REG NASA-LLIS-0577-1997 Lessons Learned - Verify CAD CAM Software Compatibility Between Organizations Before Proceeding to Hardware Fabrication (1995).pdf

上传人:赵齐羽 文档编号:1018224 上传时间:2019-03-21 格式:PDF 页数:3 大小:15.03KB
下载 相关 举报
REG NASA-LLIS-0577-1997 Lessons Learned - Verify CAD CAM Software Compatibility Between Organizations Before Proceeding to Hardware Fabrication (1995).pdf_第1页
第1页 / 共3页
REG NASA-LLIS-0577-1997 Lessons Learned - Verify CAD CAM Software Compatibility Between Organizations Before Proceeding to Hardware Fabrication (1995).pdf_第2页
第2页 / 共3页
REG NASA-LLIS-0577-1997 Lessons Learned - Verify CAD CAM Software Compatibility Between Organizations Before Proceeding to Hardware Fabrication (1995).pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0577Lesson Info:a71 Lesson Number: 0577a71 Lesson Date: 1997-11-17a71 Submitting Organization: JPLa71 Submitted by: D. Oberhettinger/D. LordSubject: Verify CAD/CAM Software Compatibility Between Organizations Before Proceeding to Hardware Fabrication (1995) Abstract: The Cassi

2、ni Telemetry and Control module failed during functional bench test. This was due to an electrical trace errors generated during the apparently successful translation of PWB circuit design data from JPL CAD software to vendor CAD software. To prevent undesirable rework on flight hardware, this lesso

3、n suggests several steps to verify the net list, the vendor software compatibility, and the PWB.Description of Driving Event: Printed wiring boards (PWBs) for JPL spacecraft flight control systems are produced in the following sequential steps using specialized computer-aided design (CAD) software p

4、rograms:1. Schematic Capture. A schematic diagram-a functional representation of the circuit design - is produced by the JPL circuit designer using one CAD tool.2. Net List. A functional representation of the PWB interconnections may be generated by a different JPL organization using the same or a d

5、ifferent CAD tool. The schematic is compiled to produce a “net-list,“ which identifies each set of nodes (i.e., set of pins on piece parts) to be electrically connected to form a “net.“3. PWB Design. This net-list is transferred to a PWB design vendor along with physical descriptions of the piece pa

6、rts. The PWB design vendor may use another CAD program to define the physical PWB layout, including placing and routing.4. PWB Artwork. Data files from this CAD program are then sent to an artwork vendor who may use yet another CAD program to create the PWB artwork.5. PWB Fabrication. The artwork an

7、d a fabrication drawing are sent to a PWB fabrication vendor to construct the PWB.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Errors may be introduced in each step without any indication of CAD/CAM software incompatibility. The Cassini Telemetry

8、and Control (T&C) module failed during functional bench test in June 1995. Inspection of artwork prepared by the PWB artwork vendor revealed three nodes connected to three other nodes in contradiction to the schematic diagram. The errors occurred in the conversion of the net-list, prepared by JPL us

9、ing one CAD program, to the vendor artwork, which utilized a different CAD software program. Node reference numbers possessing common “suffixes“ were interpreted as common nodes without discriminating between the differing “prefixes.“ The incorrect interconnection of certain gate outputs caused cont

10、ention-type failures, disabling the telemetry processing circuitry.The corrective action performed by JPL was to rework the stray node connections with trace cutting and haywires, and to replace many parts which may have been damaged when the T&C module was powered for test.Additional Keyword(s): PW

11、B MiswireReference(s): JPL Problem/Failure Report No. 61810Lesson(s) Learned: Electrical trace errors may be generated during the apparently successful translation of PWB circuit design data from JPL CAD software to vendor CAD software.Such incidents on future “faster, better, cheaper“ projects coul

12、d have a significantly adverse effect on cost, schedule, quality and reliability.Recommendation(s): To prevent undesirable rework on flight hardware:1. Use automated design checks or manual methods to verify the fidelity of the net list to the schematic prior to PWB design.2. Initially verify the co

13、mpatibility of vendor CAD/CAM software generated interconnects with JPL circuit design net list CAD files before committing to PWB fabrication.3. Where cost and schedule allow, use a prototype PWB for complete verification via extensive continuity checking or functional testing of a populated board.

14、Evidence of Recurrence Control Effectiveness: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): N/AAdditional Info: Approval Info: a71 Approval Date: 1997-11-21a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASTM C110-2016 Standard Test Methods for Physical Testing of Quicklime Hydrated Lime and Limestone.pdf ASTM C110-2016 Standard Test Methods for Physical Testing of Quicklime Hydrated Lime and Limestone.pdf
  • ASTM C110-2016e1 Standard Test Methods for Physical Testing of Quicklime Hydrated Lime and Limestone《生石灰 熟石灰和石灰石的物理试验的标准试验方法》.pdf ASTM C110-2016e1 Standard Test Methods for Physical Testing of Quicklime Hydrated Lime and Limestone《生石灰 熟石灰和石灰石的物理试验的标准试验方法》.pdf
  • ASTM C1101 C1101M-2006 Standard Test Methods for Classifying the Flexibility or Rigidity of Mineral Fiber Blanket and Board Insulation《矿物纤维毯和绝热板的柔性和刚性分类的标准试验方法》.pdf ASTM C1101 C1101M-2006 Standard Test Methods for Classifying the Flexibility or Rigidity of Mineral Fiber Blanket and Board Insulation《矿物纤维毯和绝热板的柔性和刚性分类的标准试验方法》.pdf
  • ASTM C1101 C1101M-2006(2012) Standard Test Methods for Classifying the Flexibility or Rigidity of Mineral Fiber Blanket and Board Insulation《矿物纤维毯和绝热板的柔性和刚性分类的标准试验方法》.pdf ASTM C1101 C1101M-2006(2012) Standard Test Methods for Classifying the Flexibility or Rigidity of Mineral Fiber Blanket and Board Insulation《矿物纤维毯和绝热板的柔性和刚性分类的标准试验方法》.pdf
  • ASTM C1101 C1101M-2006(2017) Standard Test Methods for Classifying the Flexibility or Rigidity of Mineral Fiber Blanket and Board Insulation《绝热矿物纤维毡及板挠性或刚性分类的标准试验方法》.pdf ASTM C1101 C1101M-2006(2017) Standard Test Methods for Classifying the Flexibility or Rigidity of Mineral Fiber Blanket and Board Insulation《绝热矿物纤维毡及板挠性或刚性分类的标准试验方法》.pdf
  • ASTM C1103-2003 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线的接头验收试验的标准规程》.pdf ASTM C1103-2003 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线的接头验收试验的标准规程》.pdf
  • ASTM C1103-2003(2009) Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线的接头验收试验的标准实施规程》.pdf ASTM C1103-2003(2009) Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线的接头验收试验的标准实施规程》.pdf
  • ASTM C1103-2014 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线接头验收试验的标准实践规程》.pdf ASTM C1103-2014 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《已安装的预制混凝土污水管线接头验收试验的标准实践规程》.pdf
  • ASTM C1103M-2003 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)《已安装的预制混凝土污水管线的接头验收标准规程(米制)》.pdf ASTM C1103M-2003 Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)《已安装的预制混凝土污水管线的接头验收标准规程(米制)》.pdf