资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 75 00 (May 2012)-Preparing Activity: NASA SupersedingNASA-01 75 00 (October 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 75 00STARTING AND ADJUSTING05/12PART 1 GENERAL1.1 SUMMARY1.2 SUBMITTA

2、LS1.2.1 Preconstruction and Pre-Testing Requirements1.2.2 Shop Drawings and Diagrams1.2.3 Product and Design Data1.2.4 Tests Required1.2.4.1 Factory Tests1.2.4.2 Functional Field Test1.2.4.3 Final Acceptance Test1.2.4.4 Test ProceduresPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents

3、 -SECTION 01 75 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 75 00 (May 2012)-Preparing Activity: NASA SupersedingNASA-01 75 00 (October 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION 01 75 00

4、STARTING AND ADJUSTING05/12*NOTE: This guide specification covers the requirements for system testing and acceptance.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this

5、guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggest

6、ions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 SUMMARYRequirements of this Section apply to, and are a component part of, each section of the specifications.1.2 SUBMITTALS*NOTE: Review Submittal Desc

7、ription (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires

8、 Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the SECTION 01 75 00 Page 2Provided by IHSNot for ResaleNo reproduction or netwo

9、rking permitted without license from IHS-,-,-submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the ap

10、proving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes fol

11、lowing the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G

12、“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:*NOTE: Edit th

13、e following Submittals to fit the requirements of the project.*SD-01 Preconstruction SubmittalsVerification of Prior Experience; G; G, _Documentation of Manufacturers Prior Experience; G; G, _Quality Control Plan; G; G, _Manufacturers Sample Warranty; G; G, _Operation and Maintenance Data; G; G, _Pr

14、ovide Evidence; G; G, _SD-02 Shop Drawings Drawings, Diagrams and Schedules; G; G, _ Diagrams and Instructions; G; G, _ Coordination Drawings; G; G, _ SD-03 Product DataCatalog Cuts; G; G, _SECTION 01 75 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr

15、om IHS-,-,-Samples of Warranty Language; G; G, _SD-05 Design DataDesign Calculations; G; G, _SD-06 Test ReportsFactory Tests; G; G, _Functional Field Test; G; G, _Final Acceptance Test,; G; G, _Test Procedures; G; G, _SD-07 Certificates Qualification of Manufacturer; G; G, _ Qualification of Applica

16、torInstaller; G; G, _SD-08 Manufacturers Instructions*NOTE: Edit the manufacturers instructions submission requirements as necessary for the system specified. Include bracketed requirements only as applicable to the system being specified.* Manufacturers Administrative Requirements; G; G, _ Demonstr

17、ation and Training Information; G; G, _ Manufacturers Procedural Requirements; G; G, _ SD-09 Manufacturers Field Reports*NOTE: Edit the manufacturers field reports submission requirements as necessary for the system specified. Include bracketed requirements only as applicable to the system being spe

18、cified.*Documentation of the Testing and Verification Actions; G; G, _SD-10 Operation and Maintenance DataOperation and Maintenance Data; G; G, _ Safety and Security Data or Posters; G; G, _1.2.1 Preconstruction and Pre-Testing Requirements*NOTE: Edit the following testing information based SECTION

19、01 75 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-on the requirements of the scope, equipment, and/or system. For NASA projects, refer to the 2004 version of the Reliability Centered Building and Equipment Acceptance Guide (RCBEA) to sel

20、ect the recommended Predictive Testing and Inspection (PT including, but not limited to:a. Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some por

21、tion of the workb. Samples of warranty language when the contract requires extendedno dollar limit product warrantiesc. Operation and Maintenance Data provided by the manufacturer to ensure the safe and efficient operation, maintenance and repair of the system or equipment providedd. Safety and Secu

22、rity Data or posters provided by the manufacturer to be posted in a conspicuous visible location for operational and maintenance personnel1.2.4 Tests Required*NOTE: Edit the following testing information based on the requirements of the scope, equipment, and/or system. Clearly define the acceptance

23、criteria testing parameters and the recommended Predictive Testing and Inspection (PT&I) procedures.*Perform tests to verify proper functioning of fire protection, fire suppression, HVAC, compressed air, electrical switchgear, protective relaying, fluid and gas systems, pump/motor combinations, boil

24、er systems, hydraulic and pneumatic control, condition/performance monitoring systems, energy control and monitoring systems, and other assemblies and components that need to be tested as an interrelated whole.SECTION 01 75 00 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitte

25、d without license from IHS-,-,-1.2.4.1 Factory TestsSubmit certified copies of required tests performed at the factory to verify proper build. These test results will be used in the “Final Acceptance Test“ section to verify no shipping damage and proper installation.1.2.4.2 Functional Field TestCont

26、ractor must perform functional field tests test to verify that the system and components have been properly installed and are functioning properly. Perform test(s) in the presence of the Contracting Officer. Acceptance will be issued when system has performed per other sections and referenced indust

27、ry standards.Coordinate and submit documentation of the testing and verification actionstaken by manufacturers representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, duringafter installation, to confirm compliance with manuf

28、acturers standards or instructions.1.2.4.3 Final Acceptance TestPerform a formal test with full documentation using the approved recording form. Contracting Officer will witness this test and issue a written final acceptance. Provide final test data to the Contracting Officer with a cover letter cle

29、arly marked with the system name, date, and the words “ Final Test Data - Forward to the Systems Engineer/Condition Monitoring Office/Predictive Testing Group for inclusion in the Maintenance Database.“1.2.4.4 Test ProceduresSubmit test procedure and recording forms that document the test steps for

30、approval to the Contracting Officer 21 calendar days prior to the proposed test date. Procedure must clearly state step by step instruction to verify system parameters, components, and functions.PART 2 PRODUCTSNot UsedPART 3 EXECUTIONNot Used- End of Section -SECTION 01 75 00 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-