REG NASA-LLIS-1092--2002 Lessons Learned - Project management processes for addressing off-track performance.pdf

上传人:Iclinic170 文档编号:1018731 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.08KB
下载 相关 举报
REG NASA-LLIS-1092--2002 Lessons Learned - Project management processes for addressing off-track performance.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-1092--2002 Lessons Learned - Project management processes for addressing off-track performance.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1092Lesson Info:a71 Lesson Number: 1092a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: Joan Salute / Dr. MendozaSubject: Project management processes for addressing off-track performance Description of Driving Event: Several design drawings were de

2、livered late because the responsible engineer (RE) did not have the appropriate level of experience to complete the work and did not ask for help. In addition to not asking for help or communicating any other concerns about the drawings, the RE assumed they could recover the slip in schedule by thei

3、r own efforts and relayed this to the Project Manager (PM). Therefore, the PM who was addressing known issues did not see sufficient evidence to become involved. Eventually, the PM could not rely on the REs assurances and decided to enlist the help of drawing experts to complete the drawings.Lesson(

4、s) Learned: People, especially those not familiar with each other, may not be comfortable about discussing work performance issues and asking for help. To overcome these communication barriers, Projects should have a process for reporting when assigned tasks will not meet their requirements. This pr

5、ocess should be a requirement on all Project personnel so that management can address concerns prior to them becoming problems.Recommendation(s): In addition to developing and implementing work processes for standard organizational performance, establish a process for reporting when assigned tasks w

6、ill not meet their requirements and their corresponding corrective actions. This process should include trigger points (such as percent off schedule or spending) that require project personnel to seek management attention. Having this process in place throughout the project lifecycle will overcome t

7、he barriers people may have about asking for help and off-plan performance can be corrected appropriately.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directo

8、rate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Administration/Organizationa71 Human Factorsa71 Policy & Planninga71 Risk Management/AssessmentAdditional Info: Approval Info: a71 Approval Date: 2002-02-12a71 Approval Name: ARCa71 Approval Organization: Anthony Bricenoa71 Approval Phone Number: 650-276-2825Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ITU-T L 1222-2018 Innovative energy storage technology for stationary use C Part 3 Supercapacitor technology (Study Group 5).pdf ITU-T L 1222-2018 Innovative energy storage technology for stationary use C Part 3 Supercapacitor technology (Study Group 5).pdf
  • ITU-T L 13 FRENCH-2003 Performance requirements for passive optical nodes Sealed closures for outdoor environments《无源光节点的性能要求 室外环境的密封闭包 系列L 施工安装和电缆以及其它外部线缆元件的保护 6号研究组》.pdf ITU-T L 13 FRENCH-2003 Performance requirements for passive optical nodes Sealed closures for outdoor environments《无源光节点的性能要求 室外环境的密封闭包 系列L 施工安装和电缆以及其它外部线缆元件的保护 6号研究组》.pdf
  • ITU-T L 13 SPANISH-2003 Performance requirements for passive optical nodes Sealed closures for outdoor environments《无源光节点的性能要求 室外环境的密封闭包 系列L 施工安装和电缆以及其它外部线缆元件的保护 6号研究组》.pdf ITU-T L 13 SPANISH-2003 Performance requirements for passive optical nodes Sealed closures for outdoor environments《无源光节点的性能要求 室外环境的密封闭包 系列L 施工安装和电缆以及其它外部线缆元件的保护 6号研究组》.pdf
  • ITU-T L 13-2003 Performance requirements for passive optical nodes Sealed closures for outdoor environments SERIES L CONSTRUCTION INSTALLATION AND PROTECTION OF CABLES AND OTHER EL.pdf ITU-T L 13-2003 Performance requirements for passive optical nodes Sealed closures for outdoor environments SERIES L CONSTRUCTION INSTALLATION AND PROTECTION OF CABLES AND OTHER EL.pdf
  • ITU-T L 1300-2014 Best practices for green data centres (Study Group 5)《绿色数据中心的最佳实践(研究组5)》.pdf ITU-T L 1300-2014 Best practices for green data centres (Study Group 5)《绿色数据中心的最佳实践(研究组5)》.pdf
  • ITU-T L 1301-2015 Minimum data set and communication interface requirements for data centre energy management (Study Group 5)《数据中心能源管理的最小数据集和通信接口要求(研究组5)》.pdf ITU-T L 1301-2015 Minimum data set and communication interface requirements for data centre energy management (Study Group 5)《数据中心能源管理的最小数据集和通信接口要求(研究组5)》.pdf
  • ITU-T L 1302-2015 Assessment of energy efficiency on infrastructure in data centres and telecom centres (Study Group 5)《数据中心和电信中心能源效率的基础设施评估(研究组5)》.pdf ITU-T L 1302-2015 Assessment of energy efficiency on infrastructure in data centres and telecom centres (Study Group 5)《数据中心和电信中心能源效率的基础设施评估(研究组5)》.pdf
  • ITU-T L 1310-2014 Energy efficiency metrics and measurement methods for telecommunication equipment (Study Group 5)《电信设备的能源效率指标和测量方法(研究组5)》.pdf ITU-T L 1310-2014 Energy efficiency metrics and measurement methods for telecommunication equipment (Study Group 5)《电信设备的能源效率指标和测量方法(研究组5)》.pdf
  • ITU-T L 1310-2017 Energy efficiency metrics and measurement methods for telecommunication equipment (Study Group 5).pdf ITU-T L 1310-2017 Energy efficiency metrics and measurement methods for telecommunication equipment (Study Group 5).pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1