1、Lessons Learned Entry: 1586Lesson Info:a71 Lesson Number: 1586a71 Lesson Date: 2004-07-01a71 Submitting Organization: MSFCa71 Submitted by: Donald Dugala71 Authored by: Stephen CookSubject: Next Generation Launch Technology (NGLT)/Early Development of a Systems Engineering Management Plan is Critica
2、l Abstract: NGLT experienced continual disagreement over processes, procedures and products to be used by the Programs SE&A teams, all of which came from different legacy programs, each possessing different requirements and Center perspectives (e.g., search versus development). Programs should defin
3、e, plan, and agree to processes, procedures, and products for the SE&A process as early as possible and formally document in a SEMP. Description of Driving Event: NGLT experienced continual disagreement over processes, procedures and products to be used by the Programs SE&A teams, all of which came
4、from different legacy programs, each possessing different requirements and Center perspectives (e.g., search versus development). For example, inconsistencies in weights and sizing models and differences in definitions of subsystems, combined with insufficient technical exchange with the various arc
5、hitectural teams, led to incorrect interpretation of data, and inaccurate and/or misleading results that required rework. Lesson(s) Learned: An agreed-to set of processes, procedures, and products, documented in a base-lined and approved Systems Engineering Management Plan (SEMP) would have greatly
6、enhanced the effectiveness of the systems engineering and analysis teams. The SEMP should have been the first item addressed by the SE&A leadership to create a common understanding of definitions, methods, and processes to be utilized. Provided by IHSNot for ResaleNo reproduction or networking permi
7、tted without license from IHS-,-,-Recommendation(s): Programs should define, plan, and agree to processes, procedures, and products for the SE&A process as early as possible and formally document in a SEMP. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Dire
8、ctorate(s): a71 Exploration Systemsa71 Aeronautics Researcha71 Space OperationsAdditional Key Phrase(s): a71 Administration/Organizationa71 Financial Managementa71 Policy & Planninga71 Program and Project Managementa71 Research & Developmenta71 Risk Management/AssessmentAdditional Info: Approval Info: a71 Approval Date: 2006-04-10a71 Approval Name: dkruhma71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-