1、Lessons Learned Entry: 1850Lesson Info:a71 Lesson Number: 1850a71 Submitting Organization: KSCa71 Submitted by: Scott Estesa71 POC Name: Scott EstesSubject: Lessons Learned from the KSC Checkout and Launch Control System (CLCS) - Final Briefing Abstract: The CLCS project was initiated in FY 1997 to
2、modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe and dependable launch support for the Shuttle program. Per initial planning, CLCS was projected to reduce the costs for Shuttle operations at KSC, in add
3、ition to being an architecture in place that would support future planning and new program activities to occur at KSC. The CLCS project experienced many significant challenges even from the project startup (i.e., time and resources that included both funding and manpower). The following are the majo
4、r lessons learned from the CLCS project: 1. Independent Project Oversight 2. Control Project Requirements 3. Risk Management Mitigation 4. System Integration 5. System Performance Management 6. Appropriate Use of COTS 7. Application Software 8. Software Implementation 9. Communications 10. Cost Esti
5、mating 11. Contract VehicleDescription of Driving Event: N/AProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lesson(s) Learned: N/ARecommendation(s): N/AEvidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: Click here to downlo
6、ad document. Mission Directorate(s): N/AAdditional Key Phrase(s): a71 Additional Categories.Launch Processa71 Additional Categories.Launch VehicleAdditional Info: Approval Info: a71 Approval Date: 2008-04-25a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-