REG NASA-LLIS-0998-1997 Lessons Learned Integrity of Space Shuttle Processing Quality Assurance Procedures.pdf

上传人:fatcommittee260 文档编号:1018643 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.12KB
下载 相关 举报
REG NASA-LLIS-0998-1997 Lessons Learned Integrity of Space Shuttle Processing Quality Assurance Procedures.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-0998-1997 Lessons Learned Integrity of Space Shuttle Processing Quality Assurance Procedures.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0998Lesson Info:a71 Lesson Number: 0998a71 Lesson Date: 1997-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: Integrity of Space Shuttle Processing Quality Assurance Procedures Description of Driving Event: Postflight discovery of a wrench and an

2、equipment name plate in the forward skirt of one STS-79 Solid Rocket Booster (SRB) has heightened concern for the overall integrity of Space Shuttle processing quality assurance procedures.Lesson(s) Learned: Postflight discovery of a wrench and an equipment name plate in the forward skirt of one STS

3、79 Solid Rocket Booster (SRB) has heightened concern for the overall integrity of Space Shuttle processing quality assurance procedures.Recommendation(s): NASA, in concert with the several Space Shuttle contractors, should conduct an in-depth review of Space Shuttle processing quality assurance pro

4、cedures focused on creating a more formal, documented approach to accounting for tools and other material introduced to and removed from flight hardware work areas.Evidence of Recurrence Control Effectiveness: The Space Shuttle program element contractors presented their tool control programs to the

5、 Space Shuttle System Safety Review Panel (SSRP) meeting in December 1996. The SSRP reviewed the tool control programs of all the contractors and determined that each of the tool programs was effective for the type of work per-formed. The SSRP recommended that tool accounting audits be maintained or

6、 increased, and that metrics be maintained to assure that each tool control program remains effective. In a letter dated March 20, 1997, the Space Shuttle Systems Integration Office Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-confirmed that NSTS

7、07700, “Space Shuttle Program Definition and Requirements,“ requires tool control for only the launch and landing project, and recommended that Volume XI of NSTS 0770 be expanded to include tool control at the manufacturing facilities. A change request to NSTS 07700, Volume XI, adding the program re

8、quirement to include tool control at the element manufacturing facilities, was approved by the Program Requirements Control Board (PRCB) on July 10, 1997.Documents Related to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Administration/Or

9、ganizationa71 Aerospace Safety Advisory Panela71 Ground Operationsa71 Human Resources & Educationa71 Packaging Handling Storagea71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2001-11-01a71 Approval Name: Bill Loewya71 Approval Organization: QSa71 Approval Phone Number: 202-358-0528Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS 5598-8-1980 Methods of sampling and test for halogenated hydrocarbons - Determination of non-volatile residue in fluorinated hydrocarbons《卤代烃取样和试验方法 第8部分 氟化烃非挥发性残渣测定》.pdf BS 5598-8-1980 Methods of sampling and test for halogenated hydrocarbons - Determination of non-volatile residue in fluorinated hydrocarbons《卤代烃取样和试验方法 第8部分 氟化烃非挥发性残渣测定》.pdf
  • BS 5600-1 1-1979 Powder metallurgical materials and products - General information - Introduction and contents《粉末冶金材料和制品 第1部分 总则 第1节 前言和目录》.pdf BS 5600-1 1-1979 Powder metallurgical materials and products - General information - Introduction and contents《粉末冶金材料和制品 第1部分 总则 第1节 前言和目录》.pdf
  • BS 5605-1990 Recommendations for citing and referencing published material《援引和查询出版物用推荐标准》.pdf BS 5605-1990 Recommendations for citing and referencing published material《援引和查询出版物用推荐标准》.pdf
  • BS 5607-2017 Code of practice for the safe use of explosives in the construction industry《建造业安全使用爆炸品业务守则》.pdf BS 5607-2017 Code of practice for the safe use of explosives in the construction industry《建造业安全使用爆炸品业务守则》.pdf
  • BS 5608-1993 Specification for preformed rigid polyurethane (PUR) and polyisocyanurate (PIR) foams for thermal insulation of pipework and equipment《管道工程和设备隔热用预成型刚性聚氨基甲酸乙酯(PUR)和聚异氰尿.pdf BS 5608-1993 Specification for preformed rigid polyurethane (PUR) and polyisocyanurate (PIR) foams for thermal insulation of pipework and equipment《管道工程和设备隔热用预成型刚性聚氨基甲酸乙酯(PUR)和聚异氰尿.pdf
  • BS 5609-1986 Specification for printed pressure-sensitive adhesive-coated labels for marine use including requirements for label base material《船舶用印制压敏胶粘标签规范 包括标签的基本材料要求》.pdf BS 5609-1986 Specification for printed pressure-sensitive adhesive-coated labels for marine use including requirements for label base material《船舶用印制压敏胶粘标签规范 包括标签的基本材料要求》.pdf
  • BS 561-1951 Specification for alternating-current line relays double-element 3-position (for railway signalling)《铁路信号用3位置、双元交流线路继电器规范》.pdf BS 561-1951 Specification for alternating-current line relays double-element 3-position (for railway signalling)《铁路信号用3位置、双元交流线路继电器规范》.pdf
  • BS 5610-1978 Surface active agents - detergents for washing fabrics - guide for comparative testing of performance《表面活性剂 织物洗涤剂 性能对比试验导则》.pdf BS 5610-1978 Surface active agents - detergents for washing fabrics - guide for comparative testing of performance《表面活性剂 织物洗涤剂 性能对比试验导则》.pdf
  • BS 5611-1978 Application guide for on-load tap-changers《负载分接头切换开关应用指南》.pdf BS 5611-1978 Application guide for on-load tap-changers《负载分接头切换开关应用指南》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1