SANS 10120-2 L-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section L Mediu.pdf

上传人:sumcourage256 文档编号:1028493 上传时间:2019-03-24 格式:PDF 页数:7 大小:473.76KB
下载 相关 举报
SANS 10120-2 L-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section L Mediu.pdf_第1页
第1页 / 共7页
SANS 10120-2 L-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section L Mediu.pdf_第2页
第2页 / 共7页
SANS 10120-2 L-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section L Mediu.pdf_第3页
第3页 / 共7页
SANS 10120-2 L-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section L Mediu.pdf_第4页
第4页 / 共7页
SANS 10120-2 L-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section L Mediu.pdf_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 S Part 2 Section L-1983 Medimpressure pipelines PART 2 : PROJECT SPECIFICATION SECTION L CONTENTS Clause L . 2 . 3 . 3.1 3.2 3.2.1 3.2.2 3.2.3

4、3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.2.9 3.2.10 3.2.11 3.2.12 3.2.13 3.3 3.3.1 3.3.2 3.3.3 3.4 3.5 Page Number ESSENTIAL PROJECT SPECIFICATION CLAUSES .a 1 . ESSENTIAL DATA 1 . ADDITIONAL CLAUSES 1 General 1 Normal Projects 1 . AC pipes. COD and CID types 1 Steel pipes. fittings. and specials l Valve cha

5、mbers and manholes for projects in South-West Africa/Nmibia 2 Concrete for ancillary work 2 Pipelaying personnel . 2 Depths and cover . 2 Fire hydrants . 2 Concrete pipes with caulked joints . 3 Flanges (steel pipelines) 3 Setting of valves . 3 Brickwork 3 Disinfection of potable water pipelines 3 R

6、adiographic and ultrasonic examinations . 3 Prestige Projects 3 General . 3 Embedded coupling rings . 3 The testing of large diameter AC pipelines . 4 Subeconomic Projects . 4 Labour-Based Projects . 4 First Revision March 1983 This section of the code supersedes SABS 0120 : Part 2 : Section L-1380

7、Approved by the COUNCIL OF THE SOUTti AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 2 Section L-1983 Hedium-pressure pipelines SABS 1200 L : MEDIUM-PRESSURE PIPELINES NOTE a) Number the PSL clauses in Portion 2 of the project specification in the sequence in which the clauses to which they relate app

8、ear in SABS l200 L. b) The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the numberfs) of the relevant clause(s) of SABS 1200 L. ESSENTIAL PROJECT SPECIFICATION CLAUSES Set out suitable clauses in Portion 2 of the project specification to p

9、rovide the essential information, as follows: a) (Subclause 3.1) State types of pipes and fittings required, if not scheduled. b) (Subclause 3.2) When relevant, state whether AC pipes are to be bitumen dipped. c) (Subclause 3.4.3(a) When relevant, state or schedule the grade of steel pipe required.

10、d) (Subclause 3.6) In the case of prestressed concrete pipes, state the diameter, length, etc. e) (Subclause 3.8.4) In the case of flanged pipes state whether bolts and nuts are to comply with SABS 135 or SABS 136. f) (Subclause 3.9.2.2) When relevant, state which of the protective systems specified

11、 is required for steel pipes of nominal bore over 150 mm. (See also Subclause 1.3.2 of Section L of Part 3 of the code.) g) (Subclause 3.9.3) Where so required, specify that protection against electrolytic corrosion is to be provided. h) (Subclause 3.9.5) If joints, bolts, etc. are not to be bitumen

12、 dipped, state the requirements. (See also Subclause 2.2.5 of section L of Part 3 of the code. ) i) (Subclauses 5.1.4.1 and 5.1.4.2) Specify the cover required over pipes. (See 3.2.6 below). j) (Subclause 7.2.2) If radiographic examination of welds is required, specify in detail the method and exten

13、t of such examination. ESSENTIAL DATA The availability of certain essential data may affect the prices tendered. Except where such data have been given in the schedule or in the tender drawings, set out suitable clauses covering items such as the following in Portion 2 of the project specification:

14、a) (Subclause 3.4.2) State the class and coupling method required if, in the case of steel pipes of nominal bore up to 150 mm, medium class screwed pips are not acceptable. b) (Subclause 3.4.4) Where applicable, state that, for shop welding of steel pipes and specials, a welding test other than the

15、procedure approval test of RP1 1104 may be agreed between the engineer and the contractor. (See also Subclause 3.2.1 of Section t of Part 5 of the code.) c) (Subclause 3.9.3) If protection against electrolytic corrosion is required, state 1) whether it is to be in lieu of, or additional to, any othe

16、r protective coatings and 2) which sections of the pipeline are to be so protected. d) (Subclause 5.1.4.1) Where the maximm depth of trench excavation is to be greater than 1,5 m, state the depth required. (See also Subclause 3.1.5 of Section L of Part S and Subclause 2.3.2 of Section L of Part 3 of

17、 the code.) e) (Subclause 5.1.4.4) State the depth of the threaded outlet of a pipe feeding a fire hydrant, if it is to be other than 400 m below the level of the top of the hydrant cover and, when appropriate, state or show on drawings other arrangements that are to be used to control the depth of

18、fire hydrants relative to fire mains and pavements or ground level. (See also 3.2.7 below.) f) (Subclause 7.3.1) Unless given on the drawings, state the maximum working pressure applicable to the various parts of the pipeline. In addition, if the factor of 1,25 is not to be used, state the factor (g

19、enerally between 1,l and 1,251 that is to be applied to the maximum working pressure to determine the pressure at which the contractor must test the pipeline. g) (Subclause 8.2.5) In the case of short pipe runs, state details of the method of fixing, attaching, supporting, or bedding to be used, if

20、not shown on the drawings. ADDITIONAL CLAUSES GENERAL. Where it is necessary to amplify or otherwise to vary the terms of SABS 1200 L to render them suitable for use in projects to be carried out in particular locations or under particular circumstances, include in the project specification clauses

21、dealing with matters other than those covered by Clauses 1 and 2. NORMAL PROJECTS NOTE: To meet requirements imposed by various norms of economic development, projects are classified as normal, prestige, subeconomic, and labour-based projects (see Clause 4 of Section 0 of Part 3 of the code) . AC Pi

22、pes, COD and CID Types (Subclause 3.2). See Subclauses 1.1.2 and 2.2.2 of Section L of Part 3 of the code. Steel Pipes, Fittings, and Specials (Subclause 3.4). Where the pipe details stated in Subclause 3.4 of SABS 1200 L are unsuitable, set out the applicable requirements as follows (see SABS 719):

23、 a) The grade of pipe required; b) when relevant, that test certificates are required; c) the average length or exact length of pipe required, as relevant; d) the outside diameter; e) whether the ends are to be plain or are to be prepared for field welding and, in the latter case, the type of end pr

24、eparation, if other than as specified; 1 when relevant, that the height of inner weld reinforcement shall not exceed 1 mm; q) when relevant, that the requirement for height of upset metal and flash on the outer surface of electric resistance welds shall also be applicable to the inner surface; h) ad

25、ditional markings, if required. 1) Electric welded low carbon steel pipes for aqueous fluids (ordinary duties). SABS 0120 : Part 2 Section L-1963 Hedim-pressure pipelines Valve Chaabers and Manholes for Projects in South-West Africa/Naaibia (Subclauses 3.11.1 cnd 5.6). Insert a clause such as the fo

26、llwing in the case of projects in South-West Africa/Namibia PSL 1.1 Bricks (Subclause 3.11.1) Notwithstanding the requirements of Subclause 3.11.1 of SABS l200 L, cement bricks coeplyinq with the requirements for Class S7 of SABS 97) will be accepted. Concrete for Ancillary Work (Subclauses 5.4 - 5.

27、7). Insert a project specification clause! requiring the use of a prescribed mix concrete in lieu of the strength concrete where the circunstances !e.g. the situation of the works) are such that the engineer wishes to specify the sources of the material as required in terns of Subclause 5.5.1.6 of S

28、ABS 1200 G). (See also Subclause Z.l(d) of Section G). Pipelaying Personnel (Subclause 5.1.1). Where it is required that only registerled persons undertake pipelaying, include a clause such as the following: PSL 1.2 Pipelaying personnel (Subclause 5.1.1). The laying of pipes and ancillary fittings s

29、hall be perforred only by a qualified person who is registered by the local authority as an artisan in the plumbing, pipefitting, or drainlaying trades or who is qualified by reason of having attended and passed the course on pipelaying of the Civil Engineering Industry Training Board. See also Subc

30、lause 3.1.6 of Section L of Part 5 of the code. Depths and Cover (Subclause 5.1.4 and see also Subclauses 2.1.3 and 2.1.4 of section L of Part 3 of the code). The followinq clauses are generally applicable to urban reticulation systfzms: PSL 1.3 Intersections of water and stormwater pipes in streets

31、. (Subclause 5.1.4) a) Except =allowed in Ib) below, water mains shall be so laid in road verges and in erven that the minimum cover from the finished surface level to the top of the pipe barrel i.s 600 mm. Under carriageways, water mains shall be laid horizontally and so that the minimum cover is 7

32、50 mm, the change to the cover under the carriageway fraa the verge being effect.ed as specified in Subclause 5.1.4.2 of SABS l200 L. b) Where stormwater pipes and water mains cross, the minimum clear distance between the outsides of the pipe barrels (or the outside of the pipe barrel and the outsid

33、e of the wahter amin sleeve :ioint) shall be 150 BB. Drawing indicates the required invert level for the water main. Where the cover specified, read in conjunction with the specified stormwater invert levels, wul3 lead to a clear space between the pipes of lees than 150 m, the water main shall be la

34、id horizontally at tk required invert level for a distance of at least 1,O m on either side of the centre line of the stormtater pipe and reversion to the specified cover shall be carried out as #pacified in Subclause 5.1.4.2 of 8ABS 1200 L. C) The Contractor may increase the cover by a maximm of 20

35、0 r (except as ellawed in (b) .ba?e, m dccreaue in cover will be permitted) or he nay vary the specified invert levnls by a rulrur of 50 r provided that the clear space between the stormater pipe and the water main for sleeve joint, if applicable) is at least 150 R. PSL 1.4 Cover in cultivated land.

36、 In cultivated land the aininum cover shall be 1,O m. PSL 1.5 Measurement and payment for trench depths on basis of cover. Pap!nt for trench excavation for mains will be on the basis of the depth of cover and the invert fevels opecificd, regardless of local variations adopted by the Contractor. Fire

37、 Hydrants (subclause 5.1.4.5). An example of a clause dealing with different methods of laying fire hydrants is given below. PSL 1.6 Hydrant distance pieces (Subclause 5.1.4.5). Where the depth of cover to the water main exceeds 760 m, a distance piece of flange-to-flange length 210 m shall be fitte

38、d between the hydrant and the hydrant-tee flange, and where the depth of cover exceeds 970 rs, two such distance pieces shall be fitted. Ueasurement and payment for hydrant distance pieces will be by number and as specified in Subclause 8.2.3 of SABS l200 L. The rate shall cover the cost of the oper

39、ations specirEied in Subclause 8.2.3 of SABS 1200 L and also the cost of all delays and additional operations arising from circumstances which are beyond the Contractors control because the need for distance pieces can be ascertained only after the laying of the water main. (NOTE: The specified deta

40、ils far the distance pieces are based on the dimensions set out telow and the requirement of Subclause 5.1.4.4 of SABS 1200 L that the top of the threaded outlset shall te not mre than 400 m below the cover level and the requirement that the top of the hydrant spindle shall be at least 50 w below th

41、e cover level: a) Hydrant tees Nominal pipe dim., w Distance from top of pipe to top of flange, mm 108 b) Hydrants Bottom of flanae to too of threaded outlet 263 nun - - Bottom of flange to tap of spindle 400 mm Should the contractor intend providing hydrant tees or hydrants of dimensions other than

42、 those qiven above, he should advise the engineer accordingly and ask for an amended specfication for distance pieces. 2) Cement bricks. 3) Concrete (structural). SABS 0120 : Part 2 Section L-1983 Medium-pressure pipelines Concrete Pipes with Caulked Joints (Subclause 5.2). As concrete pipes with ca

43、ulked joints are not usually used for pressure pipelines, where they are required insert in the project specification a clause such as the following: PSL 1.7 Concrete pipes with caulked joints (Subclause 5.2). In the case of concrete pipes with plain ends and loose collars, between and , the collars

44、 shall be slipped over the joints and held in place by means of wedges to provide a uniform caulking space all round. The pipe ends and the inside of the collar shall be cleaned and wetted before caulking is commenced. Caulking shall be done with a mortar of one part cement and two parts clean river

45、 sand, or an approved jointing compound, inserted to the full depth of the joint. The mortar shall be damp enough to form a cast when squeezed in the hand. When caulking has been completed, the joint shall be cured by being covered with damp sand, or by the use of other suitable and approved methods

46、. The curinq period shall be at least 48 h. Flanges (Steel Pipelines) (Subclause 5.2.2). Rubber insertion material is suitable for pipelines of diameter up to about 800 nun and pressures up to about 1,O HPa. Beyond these ranges, higher quality insertion materials such as clinkerite and/or specially

47、shaped flanges should be used. Consult current publications on steel pipe joints for advice on types of insertion materials that are suitable under various conditions. Setting of Valves (Subclause 5.3). State the position in which each gate valve and each butterfly valve is to be set, if the setting

48、 required is other than as specified in SABS l200 L. Brickwork (Subclause 5.8). Where the bond arrangement specified in Subclause 5.8 of SABS l200 L is not warranted and stretcher bond is acceptable, set out the requirements for the bonding of the inner and outer skins. Specify the size and number o

49、r spacing of wire ties or brickforce, or both, required (see also Subclause 1.3.7 of Section L of Part 3 of the code). Disinfection of Potable Water Pipelines (Subclause 5.10). See Subclause 1.3.8 of Section L of Part 3 of the code. Radiographic and Ultrasonic Examinations. If radiographic and ultrasonic examinations are required, set out a project specification clause such as the following: PSL 2.1 Radiographic and Ultrasonic Examinations (Subclause 7.2.2). Radiogra hic examination shall be carried out in accordance with BS 2600 or in accordance with BS 2910sP, or both, as approp

展开阅读全文
相关资源
猜你喜欢
  • BS EN 3266-2001 Aerospace series - Pipe coupling in titanium alloy - Bulkhead nut《航空航天系列 钛合金管连接件 闷头螺母》.pdf BS EN 3266-2001 Aerospace series - Pipe coupling in titanium alloy - Bulkhead nut《航空航天系列 钛合金管连接件 闷头螺母》.pdf
  • BS EN 3267-2001 Aerospace series - Washers bulkhead in titanium alloy《航空航天系列 钛合金闷头垫圈》.pdf BS EN 3267-2001 Aerospace series - Washers bulkhead in titanium alloy《航空航天系列 钛合金闷头垫圈》.pdf
  • BS EN 3268-2014 Aerospace series Pipe coupling 830 in titanium alloy Pressure plugs《航空航天系列 钛合金830管连接件 压力管塞》.pdf BS EN 3268-2014 Aerospace series Pipe coupling 830 in titanium alloy Pressure plugs《航空航天系列 钛合金830管连接件 压力管塞》.pdf
  • BS EN 3269-2001 Aerospace series - Pipe coupling 8 30 in titanium alloy - Ferrules blind with dynamic beam seal end《航空航天系列 钛合金管连接件830 带动梁密封端头的暗箍》.pdf BS EN 3269-2001 Aerospace series - Pipe coupling 8 30 in titanium alloy - Ferrules blind with dynamic beam seal end《航空航天系列 钛合金管连接件830 带动梁密封端头的暗箍》.pdf
  • BS EN 327-2014 Heat exchangers Forced convection air cooled refrigerant condensers Test procedures for establishing performance《热交换器 强制对流空气冷却制冷剂冷凝器 确定性能的试验方法》.pdf BS EN 327-2014 Heat exchangers Forced convection air cooled refrigerant condensers Test procedures for establishing performance《热交换器 强制对流空气冷却制冷剂冷凝器 确定性能的试验方法》.pdf
  • BS EN 3270-2001 Aerospace series - Pipe coupling 8 30 in titanium alloy - Blanking plug with lockring《航空航天系列 830钛合金管连接件 带锁紧环的截止管塞》.pdf BS EN 3270-2001 Aerospace series - Pipe coupling 8 30 in titanium alloy - Blanking plug with lockring《航空航天系列 830钛合金管连接件 带锁紧环的截止管塞》.pdf
  • BS EN 3272-2001 Aerospace series - Pipe coupling 8 30 - Dynamic beam seal end for ferrule welded - Geometric configuration《航空航天系列 830钛合金管连接件 动态横梁密封端头的焊接箍 几何配置》.pdf BS EN 3272-2001 Aerospace series - Pipe coupling 8 30 - Dynamic beam seal end for ferrule welded - Geometric configuration《航空航天系列 830钛合金管连接件 动态横梁密封端头的焊接箍 几何配置》.pdf
  • BS EN 3273-2001 Aerospace series - Pipe coupling 8 30 - Dynamic beam seal end for elbows tees and crosses - Geometric configuration《航空航天系列 钛合金管连接件830 弯头、十字管和三通管用动梁密封端头 几何配置》.pdf BS EN 3273-2001 Aerospace series - Pipe coupling 8 30 - Dynamic beam seal end for elbows tees and crosses - Geometric configuration《航空航天系列 钛合金管连接件830 弯头、十字管和三通管用动梁密封端头 几何配置》.pdf
  • BS EN 3274-2010 Aerospace series Pipe coupling 830 Thread end Geometric configuration《航空航天系列 830管连接件 螺纹端 几何配置》.pdf BS EN 3274-2010 Aerospace series Pipe coupling 830 Thread end Geometric configuration《航空航天系列 830管连接件 螺纹端 几何配置》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1