as been reviewed and determined to be valia for we in acquisition. Preparing activiiq: Aw-AR AMSC N/A FSG 1315 DISTRIl3UTION STATEMENT A. Approved far
射孔弹爆破Tag内容描述:
1、as been reviewed and determined to be valia for we in acquisition. Preparing activiiq: Aw-AR AMSC N/A FSG 1315 DISTRIl3UTION STATEMENT A. Approved far public release; distribution is .ylirnited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-。
2、E COMPONENTS FOR PROJECTILE, 105MM, APDS-T M392A1 This notice should be filed in front of MIL-P-48446 (AR) dated 17 December 1973 MIL-P-48446 dated 17 December 1973 and Validation Notice 1, dated 27 May 1987 is inactive for new design and is no longer used, except for replacement purposes. Preparing Activity: Army - AR MSC NIA FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without lic。
3、,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. REQUIREMENTS MIL-P-48446 (MU) 3.1 General,-The components shall be manufactured by the powder metallurgy process and shall comply with the requirements on the applicable drawings, the referenced specification and the following: 3.2 Chemical Properties. 3.2.1 =.-The following chemical composition requirements shall apply to each core powder batch after。