SANS 10120-4 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Secti.pdf

上传人:boatfragile160 文档编号:1028555 上传时间:2019-03-24 格式:PDF 页数:6 大小:246.88KB
下载 相关 举报
SANS 10120-4 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Secti.pdf_第1页
第1页 / 共6页
SANS 10120-4 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Secti.pdf_第2页
第2页 / 共6页
SANS 10120-4 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Secti.pdf_第3页
第3页 / 共6页
SANS 10120-4 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Secti.pdf_第4页
第4页 / 共6页
SANS 10120-4 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Secti.pdf_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 4 Section DE-1984 Small earth dams PART 4 : TYPICAL SCIIEDULES OF QUANTITIES SECTION DE CONTENTS Page Number SECTION : SMALL EARTH DAMS

4、1 March 1984 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS SAAS 0120 : Part 4 Section DE-1984 Small earth dams SABS 1200 DE : SMALL EARTH DAMS NOTE: see clause 5 of Section 0. Item NO. refers I Short Description S ARS 1200 DE 8.3.1.1 8.3.1.6 8.3.1.2 8.3.2 8.3.4 8.3.3(a) 8.3.3(b) a

5、nd (c) 8.3.3(c) 8.3.5 3.3.8 3.3.6 3.3.7 I PREIJMINARY AND GENERAL SITE CLFARANCE AND PREPARATION Clear and strip area to be covere- a) Solum of dam, outlet works, and spillway b) Reservoir basin C) Borrow areas Remove trees from areas covered by items .2.1 - -2.3 and dispose Girth of trees: Over 1,O

6、 m 2,O m 3,O m Remove topsoil from extra depths to stockpile (Prov.) Preparation of solum of dam EXCAVATION Material unsuitable for embankment. Excavate from essential excavations, and place in spoil dumn from solum, cut-off, outlet trenches, and spillway areas r intermediate material and move to ap

7、pro- riate zones in embankment from a) cut-off trench C) outlet trench C) spillway channels items .3.2 - -3.4, for hard rod aterial (Prov. quantity) ake delivery of material excavated under items .3.2 to .3.4 or excavate andselect from borrow pits, place, spread, and con- solidate material in approp

8、riate zones in embankment ) Selected impervious material ) Transition Unit ha or m2 ha ha No. NO. No. m 3 m 2 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 3 m311km m Sum aan- ity Rate (See Amount ction AD) SABS 0120 : Part 4 Section DE-1984 Small earth dams I ten No. .S .5.1 .5.2 .5.3 .5.4 .5

9、.5 .G .6.1 .6.2 .6.3 .6.4 .l .2 .2.1 .2.2 -2.3 .3 -3.1 -3.2 .3.3 .3.4 -3.5 .3.6 -3.7 .3.8 .4 .4.1 .4.2 .4.3 .4.4 Payment refers PSDE PSDE SABS 1200 DE 8.3.10 8.3.9 ESDE SABS 1200 DE 8.3.1.1 8.3.3 8.3.3 3.3.3fc) 1.3.4 Short Description Brought forward/ FINISAINGS Trim rock surfaces in spillway channe

10、ls - a) Within 3 m from control wall b) 3 m and more from control wall Stone pitching including supply and placing c stone and gravel backinq a) Grouted, minimum thickness 300 mm . . b) Other types or thicknesses Grassinq Downstream face of embankment OUTLET WORKS Construct outlet pipeline with . mm

11、 diamete class ., . pipe, complete except for encasement Provide and install . mm gate valve Construct outlet valve box complete, to Dwg Concrete of specified strength 15 MPa for pipe-encasement including costs of all reinforcement and formwork shown on Dwg . ALTERNATIVELY - PRELIMINARY AND GENERAL

12、STRIP SITE - a) Foundation area of embankment, spl,llway, and other structures bl Borrow areas C) Stockpile topsoil b) Andation area (solum) C) Cut-off trench d) Outlet trench Extra-over items .3.2, .3.4, and -3.5 for excavation in hard rock material for 3) Spillwav D) m mL m 3 50 kg sacks Quan- tit

13、y Rate Amount jection AD) SABS 0120 : Part 4 Section DE-1984 Small earth dams Item NO. -5 .5.1 .5.2 .5.3 .5.4 .5.5 .5.6 .5.7 .G .6.1 Payment refers Short Description S ABS 1200 DE 8.3.5 B.3.5(b) 3.3.5(e) FORM EMBANKMENT Items .3.2 - l b) Zone I11 C) Zone IV Using material from designated borrow areas, form embankment in a) Zone I (Core) from borrow area No. 1 b) Zone 11 (Transition) from dam basin C) Zone I11 (Shell) from dam basin d) Zone V (Rock toe) from dam basin Unit Rate Amount sabs Pta