REG NASA-LLIS-0415-1996 Lessons Learned Radio Frequency (RF) Breakdown in Mariner Mars-71 Flight Radio Frequency Subsystem (RFS) Components and Circuits (~1971).pdf

上传人:arrownail386 文档编号:1018062 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.64KB
下载 相关 举报
REG NASA-LLIS-0415-1996 Lessons Learned Radio Frequency (RF) Breakdown in Mariner Mars-71 Flight Radio Frequency Subsystem (RFS) Components and Circuits (~1971).pdf_第1页
第1页 / 共3页
REG NASA-LLIS-0415-1996 Lessons Learned Radio Frequency (RF) Breakdown in Mariner Mars-71 Flight Radio Frequency Subsystem (RFS) Components and Circuits (~1971).pdf_第2页
第2页 / 共3页
REG NASA-LLIS-0415-1996 Lessons Learned Radio Frequency (RF) Breakdown in Mariner Mars-71 Flight Radio Frequency Subsystem (RFS) Components and Circuits (~1971).pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0415Lesson Info:a71 Lesson Number: 0415a71 Lesson Date: 1996-07-01a71 Submitting Organization: JPLa71 Submitted by: J.A. RobertsSubject: Radio Frequency (RF) Breakdown in Mariner Mars 71 Flight Radio Frequency Subsystem (RFS) Components and Circuits (1971) Abstract: During fin

2、al flight acceptance testing, an RF breakdown in an exciter revealed that its design was subject to RF breakdown at critical pressure. Costly design modifications late in the program were required to correct the design. All RF transmitter components and circuits should be analyzed and tested to dete

3、rmine their performance margin to any kind of RF breakdown. The lesson specifies the minimum margins.Description of Driving Event: (Relevant Historical Lesson(s) Learned)During the final flight acceptance testing of the second Mariner Mars 71 flight RFS, an RF breakdown occurred in one of the excite

4、rs at critical pressure. Investigation showed the exciter design had little or no margin to RF breakdown at critical pressure. Costly design modifications, late in the program, were required to correct the design.Also, during thermal-vacuum testing of the MM71 RFS Proof Test Model, the RF output was

5、 found to be a function of the vacuum chamber pressure. The problem was traced to the circulator switch used to select the traveling wave tube amplifier and antenna. Investigation showed that the switch had not been analyzed nor adequately tested by the subcontractor to determine its margin to RF br

6、eakdown. Costly design modifications late in the program, were required to achieve an acceptable RF breakdown margin.The MM71 Exciter RF breakdown investigation also determined that foam should not be used as an RF breakdown suppressant.Provided by IHSNot for ResaleNo reproduction or networking perm

7、itted without license from IHS-,-,-Reference(s): JPL Technical Memo 33-573 “MM71 RFS Subsystem“, R.S. HughesLesson(s) Learned: 1. All RF transmitter components and circuits should be analyzed and tested to determine their performance margin to any kind of RF breakdown.2. As a goal, all components an

8、d circuits should be designed to have a margin equal to a factor of four in power or a factor of two in voltage (6dB) against breakdown.Recommendation(s): 1. RF breakdown should be one component of the worst-case analysis normally required in the design, and it should be accomplished early in the de

9、velopment phase of the program. The breakdown margin must include all operating environments. Voltages, power levels, spacings should all be checked to determine the susceptibility to both multipaction and ionization (corona) discharge breakdown. The margin must be determined (tested) for each envir

10、onment expected.2. As a minimum, a margin of 3 dB (factor of two in power; factor of 1.4 in voltage), which has been verified by testing, is required. The breakdown margin of a passive component can usually be measured by applying up to 6 dB more input power than is expected during normal operation.

11、 However, measuring the breakdown margin of an active circuit, such as a transistor amplifier, is much more difficult and requires a well thought-out testing program.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s):

12、a71 Hardwarea71 Parts Materials & Processesa71 SpacecraftProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Approval Info: a71 Approval Date: 1995-10-16a71 Approval Name: Carol Dumaina71 Approval Organization: JPLa71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASME STP-NU-015-2008 A Guide to American Crane Standards for Electric Overhead Traveling Cranes Hoists and Related Equipment for Nuclear Facilities《核能设施用电气高架移动式起重机 小型起重机和相关设备的美国起重机_1.pdf ASME STP-NU-015-2008 A Guide to American Crane Standards for Electric Overhead Traveling Cranes Hoists and Related Equipment for Nuclear Facilities《核能设施用电气高架移动式起重机 小型起重机和相关设备的美国起重机_1.pdf
  • ASME STP-NU-018-2009 CREEP-FATIGUE DATA AND EXISTING EVALUATION PROCEDURES FOR GRADE 91 AND HASTELLOY XR《91级和哈斯特洛伊耐蚀镍基合金XR用蠕变疲劳数据和现有的评定规程》.pdf ASME STP-NU-018-2009 CREEP-FATIGUE DATA AND EXISTING EVALUATION PROCEDURES FOR GRADE 91 AND HASTELLOY XR《91级和哈斯特洛伊耐蚀镍基合金XR用蠕变疲劳数据和现有的评定规程》.pdf
  • ASME STP-NU-019-1-2009 VERIFICATION OF ALLOWABLE STRESSES IN ASME SECTION III SUBSECTION NH FOR GRADE 91 STEEL《91级钢的ASME III部分、分部分NH的许可应力的检验》.pdf ASME STP-NU-019-1-2009 VERIFICATION OF ALLOWABLE STRESSES IN ASME SECTION III SUBSECTION NH FOR GRADE 91 STEEL《91级钢的ASME III部分、分部分NH的许可应力的检验》.pdf
  • ASME STP-NU-020-2008 VERIFICATION OF ALLOWABLE STRESSES IN ASME SECTION III SUBSECTION NH FOR ALLOY 800H《合金800H的ASME III部分、分部分NH的许可应力的检验》.pdf ASME STP-NU-020-2008 VERIFICATION OF ALLOWABLE STRESSES IN ASME SECTION III SUBSECTION NH FOR ALLOY 800H《合金800H的ASME III部分、分部分NH的许可应力的检验》.pdf
  • ASME STP-NU-035-2012 EXTEND ALLOWABLE STRESS VALUES FOR ALLOY 800H《合金800H的扩展容许应力值》.pdf ASME STP-NU-035-2012 EXTEND ALLOWABLE STRESS VALUES FOR ALLOY 800H《合金800H的扩展容许应力值》.pdf
  • ASME STP-NU-037-2010 OPERATING CONDITION ALLOWABLE STRESS VALUES IN ASME SECTION III SUBSECTION NH《美国机械工程师学会(ASME)第Ⅲ部分第NH分段中操作条件容许应力值》.pdf ASME STP-NU-037-2010 OPERATING CONDITION ALLOWABLE STRESS VALUES IN ASME SECTION III SUBSECTION NH《美国机械工程师学会(ASME)第Ⅲ部分第NH分段中操作条件容许应力值》.pdf
  • ASME STP-NU-038-2010 ASME CODE CONSIDERATIONS FOR THE INTERMEDIATE HEAT EXCHANGER (IHX)《中间热交换器(IHX)用美国机械工程师学会(ASME)规范》.pdf ASME STP-NU-038-2010 ASME CODE CONSIDERATIONS FOR THE INTERMEDIATE HEAT EXCHANGER (IHX)《中间热交换器(IHX)用美国机械工程师学会(ASME)规范》.pdf
  • ASME STP-NU-039-2011 CREEP AND CREEP-FATIGUE CRACK GROWTH AT STRUCTURAL DISCONTINUITIES AND WELDS《非连接性结构和焊接处的蠕变和蠕变疲劳裂纹扩展》.pdf ASME STP-NU-039-2011 CREEP AND CREEP-FATIGUE CRACK GROWTH AT STRUCTURAL DISCONTINUITIES AND WELDS《非连接性结构和焊接处的蠕变和蠕变疲劳裂纹扩展》.pdf
  • ASME STP-NU-040-2012 UPDATE AND IMPROVE SUBSECTION NH C SIMPLIFIED ELASTIC AND INELASTIC DESIGN ANALYSIS METHODS《更新和改进分段NH 简化的弹性和非弹性设计分析方法》.pdf ASME STP-NU-040-2012 UPDATE AND IMPROVE SUBSECTION NH C SIMPLIFIED ELASTIC AND INELASTIC DESIGN ANALYSIS METHODS《更新和改进分段NH 简化的弹性和非弹性设计分析方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1