REG NASA-LLIS-0861-2000 Lessons Learned Inadequate Holding Transport Fixtures Leading to B747SP Rudder Damage.pdf

上传人:赵齐羽 文档编号:1018507 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.36KB
下载 相关 举报
REG NASA-LLIS-0861-2000 Lessons Learned Inadequate Holding Transport Fixtures Leading to B747SP Rudder Damage.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-0861-2000 Lessons Learned Inadequate Holding Transport Fixtures Leading to B747SP Rudder Damage.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0861Lesson Info:a71 Lesson Number: 0861a71 Lesson Date: 2000-05-18a71 Submitting Organization: ARCa71 Submitted by: Anthony BricenoSubject: Inadequate Holding/Transport Fixtures Leading to B747SP Rudder Damage Description of Driving Event: The upper rudder of the 747SP aircraf

2、t was removed from the aircraft tail. The rudder was lowered lengthwise in the vertical position to a flat bed. The rudder was rotated to a position above the flat bed. The rudder was next rotated to a hinged up horizontal position. The two right hand fittngs were removed and the rudder was rotated

3、over towards the right side. The lower left hand fitting pulled the screws and some surrounding structure from the rudder. This allowed the rudder to fall on the flat bed and then approximately 30 inches to the concrete floor.One area 8 inches by 5 inches of the rudder frame and skin was pulled loos

4、e. One threaded lock was pulled loose and one threaded lock was stripped. Several rivets were popped on one of the counter weight attachments and minor bending on the lower end of the rudder.Lesson(s) Learned: 1. Failure to use appropriate holding/transport fixtures as defined within the specific ta

5、sk job card can result in damage to the rudder.2. Inadequate procedures to achieve safe removal of the rudder from the crane/sling can result in damage to the rudder.Recommendation(s): 1. Critical tasks such as rudder removal have been defined and a checklist has to be prepared to determine process,

6、 skill, tooling, training, and procedures requirements.2. During planning, if an area of the requirements is insufficient or a special circumstance exists, the checklist and documentation will be routed to engineering.3. Upon completion of the critical task planning function, the disciplines involve

7、d will approve Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the plan.4. Production will write a work instruction for each critical task, attach a pre-task checklistform, and coordinate with personnel involved in performint the task.5. Upon issuing

8、 instructions to the floor, the task supervisor will verify requirements, review and sign the checklist, and make sure each individual has the proper knowledge and skill.Evidence of Recurrence Control Effectiveness: An audit was performed to collect objective evidence that adequate controls have bee

9、n implemented and are working satisfactorily.Documents Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Aircrafta71 Flight Operationsa71 Flight Equipmenta71 Ground Operationsa71 Ground Equipmenta71 Lifting DevicesAdditional Info: Approval Info: a71 Approval Date: 2000-06-5a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS EN 62697-1-2012 Test methods for quantitative determination of corrosive sulphur compounds in unused and used insulating liquids Test method for quantitative determination of di.pdf BS EN 62697-1-2012 Test methods for quantitative determination of corrosive sulphur compounds in unused and used insulating liquids Test method for quantitative determination of di.pdf
  • BS EN 62698-2013 Multimedia home server systems Rights information interoperability for IPTV《多媒体家庭服务器系统 IPTV版权信息的互操作性》.pdf BS EN 62698-2013 Multimedia home server systems Rights information interoperability for IPTV《多媒体家庭服务器系统 IPTV版权信息的互操作性》.pdf
  • BS EN 62702-1-1-2016 Audio Archive System DVD disk and data migration for long term audio data storage《音频档案系统 长期音频数据存储用DVD光盘和数据迁移》.pdf BS EN 62702-1-1-2016 Audio Archive System DVD disk and data migration for long term audio data storage《音频档案系统 长期音频数据存储用DVD光盘和数据迁移》.pdf
  • BS EN 62703-2013 Expression of performance of fluorometric oxygen analyzers in liquid media《在液体介质中荧光氧分析仪的性能表示》.pdf BS EN 62703-2013 Expression of performance of fluorometric oxygen analyzers in liquid media《在液体介质中荧光氧分析仪的性能表示》.pdf
  • BS EN 62707-1-2014 LED-binning General requirements and white colour grid《发光二极管 (LED) 装箱 一般要求和白色网格》.pdf BS EN 62707-1-2014 LED-binning General requirements and white colour grid《发光二极管 (LED) 装箱 一般要求和白色网格》.pdf
  • BS EN 62708-2015 Document kinds for Electrical and Instrumentation Projects in the Process Industry《加工工业电气和仪表项目的文件类型》.pdf BS EN 62708-2015 Document kinds for Electrical and Instrumentation Projects in the Process Industry《加工工业电气和仪表项目的文件类型》.pdf
  • BS EN 62714-1-2014 Engineering data exchange format for use in industrial automation systems engineering Architecture and General Requirements《工业自动化系统中使用的工程数据交换格式 架构和通用要求》.pdf BS EN 62714-1-2014 Engineering data exchange format for use in industrial automation systems engineering Architecture and General Requirements《工业自动化系统中使用的工程数据交换格式 架构和通用要求》.pdf
  • BS EN 62714-2-2015 Engineering data exchange format for use in industrial automation systems engineering Automation markup language Role class libraries《工业自动化系统中使用的工程数据交换格式 自动化标记语言.pdf BS EN 62714-2-2015 Engineering data exchange format for use in industrial automation systems engineering Automation markup language Role class libraries《工业自动化系统中使用的工程数据交换格式 自动化标记语言.pdf
  • BS EN 62716-2013 Photovoltaic (PV) modules Ammonia corrosion testing《光伏(PV)组件 氨腐蚀测试》.pdf BS EN 62716-2013 Photovoltaic (PV) modules Ammonia corrosion testing《光伏(PV)组件 氨腐蚀测试》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1