REG NASA-LLIS-0405-1996 Lessons Learned - Stepping Commands Cause Positioning Problems (1970 76).pdf

上传人:proposalcash356 文档编号:1018052 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.54KB
下载 相关 举报
REG NASA-LLIS-0405-1996 Lessons Learned - Stepping Commands Cause Positioning Problems (1970 76).pdf_第1页
第1页 / 共3页
REG NASA-LLIS-0405-1996 Lessons Learned - Stepping Commands Cause Positioning Problems (1970 76).pdf_第2页
第2页 / 共3页
REG NASA-LLIS-0405-1996 Lessons Learned - Stepping Commands Cause Positioning Problems (1970 76).pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0405Lesson Info:a71 Lesson Number: 0405a71 Lesson Date: 1996-04-26a71 Submitting Organization: JPLa71 Submitted by: J.A. RobertsSubject: Stepping Commands Cause Positioning Problems (1970/76) Abstract: Unlike explicit commands, stepping or incremental commands, however, simply

2、 cause the device to move by the commanded increment from its current position to the new position. If the current position is incorrect, the next position and all subsequent positions will be incorrect. The use of explicit commands is recommended whenever no significant operational advantage exists

3、 using incremental commands. Should an incremental command capability be desired for other reasons, the system design should consider also implementing the explicit command capability to ensure fault tolerance.Description of Driving Event: (Relevant Historical Lessons Learned)Mariner (M)69 and Vikin

4、g Orbiter (VO)75 had problems because the designs used stepping commands rather than explicit commands. Explicit commands cause a device (such as the scan platform) to move directly to the desired state or position, regardless of its current position. Stepping or incremental commands, however, simpl

5、y cause the device to move by the commanded increment from its current position to the new position. If the current position is incorrect, the next position and all subsequent positions will be incorrect.When a power problem occurred as M69 was approaching its Mars fly-by, the scan platform moved in

6、advertently and the engineering telemetry needed to determine the platforms position was destroyed. The platform then had to be commanded by trial-and-error until Mars appeared in the returning pictures. Had this search not been successful in the short time remaining until Mars encounter, the entire

7、 science sequence would have been irretrievably lost.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A less serious problem occurred on VO-1 when the position of the camera filter wheel got out of step with the picture-taking sequence. Once out of st

8、ep, the several frames subsequently exposed were lost due to over/under-exposure. Correct exposure had to be restored by ground command.Additional Keyword(s): SoftwareReference(s):a71 M69 P/FR Nos. 204634, 204660a71 VO75 VISA # 1450 (IOM 3623-BB-167)Lesson(s) Learned: All commands, whether stepping

9、or explicit, have within them a potential for error. However, since explicit commands do not depend on the success of previous commands to be successful, they tend to be “fault-tolerant,“ in the sense that they do not perpetuate errors in the command sequence.Recommendation(s): The use of explicit c

10、ommands is recommended whenever no significant operational advantage exists using incremental commands. Should an incremental command capability be desired for other reasons, the system design should consider also implementing the explicit command capability to ensure fault tolerance.Evidence of Rec

11、urrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Flight Equipmenta71 SpacecraftProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Approval Info: a71 Approval Date: 1995-10-16a71 Approval Name: Carol Dumaina71 Approval Organization: JPLa71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS 5597-1991 Specification for non-refillable plastics aerosol dispensers up to 1000 mL capacity《容量可达1000ml一次使用的塑料气溶胶分配器规范》.pdf BS 5597-1991 Specification for non-refillable plastics aerosol dispensers up to 1000 mL capacity《容量可达1000ml一次使用的塑料气溶胶分配器规范》.pdf
  • BS 5598-1-1978 Methods of sampling and test for halogenated hydrocarbons - Sampling of liquid products《卤代烃取样和试验方法 第1部分 液态制品取样》.pdf BS 5598-1-1978 Methods of sampling and test for halogenated hydrocarbons - Sampling of liquid products《卤代烃取样和试验方法 第1部分 液态制品取样》.pdf
  • BS 5598-2-1979 Methods of sampling and test for halogenated hydrocarbons - Sampling of liquefied gases《卤代烃取样和试验方法 第2部分 液化气取样》.pdf BS 5598-2-1979 Methods of sampling and test for halogenated hydrocarbons - Sampling of liquefied gases《卤代烃取样和试验方法 第2部分 液化气取样》.pdf
  • BS 5598-6-1979 Methods of sampling and test for halogenated hydrocarbons - Determination of acidity of fluorochlorinated hydrocarbons《卤代烃的取样和试验方法 第6部分 氟氯代烃酸度测定》.pdf BS 5598-6-1979 Methods of sampling and test for halogenated hydrocarbons - Determination of acidity of fluorochlorinated hydrocarbons《卤代烃的取样和试验方法 第6部分 氟氯代烃酸度测定》.pdf
  • BS 5598-8-1980 Methods of sampling and test for halogenated hydrocarbons - Determination of non-volatile residue in fluorinated hydrocarbons《卤代烃取样和试验方法 第8部分 氟化烃非挥发性残渣测定》.pdf BS 5598-8-1980 Methods of sampling and test for halogenated hydrocarbons - Determination of non-volatile residue in fluorinated hydrocarbons《卤代烃取样和试验方法 第8部分 氟化烃非挥发性残渣测定》.pdf
  • BS 5600-1 1-1979 Powder metallurgical materials and products - General information - Introduction and contents《粉末冶金材料和制品 第1部分 总则 第1节 前言和目录》.pdf BS 5600-1 1-1979 Powder metallurgical materials and products - General information - Introduction and contents《粉末冶金材料和制品 第1部分 总则 第1节 前言和目录》.pdf
  • BS 5605-1990 Recommendations for citing and referencing published material《援引和查询出版物用推荐标准》.pdf BS 5605-1990 Recommendations for citing and referencing published material《援引和查询出版物用推荐标准》.pdf
  • BS 5607-2017 Code of practice for the safe use of explosives in the construction industry《建造业安全使用爆炸品业务守则》.pdf BS 5607-2017 Code of practice for the safe use of explosives in the construction industry《建造业安全使用爆炸品业务守则》.pdf
  • BS 5608-1993 Specification for preformed rigid polyurethane (PUR) and polyisocyanurate (PIR) foams for thermal insulation of pipework and equipment《管道工程和设备隔热用预成型刚性聚氨基甲酸乙酯(PUR)和聚异氰尿.pdf BS 5608-1993 Specification for preformed rigid polyurethane (PUR) and polyisocyanurate (PIR) foams for thermal insulation of pipework and equipment《管道工程和设备隔热用预成型刚性聚氨基甲酸乙酯(PUR)和聚异氰尿.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1