1、Lessons Learned Entry: 0937Lesson Info:a71 Lesson Number: 0937a71 Lesson Date: 2001-01-01a71 Submitting Organization: KSCa71 Submitted by: Malcolm GlennSubject: Mobile Crane Mishap Description of Driving Event: A three-man crane operating crew was assisting a three-man crane overhaul crew to refurbi

2、sh a 140-ton crew and to refurbish a 110-ton government owned mobile crane on September 15, 2000. On this day, the overhaul crew was to install new boom pendants, requiring the cable bridle and its associated cables to be moved from its temporary stowage location behind the cab of the crane to a poi

3、nt on the boom where it could be attached to the boom pendants. To move the bridle with its associated cables forward along the length of the boom, a second 65-ton government owned mobile crane was used to lift the cable bridle assembly and pull it to the new location. The cable bridle (weighing app

4、roximately 1100 pounds) was attached to the hook of the 65-ton crane with a web sling (rated for 10,000 pound capacity in the vertical choker configuration) used in a horizontal choker configuration.The crane operating personnel were performing the following duties: One member operated the 65-ton cr

5、ane used to lift the cable bridle assembly and pull it to its new location. A second member operated the 140-ton crane in order to play out cable while the bridle assembly was being pulled. The third member was on the ground acting as the signalman for the two crane operators. With the three crane o

6、perating crew members in position and the overhaul crew members observing the operations, the cable bridle was lifted and slowly pulled along the boom of the 140-ton crane. During this movement the cable bridle underwent several yawing motions due to the cables binding on the sheaves as the cable un

7、spooled from the take-up drums. The sheaves were binding because the cables were being pulled at an angle and the choker hitch configuration did not keep the bridle straight and level with the direction of pull.The web sling failed allowing the bridle to fall. The bridle assembly impacted the butt s

8、ection of the boom of the 140-ton crane before it landed on the ground. At the same time, the block of the 65-ton crane swung back striking the stowed jib boom attached to the main boom of the 65-ton crane. The Provided by IHSNot for ResaleNo reproduction or networking permitted without license from

9、 IHS-,-,-jib boom of the 65-ton crane was a total loss because a portion of the main support section was severely damaged beyond repair. The butt section of the boom of the 140-ton crane was slightly bent and the bridle was damaged in several places. The falling cables cracked the overhead glass on

10、the cab of the 140-ton crane.Lesson(s) Learned: a71 Follow all procedures/instructions for handling and operation of materials and equipment. Ensure edge protection devices are used.a71 A single person is to be designated as the person in charge for all crane and hoist operations; as such, shall con

11、duct a pre-task briefing, establish a safety zone, ensure all equipment is in safe working order and the load properly rigged, prior to commencing operations.a71 Ensure written procedures are available and used for all crane and hoist operations involving complex configurations and/or requirements.

12、Prior to use, the written procedures shall have been reviewed and approved by appropriate levels of Management, Engineering, Safety and Health, and Quality.a71 Prohibit the use of cranes and hoists for pulling, dragging or any operations that would cause side loading unless the crane or hoist is spe

13、cifically designed to do so.Recommendation(s): Follow all procedures/instructions for handling and operations of materials and equipment. Ensure edge protection devices are used.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration S

14、ystemsa71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Ground OperationsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Lifting Devicesa71 Packaging Handling Storagea71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2001-05-17a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DS IEC 554-3-4-1981 Specification for cellulosic papers for electrical purposes Part 3 Specifications for individual materials Sheet 4 Electrolytic capacitor paper《电工用纤维素纸规范 第3部分 单.pdf DS IEC 554-3-4-1981 Specification for cellulosic papers for electrical purposes Part 3 Specifications for individual materials Sheet 4 Electrolytic capacitor paper《电工用纤维素纸规范 第3部分 单.pdf
  • DS IEC 554-3-5-1986 Specification for cellulosic papers for electrical purposes Part 3 Specifications for individual materials Sheet 5 Special papers《电工用纤维素纸规范 第3部分 单项材料规范 第5活页 专用纸.pdf DS IEC 554-3-5-1986 Specification for cellulosic papers for electrical purposes Part 3 Specifications for individual materials Sheet 5 Special papers《电工用纤维素纸规范 第3部分 单项材料规范 第5活页 专用纸.pdf
  • DS IEC 581-10-1987 High fidelity audio equipment and systems Minimum performance requirements Part 10 Headphones《高保真音响设备和系统 最低性能要求 第10部分 头戴式耳机》.pdf DS IEC 581-10-1987 High fidelity audio equipment and systems Minimum performance requirements Part 10 Headphones《高保真音响设备和系统 最低性能要求 第10部分 头戴式耳机》.pdf
  • DS IEC 581-5-1985 High fidelity audio equipment and systems Minimum performance requirements Part 5 Microphones《高保真音响设备和系统 最低性能要求 第5部分 传声器》.pdf DS IEC 581-5-1985 High fidelity audio equipment and systems Minimum performance requirements Part 5 Microphones《高保真音响设备和系统 最低性能要求 第5部分 传声器》.pdf
  • DS IEC 581-7-1987 High fidelity audio equipment and systems Minimum performance requirements Part 7 Loudspeakers《高保真音响设备和系统 最低性能要求 第7部分 扬声器》.pdf DS IEC 581-7-1987 High fidelity audio equipment and systems Minimum performance requirements Part 7 Loudspeakers《高保真音响设备和系统 最低性能要求 第7部分 扬声器》.pdf
  • DS IEC 667-1-1981 Specification for vulcanized fibre for electrical purposes Part 1 Definitions and general requirement《电工用硫化纤维制品规范 第1部分 定义和一般要求》.pdf DS IEC 667-1-1981 Specification for vulcanized fibre for electrical purposes Part 1 Definitions and general requirement《电工用硫化纤维制品规范 第1部分 定义和一般要求》.pdf
  • DS IEC 667-3-1-1988 Specification for vulcanized fibre for electrical purposes Part 3 Specifications for individual materials Sheet 1 Flat sheets《电工用硫化纤维制品规范 第3部分 单项材料规范 第1活页 扁片材》.pdf DS IEC 667-3-1-1988 Specification for vulcanized fibre for electrical purposes Part 3 Specifications for individual materials Sheet 1 Flat sheets《电工用硫化纤维制品规范 第3部分 单项材料规范 第1活页 扁片材》.pdf
  • DS IEC 68-2-49-1986 Basic environmental testing procedures Part 2 Tests Guidance to Test Kc Sulphur dioxide test for contacts and connections《基本环境试验规程 第2部分 试验 第49节 试验Kc导则 接触点和连接件的二.pdf DS IEC 68-2-49-1986 Basic environmental testing procedures Part 2 Tests Guidance to Test Kc Sulphur dioxide test for contacts and connections《基本环境试验规程 第2部分 试验 第49节 试验Kc导则 接触点和连接件的二.pdf
  • DS IEC 68-2-59-1992 Environmental testing Part 2 Tests Test Fe Vibration Sine-beat method《国际电工委员会IEC标准No 68-2-59-1990 环境试验 第2部分:试验 试验Fe:振动 正弦连击法》.pdf DS IEC 68-2-59-1992 Environmental testing Part 2 Tests Test Fe Vibration Sine-beat method《国际电工委员会IEC标准No 68-2-59-1990 环境试验 第2部分:试验 试验Fe:振动 正弦连击法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1