1、Lessons Learned Entry: 0979Lesson Info:a71 Lesson Number: 0979a71 Lesson Date: 2000-04-23a71 Submitting Organization: GSFCa71 Submitted by: Kevin GradySubject: Thruster Plume Impingement Description of Driving Event: On January 11, 2000, while the Terra spacecraft was attempting its first long orbit

2、 raising maneuver, the maneuver was prematurely terminated after 11 seconds of the burn. The burn was halted due to the fact that on-board attitude tolerance limit exceedences were detected. The flight computer correctly aborted the maneuver. There was no time critically for executing the maneuver o

3、n that particular day nor at that particular orbit, therefore a rigorous investigation ensued. This maneuver had been preceded by a calibration burn, which was analyzed and deemed to be nominal.Lesson(s) Learned: Several weeks of investigation proceeded, and a significant amount of analysis and mode

4、ling were performed. It was determined that the impingement of the thruster plumes from two of the attitude thrusters were producing a large torque, by impinging on the Terra solar array. The Terra solar array is a very large flexible blanket type array. The location of the array during the maneuver

5、 resulted in the worse possible orientation for plume interaction, and it also resulted in the largest possible moment arm between the center-of-pressure and center-of-gravity. The combination of these two factors resulted in the larger than expected disturbance torque, which led to the attitude dis

6、turbance and the shutdown of the orbit raising maneuver.Subsequent to numerous analyses and simulations, an optimal orientation for the solar array during the maneuvers was determined, and a modified thruster torque transformation matrix were developed. The torque transformation matrix accounted for

7、 the residual disturbance which was still induced, even with the solar array in the optmized orientation.A series of smaller orbit raising maneuvers were performed to verify the software changes. The maneuvers executed without problems. Long duration maneuvers were then performed. These Provided by

8、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-maneuvers were likewise successful. Terra reached its operational orbit and began flying in formation with Landsat 7 in February 2000.Upon reviewing the process on why this error was not detected before launch, it

9、was determined that no direct modeling of the plume impingement phenomena was ever performed. Plume effects were accounted for via a design allocation process; however, the torque that was allocated in the design process was inadequate. The allocation was not verified via a closed-loop simulation si

10、mulation.This experience reaffirms the value of performing high fidelity 3-axis simulations prior to launch. This is particularly true as spacecraft grow, and surface areas become larger. The utility of high fidelity 3-axis simulations is unquestionable, and should be performed as a routine and cont

11、inuous part of the spacecraft design process.Recommendation(s): This experience reaffirms the value of performing high fidelity 3-axis simulations prior to launch. This is particularly true as spacecraft grow, and surface areas become larger. The utility of high fidelity 3-axis simulations is unques

12、tionable, and should be performed as a routine and continuous part of the spacecraft design process.Evidence of Recurrence Control Effectiveness: All subsequent orbital raising maneuvers were nominal.Documents Related to Lesson: N/AMission Directorate(s): a71 ScienceAdditional Key Phrase(s): a71 Spa

13、cecrafta71 Test & VerificationAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2001-08-06a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ETSI TR 102 522-2006 Electromagnetic compatibility and Radio spectrum Matters (ERM) Short Range Devices (SRD) Equipment for Detecting Movement Radio equipment operating in the freq.pdf ETSI TR 102 522-2006 Electromagnetic compatibility and Radio spectrum Matters (ERM) Short Range Devices (SRD) Equipment for Detecting Movement Radio equipment operating in the freq.pdf
  • ETSI TR 102 522-2006 Electromagnetic compatibility and Radio spectrum Matters (ERM) Short Range Devices (SRD) Equipment for Detecting Movement Radio equipment operating in the freq_1.pdf ETSI TR 102 522-2006 Electromagnetic compatibility and Radio spectrum Matters (ERM) Short Range Devices (SRD) Equipment for Detecting Movement Radio equipment operating in the freq_1.pdf
  • ETSI TR 102 525-2006 Satellite Earth Stations and Systems (SES) Satellite Digital Radio (SDR) service Functionalities architecture and technologies (V1 1 1)《卫星地面站和系统(SES) 卫星数字无线电(S.pdf ETSI TR 102 525-2006 Satellite Earth Stations and Systems (SES) Satellite Digital Radio (SDR) service Functionalities architecture and technologies (V1 1 1)《卫星地面站和系统(SES) 卫星数字无线电(S.pdf
  • ETSI TR 102 525-2006 Satellite Earth Stations and Systems (SES) Satellite Digital Radio (SDR) service Functionalities architecture and technologies (V1 1 1)《卫星地面站和系统(SES) 卫星数字无线电(S_1.pdf ETSI TR 102 525-2006 Satellite Earth Stations and Systems (SES) Satellite Digital Radio (SDR) service Functionalities architecture and technologies (V1 1 1)《卫星地面站和系统(SES) 卫星数字无线电(S_1.pdf
  • ETSI TR 102 526-2006 Speech Processing Transmission and Quality Aspects (STQ) Wideband telephony considerations (V1 1 1)《语音的处理 传输与质量方面(STQ) 宽带电话的考虑事项(版本1 1 1)》.pdf ETSI TR 102 526-2006 Speech Processing Transmission and Quality Aspects (STQ) Wideband telephony considerations (V1 1 1)《语音的处理 传输与质量方面(STQ) 宽带电话的考虑事项(版本1 1 1)》.pdf
  • ETSI TR 102 528-2006 Lawful Interception (LI) Interception domain Architecture for IP networks (V1 1 1)《合法侦听(LI) IP网络的拦截域结构(版本1 1 1)》.pdf ETSI TR 102 528-2006 Lawful Interception (LI) Interception domain Architecture for IP networks (V1 1 1)《合法侦听(LI) IP网络的拦截域结构(版本1 1 1)》.pdf
  • ETSI TR 102 529-2009 Speech and Multimedia Transmission Quality (STQ) SMS Testing Guidelines Measurement Methodologies and Quality Aspects (V1 1 1)《语音和多媒体传输质量(STQ) SMS测试指南 测量方法和质量方.pdf ETSI TR 102 529-2009 Speech and Multimedia Transmission Quality (STQ) SMS Testing Guidelines Measurement Methodologies and Quality Aspects (V1 1 1)《语音和多媒体传输质量(STQ) SMS测试指南 测量方法和质量方.pdf
  • ETSI TR 102 529-2009 Speech and Multimedia Transmission Quality (STQ) SMS Testing Guidelines Measurement Methodologies and Quality Aspects (V1 1 1)《语音和多媒体传输质量(STQ) SMS测试指南 测量方法和质量方_1.pdf ETSI TR 102 529-2009 Speech and Multimedia Transmission Quality (STQ) SMS Testing Guidelines Measurement Methodologies and Quality Aspects (V1 1 1)《语音和多媒体传输质量(STQ) SMS测试指南 测量方法和质量方_1.pdf
  • ETSI TR 102 530-2011 Environmental Engineering (EE) The reduction of energy consumption in telecommunications equipment and related infrastructure (V1 2 1)《环境工程(EE) 通信设备和相关基础设施的能耗降.pdf ETSI TR 102 530-2011 Environmental Engineering (EE) The reduction of energy consumption in telecommunications equipment and related infrastructure (V1 2 1)《环境工程(EE) 通信设备和相关基础设施的能耗降.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1