REG NASA-LLIS-0998-1997 Lessons Learned Integrity of Space Shuttle Processing Quality Assurance Procedures.pdf

上传人:fatcommittee260 文档编号:1018643 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.12KB
下载 相关 举报
REG NASA-LLIS-0998-1997 Lessons Learned Integrity of Space Shuttle Processing Quality Assurance Procedures.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-0998-1997 Lessons Learned Integrity of Space Shuttle Processing Quality Assurance Procedures.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0998Lesson Info:a71 Lesson Number: 0998a71 Lesson Date: 1997-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: Integrity of Space Shuttle Processing Quality Assurance Procedures Description of Driving Event: Postflight discovery of a wrench and an

2、equipment name plate in the forward skirt of one STS-79 Solid Rocket Booster (SRB) has heightened concern for the overall integrity of Space Shuttle processing quality assurance procedures.Lesson(s) Learned: Postflight discovery of a wrench and an equipment name plate in the forward skirt of one STS

3、79 Solid Rocket Booster (SRB) has heightened concern for the overall integrity of Space Shuttle processing quality assurance procedures.Recommendation(s): NASA, in concert with the several Space Shuttle contractors, should conduct an in-depth review of Space Shuttle processing quality assurance pro

4、cedures focused on creating a more formal, documented approach to accounting for tools and other material introduced to and removed from flight hardware work areas.Evidence of Recurrence Control Effectiveness: The Space Shuttle program element contractors presented their tool control programs to the

5、 Space Shuttle System Safety Review Panel (SSRP) meeting in December 1996. The SSRP reviewed the tool control programs of all the contractors and determined that each of the tool programs was effective for the type of work per-formed. The SSRP recommended that tool accounting audits be maintained or

6、 increased, and that metrics be maintained to assure that each tool control program remains effective. In a letter dated March 20, 1997, the Space Shuttle Systems Integration Office Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-confirmed that NSTS

7、07700, “Space Shuttle Program Definition and Requirements,“ requires tool control for only the launch and landing project, and recommended that Volume XI of NSTS 0770 be expanded to include tool control at the manufacturing facilities. A change request to NSTS 07700, Volume XI, adding the program re

8、quirement to include tool control at the element manufacturing facilities, was approved by the Program Requirements Control Board (PRCB) on July 10, 1997.Documents Related to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Administration/Or

9、ganizationa71 Aerospace Safety Advisory Panela71 Ground Operationsa71 Human Resources & Educationa71 Packaging Handling Storagea71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2001-11-01a71 Approval Name: Bill Loewya71 Approval Organization: QSa71 Approval Phone Number: 202-358-0528Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1