REG NASA-LLIS-1491-2004 Lessons Learned Thorough Risk Assessment in the Design Phase.pdf

上传人:diecharacter305 文档编号:1019129 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.85KB
下载 相关 举报
REG NASA-LLIS-1491-2004 Lessons Learned Thorough Risk Assessment in the Design Phase.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1491-2004 Lessons Learned Thorough Risk Assessment in the Design Phase.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1491-2004 Lessons Learned Thorough Risk Assessment in the Design Phase.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1491Lesson Info:a71 Lesson Number: 1491a71 Lesson Date: 2004-04-26a71 Submitting Organization: LARCa71 Submitted by: Richard J. GilbrechSubject: Thorough Risk Assessment in the Design Phase Abstract: In November of 2003, the NASA Engineering and Safety Center (NESC) performed

2、an Independent Technical Assessment of the Code Y CALIPSO satellite Proteus propulsion bus (ref. NESC Final Report NESC-RP-001, NASA Technical Memorandum number applied for). This is a joint mission with NASA GSFC, LaRC and the Centre National dEtudes Spatiales (CNES) scheduled to launch from Vanden

3、berg Air Force base in April 2005 on a Delta II rocket. Several personnel safety hazards related to the hydrazine-fueled Proteus propulsion bus could have been minimized or avoided in the design phase.Description of Driving Event: The GSFC/LaRC Integrated Program Management Council co-chair, William

4、 Townsend (Deputy Center Director at GSFC) requested the NASA Engineering and Safety Center to review three personnel hazards associated with the CALIPSO satellite Proteus propulsion bus: 1-hydrazine leakage from the five threaded A/N fluid fittings, 2-hydrazine leakage through the thrusters and 3-i

5、nadvertent firing of the thrusters. These personnel hazards exist only during the period when the system is filled and pressurized until launch (approximately 36 days). The pre-ship review of the instrument (supplied by Ball Aerospace and integrated into the spacecraft by Alcatel Space Industries) w

6、as the driving program milestone that precipitated this review and subsequent lesson learned. At the time of the independent assessment, the spacecraft had been through its critical design review and the Proteus bus was already fabricated. The choice of mechanical A/N fittings instead of welded join

7、ts provided an area of concern for leakage of hydrazine propellant during ground processing. The use of a tank isolation valve for the hydrazine system (absent on the Proteus bus) would have provided improved safety during ground operations, but both mechanical fittings and a system without an isola

8、tion valve can be made safe by adhering to assembly and processing procedures. A thorough risk assessment in the design phase would have probed and documented the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-rationale for these design decisions an

9、d perhaps resulted in a different flight configuration.Lesson(s) Learned: In the design phase of a project, a thorough risk assessment must be performed to ensure a configuration that provides the overall minimum risk to personnel, the mission, and the environment. While current NASA policy does req

10、uire a risk assessment, it is important to include all stages of project development when evaluating any potential hazards, including ground processing and integration. Recommendation(s): Programs and projects shall follow the guidance in NASA Procedural Requirement 7120.5B “NASA Program and Project

11、 Management Processes and Requirements“ that stipulates risk assessments be done throughout the project lifecycle which includes the design phase. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: NPR 7120.5BMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Sp

12、ace Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Flight Equipmenta71 Ground Operationsa71 NASA Standardsa71 Program and Project Managementa71 Range Operationsa71 Risk Management/Assessmenta71 SpacecraftProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Approval Info: a71 Approval Date: 2004-05-26a71 Approval Name: Leslie Johnsona71 Approval Organization: LARCa71 Approval Phone Number: 757-864-9409Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • FORD ESB-M4D300-A-2008 ABS MOLDING COMPOUND HIGH IMPACT - HIGH TEMPERATURE  TO BE USED WITH FORD WSS-M99P1111-A  《丙烯腈-丁二烯-苯乙烯模塑料 耐冲击 耐高温(和FORD WSS-M99P1111-A一起使用)(使用 FORD WSB-M4D69.pdf FORD ESB-M4D300-A-2008 ABS MOLDING COMPOUND HIGH IMPACT - HIGH TEMPERATURE TO BE USED WITH FORD WSS-M99P1111-A 《丙烯腈-丁二烯-苯乙烯模塑料 耐冲击 耐高温(和FORD WSS-M99P1111-A一起使用)(使用 FORD WSB-M4D69.pdf
  • FORD ESB-M4D308-A-1983 POLYPROPYLENE HIGH IMPACT GRADE - INJECTION MOLDING《高抗冲级聚丙烯(PP)注塑塑料》.pdf FORD ESB-M4D308-A-1983 POLYPROPYLENE HIGH IMPACT GRADE - INJECTION MOLDING《高抗冲级聚丙烯(PP)注塑塑料》.pdf
  • FORD ESB-M4D308-B-2006 POLYPROPYLENE FOAMED EXTRUSION  TO BE USED WITH FORD WSS-M99P1111-A  《聚丙烯(PP)泡沫挤塑塑料  与标准FORD WSS-M99P1111-A一起使用  使用ESB-M4D308-A》.pdf FORD ESB-M4D308-B-2006 POLYPROPYLENE FOAMED EXTRUSION TO BE USED WITH FORD WSS-M99P1111-A 《聚丙烯(PP)泡沫挤塑塑料 与标准FORD WSS-M99P1111-A一起使用 使用ESB-M4D308-A》.pdf
  • FORD ESB-M4D311-A-2008 POLYETHYLENE HIGH DENSITY - EXTRUSION GRADE - EXTERIOR  TO BE USED WITH FORD WSS-M99P1111-A  《汽车外部用挤塑级高密度聚乙烯  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD ESB-M4D311-A-2008 POLYETHYLENE HIGH DENSITY - EXTRUSION GRADE - EXTERIOR TO BE USED WITH FORD WSS-M99P1111-A 《汽车外部用挤塑级高密度聚乙烯 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD ESB-M4D317-A-2010 POLYVINYL CHLORIDE INJECTION MOLDING COMPOUND - ELECTRICAL GRADE  TO BE USED WITH FORD WSS-M99P1111-A  《电气级喷射成型聚氯乙烯  与福特WSS-M99P1111-A  一起使用》.pdf FORD ESB-M4D317-A-2010 POLYVINYL CHLORIDE INJECTION MOLDING COMPOUND - ELECTRICAL GRADE TO BE USED WITH FORD WSS-M99P1111-A 《电气级喷射成型聚氯乙烯 与福特WSS-M99P1111-A 一起使用》.pdf
  • FORD ESB-M4D330-A1-2011 IONOMER (ETHYLENE) MOLDING COMPOUND CLEAR  TO BE USED WITH FORD WSS-M99P1111-A  《清晰的离聚物(乙烯)模塑材料  与福特WSS-M99P1111-A  一起使用》.pdf FORD ESB-M4D330-A1-2011 IONOMER (ETHYLENE) MOLDING COMPOUND CLEAR TO BE USED WITH FORD WSS-M99P1111-A 《清晰的离聚物(乙烯)模塑材料 与福特WSS-M99P1111-A 一起使用》.pdf
  • FORD ESB-M4D330-A2-2011 IONOMER (ETHYLENE) MOLDING COMPOUND PIGMENTED ZINC TYPE - EXTERIOR GRADE - PAINTABLE  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD ESB-M4D330-A1)《外部级.pdf FORD ESB-M4D330-A2-2011 IONOMER (ETHYLENE) MOLDING COMPOUND PIGMENTED ZINC TYPE - EXTERIOR GRADE - PAINTABLE TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD ESB-M4D330-A1)《外部级.pdf
  • FORD ESB-M4D330-A4-2011 IONOMER (ETHYLENE) MOLDING COMPOUND BLACK SODIUM TYPE - EXTERIOR GRADE - NOT PAINTABLE  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD ESB-M4D330-A1)《外.pdf FORD ESB-M4D330-A4-2011 IONOMER (ETHYLENE) MOLDING COMPOUND BLACK SODIUM TYPE - EXTERIOR GRADE - NOT PAINTABLE TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD ESB-M4D330-A1)《外.pdf
  • FORD ESB-M4D330-A5-2011 IONOMER (ETHYLENE) MOLDING COMPOUND FOAMED GLASS FILLED - BLACK - ZINC SODIUM TYPE EXTERIOR GRADE  TO BE USED WITH FORD WSS-M99P1111-A  《外部级黑锌 钠型泡沫玻璃填充离聚物(乙.pdf FORD ESB-M4D330-A5-2011 IONOMER (ETHYLENE) MOLDING COMPOUND FOAMED GLASS FILLED - BLACK - ZINC SODIUM TYPE EXTERIOR GRADE TO BE USED WITH FORD WSS-M99P1111-A 《外部级黑锌 钠型泡沫玻璃填充离聚物(乙.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1