1、Lessons Learned Entry: 0208Lesson Info:a71 Lesson Number: 0208a71 Lesson Date: 1992-11-10a71 Submitting Organization: KSCa71 Submitted by: David PenningtonSubject: Solid Rocket Booster (SRB) Hydraulic Tank; Task Teams Description of Driving Event: The task team concept that has been implemented at K

2、SC is an approach to involving hands-on leadership at the task level. One of its benefits is that it keeps jobs moving without sacrificing quality, control, or safety. It also brings together all personnel needed to perform a particular job in conjunction with an identified leader and places respons

3、ibility at an operationally realistic level. Specific training on operating within a task team environment has been developed and used by the Shuttle Processing Contractor (SPC). Task team leaders are selected from the ranks of engineers and technicians as appropriate.In addition to the introduction

4、 of task teams, a joint NASA/SPC steering committee has been established to oversee and improve launch processing. One area the steering committee has targeted for improvement is the approach used to develop and update OMIs. The objective will be to improve the accuracy while simplifying and streaml

5、ining the processes.Lesson(s) Learned: 1. Recent over-pressurization of a Solid Rocket Booster (SRB) hydraulic tank has been attributed to an improperly written Operational Maintenance Instruction (OMI).2. The use of task teams at Kennedy Space Center appears to be working well.Recommendation(s): 1.

6、 Increase efforts to improve the quality of OMIs, this should include the generation, review, and revision of the instructions.2. The task team approach should be expanded, at the same time increasing coordination among task teams.Provided by IHSNot for ResaleNo reproduction or networking permitted

7、without license from IHS-,-,-Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Administration/Organizationa71 Policy & PlanningAdditional Info: Approval Info: a71 Approval Date: 1994-06-08a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • AECMA PREN 3244-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Double Ended Edition P 2《航空航天系列.导管接头8°30′钛合金锻造螺纹.P1版》.pdf AECMA PREN 3244-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Double Ended Edition P 2《航空航天系列.导管接头8°30′钛合金锻造螺纹.P1版》.pdf
  • AECMA PREN 3245-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Reducer Edition P 2《航空航天系列.导管接头8°30′钛合金锻造减压器.P1版》.pdf AECMA PREN 3245-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Reducer Edition P 2《航空航天系列.导管接头8°30′钛合金锻造减压器.P1版》.pdf
  • AECMA PREN 3246-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead Edition P 2《航空航天系列.导管接头8°30′钛合金锻造防水壁.P1版》.pdf AECMA PREN 3246-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead Edition P 2《航空航天系列.导管接头8°30′钛合金锻造防水壁.P1版》.pdf
  • AECMA PREN 3247-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead Welded Edition P 2《航空航天系列.导管接头8°30′钛合金锻造防水壁.P1版》.pdf AECMA PREN 3247-1995 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead Welded Edition P 2《航空航天系列.导管接头8°30′钛合金锻造防水壁.P1版》.pdf
  • AECMA PREN 3248-1994 Aerospace Series Pipe Coupling 8 Degree 30' in Titanium Alloy Adapters Reduced Pipe End with Locking Ring Edition P 1《航空航天系列.导管接头8°30′钛合金90度弯曲替代PREN 4017锻造.P1版.pdf AECMA PREN 3248-1994 Aerospace Series Pipe Coupling 8 Degree 30' in Titanium Alloy Adapters Reduced Pipe End with Locking Ring Edition P 1《航空航天系列.导管接头8°30′钛合金90度弯曲替代PREN 4017锻造.P1版.pdf
  • AECMA PREN 3249-1994 Aerospace Series Pipe Coupling 8 Degrees 30 Feet in Titanium Alloy Elbow 90 Degress Edition P 2 [Replaced By ASD-STAN PREN 4017]《航空航天系列.导管接头8°30′钛合金90度扭转替代PREN.pdf AECMA PREN 3249-1994 Aerospace Series Pipe Coupling 8 Degrees 30 Feet in Titanium Alloy Elbow 90 Degress Edition P 2 [Replaced By ASD-STAN PREN 4017]《航空航天系列.导管接头8°30′钛合金90度扭转替代PREN.pdf
  • AECMA PREN 3250-1994 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Elbow 90 Degrees Swivel Nut Edition P 2《航空航天系列.导管接头8°30′钛合金90度弯曲替代PREN 4018锻造.P1版》.pdf AECMA PREN 3250-1994 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Elbow 90 Degrees Swivel Nut Edition P 2《航空航天系列.导管接头8°30′钛合金90度弯曲替代PREN 4018锻造.P1版》.pdf
  • AECMA PREN 3251-1994 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Elbow 90 Degrees Welded Edition P 2《航空航天系列.导管接头8°30′钛合金90度扭转替代PREN 4020锻造.P1版》.pdf AECMA PREN 3251-1994 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Elbow 90 Degrees Welded Edition P 2《航空航天系列.导管接头8°30′钛合金90度扭转替代PREN 4020锻造.P1版》.pdf
  • AECMA PREN 3252-1994 Aerospace Series Pipe Coupling 8 Degree 30' in Titanium Alloy Elbow 90 Degree Swivel Nut Welded Edition P 2《航空航天系列.导管接头8°30′钛合金90度扭转螺母替代PREN 4020锻造.P1版》.pdf AECMA PREN 3252-1994 Aerospace Series Pipe Coupling 8 Degree 30' in Titanium Alloy Elbow 90 Degree Swivel Nut Welded Edition P 2《航空航天系列.导管接头8°30′钛合金90度扭转螺母替代PREN 4020锻造.P1版》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1