequate support and bracing based on soil and wind conditions and increase lettering size in proportion to the dimensions of the sign.*NOTE: For design-

34、build projects eliminate the bracketed option stating that the Government will provide a temporary rendering and include the last bracketed option for Contractor to provide a color rendering.*Prior to initiating any work on site, provide one_ project identification sign at the location indicateddesi

35、gnated. Construct the sign in accordance with project sign detail attached at the end of this section. Maintain sign throughout the life of the project. Upon completion of the project, remove the sign from the site. The Government will temporarily supply the Contractor a copy of the rendering to use

36、 in the production of the final signboard artwork. Provide color rendering of the project. Reproduce the rendering on the signboard or enclose a copy of the rendering under a water-proof, transparent cover, and caulk for weather protection.*NOTE: For NAVFAC Atlantic and NAVFAC Europe projects in Ita

37、ly, add the following paragraph. Obtain the current name of the Design Safety Coordinator from NAVFAC Atlantic or NAVFAC Europe project manager and insert below. Obtain the current name of the Resident Officer in Charge of Construction from NAVFAC Atlantic or NAVFAC Europe project manager and insert

38、 as the Construction Safety Officer. *On the project sign, provide points of contact for the Design Safety Coordinator and the Construction Safety Officer in accordance with Italian Law as follows: “Design Safety Coordinator-_, CEC, U.S. Navy, SECTION 01 58 00 Page 6Provided by IHSNot for ResaleNo r

39、eproduction or networking permitted without license from IHS-,-,-Commanding Officer, Engineering Field Activity Mediterranean“ “Construction Safety Officer - _, CEC, U.S. Navy, Resident Officer in Charge of Construction“. 1.4.1 Project Identification Signboard (Navy)*NOTE: Use the following paragrap

40、h for all NAVY projects and include the appropriate project identification signboard plates at the end of this section. Signboard Plates are grouped for CNIC and NAVFAC without rendering, USMC and NAVFAC without rendering, CNIC and NAVFAC with rendering, and USMC and NAVFAC with rendering. Delete th

41、is paragraph for Air Force projects and utilize the Air Force paragraph.*A project identification signboard shall be provided in accordance with attached Plates 1, 3, and 41MC, 3, and 42, 3, 4, and 52MC, 3, 4, and 5. Provide preliminary drawing indicating layout and text content.The signboard shall be provided at a conspicuous location on the job site where directed by the Contracting Officer. a. The field of the sign shall consist of a 1200 by 2400 mm 4 by 8 foot sheet of grade B-B medium density overlaid exterior plywood.b. Lumb

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1