SSPC QP 3-2010 Certification Standard for Shop Application of Complex Protective Coating Systems《复杂保护涂料系统的工场应用认证标准》.pdf

上传人:wealthynice100 文档编号:1054501 上传时间:2019-03-29 格式:PDF 页数:16 大小:354.09KB
下载 相关 举报
SSPC QP 3-2010 Certification Standard for Shop Application of Complex Protective Coating Systems《复杂保护涂料系统的工场应用认证标准》.pdf_第1页
第1页 / 共16页
SSPC QP 3-2010 Certification Standard for Shop Application of Complex Protective Coating Systems《复杂保护涂料系统的工场应用认证标准》.pdf_第2页
第2页 / 共16页
SSPC QP 3-2010 Certification Standard for Shop Application of Complex Protective Coating Systems《复杂保护涂料系统的工场应用认证标准》.pdf_第3页
第3页 / 共16页
SSPC QP 3-2010 Certification Standard for Shop Application of Complex Protective Coating Systems《复杂保护涂料系统的工场应用认证标准》.pdf_第4页
第4页 / 共16页
SSPC QP 3-2010 Certification Standard for Shop Application of Complex Protective Coating Systems《复杂保护涂料系统的工场应用认证标准》.pdf_第5页
第5页 / 共16页
点击查看更多>>
资源描述

1、Certification Standard for Shop Application of Complex Protective Coating SystemsAISC-420-10/SSPC-QP 3September 23, 2010Prepared by the American Institute of Steel Construction andSSPC: The Society for Protective CoatingsSupersedes AISC 203-05 and SSPC-QP 3 (2006)SSPC: THE SOCIETY FOR PROTECTIVE COA

2、TINGS40 24thStreet, 6th Floor, Pittsburgh, Pennsylvania 15222AMERICAN INSTITUTE OF STEEL CONSTRUCTIONOne East Wacker Drive, Suite 700, Chicago, Illinois, 60601ii CERTIFICATION STANDARD FOR SHOP APPLICATION OF COMPLEX PROTECTIVE COATING SYSTEMS The information presented in this joint AISC/SSPC standa

3、rd has been prepared by the Certification Committee of the Ameri-can Institute of Steel Construction (AISC) and the SSPC technical committee on shop painting (QP 3). The document is the specific responsibility of the AISC/SSPC Joint Committee on Shop Certification. The standard has been prepared wit

4、hin the scope and for the purposes stated in the body of this document, and for no other purpose.The standard has been developed by a balanced committee of participants in the industry who have particular experience and expertise in the topics addressed in the standard. Participation from a broad cr

5、oss section of the fabrication and coating industry has been sought.AISC and SSPC accept responsibility for only those interpretations of this standard that are issued in writing and in accor-dance with governing AISC or SSPC procedures and policies. Issuances of informal interpretations are not nec

6、essarily the official interpretation of AISC or SSPC or their respective Certification Committees. This standard is subject to revision at any time by AISC and SSPC.AISC and SSPC disclaim for themselves and their program auditors any liability for any injury to persons or to property or other damage

7、s of any nature whatsoever, whether special, indirect, consequential or compensatory, directly or indirectly result-ing from the publication, use of, or reliance upon this standard or application of the activities or devices referenced herein.Caution must be exercised when relying upon other specifi

8、cations or codes developed by other bodies and incorporated by reference herein. Such material may be modified or amended from time to time by such other bodies subsequent to the printing of this standard. AISC and SSPC bear no responsibility for changes in such material other than to refer to a spe

9、cific or the cur-rent edition as being applicable to this standard at the time of its publication.AISC 2010byAmerican Institute of Steel ConstructionSSPC 2010bySSPC: The Society for Protective CoatingsAll rights reserved. This book or any part thereof must not be reproduced in any form without the w

10、ritten permission of the publishers. The AISC logo is a registered trademark of AISC. The SSPC logo is a registered trademark of SSPC.Prepared by theAISC/SSPC JOINT TASK COMMITTEEEric S. Kline, ChairpersonL. Brian CastlerHeather GilmerRay HalesThomas A. JonesZane KenistonMichael J. MaurisRuss Panico

11、Glenn R. TaboltJohn P. WeisnerMichael Damiano, SSPC representativeBrian W. Miller, AISC representativePrepared Under the Direction of theAISC CERTIFICATION COMMITTEEJeffrey Dave, ChairpersonWilliam G. AshtonH. Bruce BrummelTheodore L. DroesslerHeather GilmerCharlie JohnsonKeith LandwehrClay LarsonJo

12、hn T. LinnH. Scott MetzgerTerry PeshiaHomer R. Peterson, IIAlan T. SheppardLouis N. TriandafilouBrian W. Miller, SecretaryAISC CERTIFICATION COMMITTEE ADVISORSRoger E. FerchDavid L. HarwellDaniel J. KaufmanDavid B. Ratterman, Esq.Patricia A. ThomashefskySSPC SHOP QUALIFICATION COMMITTEEEric S. Kline

13、, ChairpersonL. Brian CastlerHeather GilmerCurt HuberRobert W. HummelZane KenistonMichael J. LeoteWilliam M. MedfordThomas W. NealJohn S. PanicoGlenn R. TaboltJeff TheoTerry WarrenJohn P. Weisneriv Table of Contents1. Purpose 12. Scope 13. References 14. Definitions 25. Management Responsibility .35

14、.1 Policy 35.2 Direction and Leadership 35.3 Resources 45.3.1 Personnel 45.3.2 Buildings, Workspace, and Associated Utilities 45.3.3 Process Equipment . 45.3.4 Inspection, Measuring, and Test Equipment . 45.4 Document Requirements 45.4.1 Organizational Chart 45.4.2 Job Descriptions, Qualifications,

15、and Biographical Information 45.4.3 Facility Plan . 55.4.4 Equipment List . 55.4.5 Project List . 56. Contract and Project Specification Review and Communication .57. Coating System Communication .58. Document and Data Control 58.1 Review and Approval . 58.2 Revision Control . 58.3 Access . 58.4 Obs

16、olescence 68.5 Transmittal 68.6 Customer Requirements 69. Control of Quality Records 69.1 Storage 69.2 Retention . 69.3 Minimum Required Quality Records . 610. Purchasing Documents .610.1 Purchasing . 610.2 Purchasing Data 610.3 Evaluation of Subcontractors 610.4 Qualification and Evaluation of Supp

17、liers . 711. Material 711.1 Container . 711.2 Storage 711.3 Certificate of Conformance for Coating - Requirements . 712. Process Control .712.1 Surface Preparation . 712.2 Coating Mixing and Application 712.2.1 Application Records . 712.2.2 Equipment 813. Inspection and Testing 813.1 Assignment of I

18、nspection of Surface Prepartion and Application of Coating . 813.2 Inspection Records 814. Verification of Accuracy of Inspection, Measuring, and Test Equipment 915. Control of Nonconformities .916. Corrective Action 917. Handling, Storage, and Delivery of Product and Materials .1018 Training .1018.

19、1 Qualification and Training of Production Personnel 1018.2 Qualification and Training of Inspection Personnel . 1019. Internal Audit . 11Certification Standard for Shop Application of Complex Protective Coating SystemsAm e r i c A n in s t i t u t e o f st e e l co n s t r u c t i o nssPc: th e so

20、c i e t y f o r Pr o t e c t i v e co A t i n g s1 tor may be to suspend coating operations until ambi-ent conditions are acceptable.Open (Exposed) ShopAn open shop is a permanent or semi-permanent site at the firms location for certification open to all ambient conditions. The area is exposed to ou

21、tdoor weather conditions and airborne contaminants. The site provides no controls of temperature, humidity, or ventilation in the blast or coating areas. Drying and curing of coated items takes place under ambient conditions. Coating storage areas have either fixed or portable heating or cooling equ

22、ipment. A method of control for this shop descriptor may be to suspend coating operations until conditions are acceptable.2. ScopeThis Standard describes requirements for certification of firms that apply complex painting systems as defined in this Standard. The requirements of this Standard are app

23、lied to the quality management system of a certified Firm independent of individual project requirement for Certification to this Standard. The coating quality management system of a Firm, not its products, is certified. Certification to this Stan-dard is neither an inspection nor an endorsement of

24、product, surface preparation, or coating application. The Standard includes all functions and responsibilities that apply to surface preparation and coating in a shop environment for new steel or for steel which has been previously coated and blast-cleaned and is free of hazardous paint (lead, etc.)

25、 when it arrives at the shop. The scope of this Standard does not include design, fabrication, manufacture, erection, surface preparation and application of coating in the field, metallizing or galvanizing, powder coating, anodizing, or compliance with safety (OSHA) and environmental (EPA) regulatio

26、ns. The re-painting (including surface preparation) of previously coated items returned to the Firms coating facility for rework is included in the scope of this Standard; however, removal of previously existing coatings is not included in the scope.1Certification to this Standard cannot be shared o

27、r trans-ferred to another company or facility without the written approval of AISC or SSPC. The Firm shall have the capa-bility to meet all the requirements of this Standard.3. ReferencesThe Firm shall have the reference documents and stan-dards necessary to provide personnel with the requirements o

28、f the work. The following references shall be readily avail-able to those who have coating program responsibilities. Firms shall possess the current edition of these references 1 Removal of previously existing coatings may fall under the scope of SSPC-QP 2.1. PurposeThe purpose of this Standard is t

29、o confirm to owners, the design community, and the construction industry that a Firm certified to this Standard has knowledgeable per-sonnel and the organization, experience, procedures, and equipment to provide surface preparation and application of complex painting systems in a shop facility in ac

30、cordance with contract specifications.Independent of the quality-focused purpose that is uni-formly applicable to all Firms certified to this Standard, Firms will be labeled with one of three shop descriptors to communicate the basic description of their facilities. Own-ers, the design community, an

31、d the construction industry requiring certification to this Standard may chose to use the shop description label as part of qualification criteria for shop painting facilities. The shop descriptors are defined descending inclusive but not ascending inclusive. For example, a Firm described as Enclose

32、d also meets the description for Covered and Open. A Firm described as Covered also meets the description for Open, but does not meet the description for Enclosed. Firms in any shop descriptor shall provide evidence of proper operating procedures and maintenance records of equipment, and evi-dence o

33、f proper coating storage and handling. All contract requirements shall be met, regardless of shop description. Specifiers who require certification to this Standard should evaluate the Firms capacity to complete a specific project independently.Enclosed Shop An enclosed shop is a facility, enclosure

34、 or build-ing (four continuous walls or partitions to grade or floor with a roof) at the firms location for certifica-tion where surface preparation, coating, curing, and coating storage are conducted in a controlled envi-ronment with fixed or portable ventilation systems. Ambient conditions such as

35、 temperature, humidity, dew point and airborne contaminants are controlled and maintained to meet contract requirements. The work environment is protected from adverse outdoor weather conditions and outdoor airborne contami-nants, so that the surface preparation, coating, and curing activities are n

36、ot jeopardized.Covered ShopA covered shop is located at a site at the firms loca-tion for certification with a roof but is not required to have walls, heating, or humidity control. Sur-face preparation, coating, and curing activities are performed under ambient conditions with fixed or portable vent

37、ilation systems. The structure provides limited protection from exposure to outdoor weather and airborne contaminants. Coating storage areas have either fixed or portable heating or cooling equipment. A method of control for this shop descrip-2 Certification Standard for Shop Application of Complex

38、Protective Coating SystemsAm e r i c A n in s t i t u t e o f st e e l co n s t r u c t i o nssPc: th e so c i e t y f o r Pr o t e c t i v e co A t i n g sand references consistent with the requirements of existing contracts.SSPC-PA 1, “ Shop, Field and Maintenance Painting of Steel”SSPC-PA 2, “Mea

39、surement of Dry Coating Thick- ness with Magnetic Gages”SSPC-VIS 1, “Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning”Manufacturers product data sheets, technical bul- letins, and other recommendations for materials in use.ASTM D 3276, “Standard Guide for Pa

40、inting Inspec- tors (Metal Substrates)”4. DefinitionsAs used in this Standard, the word shall or will denotes a mandatory requirement. The word should denotes a guideline or recommendation. The word may denotes an obligation to make a choice.AISC. The American Institute of Steel Construction one of

41、the two certifying bodiesASTM. American Society for Testing and MaterialsComplex Coating System. Complex coating systems are defined, for the purpose of this standard, as those that require special care in surface preparation, coating component preparation, application control, curing, and in-proces

42、s inspection. These systems include materi-als such as zinc-rich, epoxy, and urethane coatings. These are typically multiple-coat systems, although only one or two coats of a multi-coat system may be shop-applied. Contract Documents. The documents that define the responsibilities of the parties that

43、 are involved in surface preparation and coating. These documents typi-cally include the design drawings, the specifications, special provisions, and the contract.Corrective Action (CA). The action or actions under-taken to identify and eliminate the root cause of a product or process nonconformance

44、 to prevent its recur-rence. Corrective action is not the repair or rework of identified nonconforming product or process to meet specified requirements.Customer. Entity (e.g., the general contractor, owner, or specifier) contracting with the Firm for surface preparation and coating application.Desi

45、gn Drawings. The graphic and pictorial portions of the contract documents showing the design and dimen-sions of the work. These documents generally include general notes, pay item quantities, fabricated item and coating details, and notes associated with specific items or required methods.Documented

46、 Procedure. A procedure that is docu-mented in writing or other graphical format. It can include written procedures or instructions, drawings, diagrams, charts, specifications and excerpts of, or references to, appropriate technical standards or codes. Documentation shall:Provide the purpose of the

47、procedure Describe the sequence of steps taken to carry out a particular course of action.Assign responsibilities for completion Identify management responsibility for review of the procedureIdentify quality records that are generated. Where the term “documented procedure” appears within this Standa

48、rd, it indicates that the procedure is established, documented, implemented and maintained.Element. A primary section of this standard as shown in the Table of Contents.Executive Management. Executive management is defined as the top company officers responsible for the management and operation of t

49、he Certified Firm. Executive management may be defined by the Firm to include this top officer and a management team with these responsibilities.Fabrication or Manufacture. The process of prepara-tion and assembly of individual parts into a shipping piece.Firm. The entity that is responsible for surface prepara-tion and coating application in the shop environment. The Firm referenced in this document is the entity being certified.Nonconformities. Attributes of materials, consumables, surface preparation and coating application (i

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1