TIA-102 CABC-2006 Interoperability Testing for Voice Operation in Trunked Systems《干线系统中声音操作的互操作测试》.pdf

上传人:wealthynice100 文档编号:1059969 上传时间:2019-03-31 格式:PDF 页数:65 大小:254.62KB
下载 相关 举报
TIA-102 CABC-2006 Interoperability Testing for Voice Operation in Trunked Systems《干线系统中声音操作的互操作测试》.pdf_第1页
第1页 / 共65页
TIA-102 CABC-2006 Interoperability Testing for Voice Operation in Trunked Systems《干线系统中声音操作的互操作测试》.pdf_第2页
第2页 / 共65页
TIA-102 CABC-2006 Interoperability Testing for Voice Operation in Trunked Systems《干线系统中声音操作的互操作测试》.pdf_第3页
第3页 / 共65页
TIA-102 CABC-2006 Interoperability Testing for Voice Operation in Trunked Systems《干线系统中声音操作的互操作测试》.pdf_第4页
第4页 / 共65页
TIA-102 CABC-2006 Interoperability Testing for Voice Operation in Trunked Systems《干线系统中声音操作的互操作测试》.pdf_第5页
第5页 / 共65页
点击查看更多>>
资源描述

1、 TIA STANDARD Interoperability Testing for Voice Operation in Trunked Systems TIA-102.CABC September 2006 TELECOMMUNICATIONS INDUSTRY ASSOCIATION Representing the telecommunications industry in association with the Electronic Industries Alliance Copyright Telecommunications Industry Association Prov

2、ided by IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings between manufacturers and purchasers, facilitating in

3、terchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclude any member or non-member of TIA from manufacturing

4、or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publications are adopted by TIA in accordance with the American

5、 National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport to address all safety problems associated with its use

6、 or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From Project No. 3-0150-A, formulated under the cognizance of the TIA,

7、TR-8 Committee onMobile and Personal Private Radio Standards). Published by TELECOMMUNICATIONS INDUSTRY ASSOCIATION Standards and Technology Department 2500 Wilson Boulevard Arlington, VA 22201 U.S.A. PRICE: Please refer to current Catalog of TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION STANDARDS AND

8、 ENGINEERING PUBLICATIONS or call Global Engineering Documents, USA and Canada (1-800-854-7179) International (303-397-7956) or search online at http:/www.tiaonline.org/standards/catalog/ All rights reserved Printed in U.S.A. Copyright Telecommunications Industry Association Provided by IHS under li

9、cense with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOTICE OF COPYRIGHT This document is copyrighted by the TIA. Reproduction of these documents either in hard copy or soft copy (including posting on the web) is prohibited without copyright permission. Fo

10、r copyright permission to reproduce portions of this document, please contact TIA Standards Department or go to the TIA website (www.tiaonline.org) for details on how to request permission. Details are located at: http:/www.tiaonline.org/standards/catalog/info.cfm#copyright OR Telecommunications Ind

11、ustry Association Standards (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed in the standards development or any editing process. The use or practice of conten

12、ts of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR consisting of patents and published pending patent applications are claimed and ca

13、lled to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the scope or validity of any claims of IPR. TIA will neither be a party to discussions of

14、 any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant or represent that procedures or practices suggested or provided in the Manual have

15、 been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, development or publication of standards (whether designated as a standard, specification,

16、recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims any duty or obligation to search or investigate the records of any other SSO for IPR or letters of assurance relati

17、ng to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent applications shall apply; and (iii) Information as to claims of IPR in the records or publications of the other SSO

18、 shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document. TIA does not certify, inspect, test or otherwise investigate products, designs or services or any clai

19、ms of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AND ITS NONINFRING

20、EMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS

21、OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. Copyright Telecommunications Industry Association Provided by IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TIA SH

22、ALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, O

23、R THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WO

24、ULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. Copyright Telecommunications Industry Association Provided by IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TIA-102 CABC i Foreword This forward is not part of this standard. This TIA

25、 Standard was prepared by the Interoperability Processes and Procedures Task Group under the APCO Project 25 Interface Committee (APIC). It has been formulated through the TIA TR-8 engineering committee on Mobile and Portable Private Radio Standards. This Standard represents the consensus of the dra

26、fting task group and the formulating committee at the time of publication. This document is part of the suite of documents comprising Project 25 standards.Copyright Telecommunications Industry Association Provided by IHS under license with EIANot for ResaleNo reproduction or networking permitted wit

27、hout license from IHS-,-,-TIA-102 CABC iiiINTEROPERABILITY TESTING FOR VOICE OPERATION IN TRUNKED SYSTEMS Table of Contents 1.0 Introduction. 1 1.1 Disclaimer . 1 1.2 Abbreviations 1 1.3 References 2 1.3.1 Normative references. 2 1.3.2 Informative references . 2 2.0 Scope and Limits of Testing . 2 2

28、.1 Philosophy of Testing 4 2.2 Test Configurations. 8 3.0 Interoperability Test Procedures. 12 3.1 Regular Group Call Tests . 13 3.1.1 Basic Group Call Test One RF Site (Test 1.1) 13 3.1.2 Talk Group Privacy Test One RF Site (Test 1.2) 14 3.1.3 Group Call Late Entry Subscriber Test Subscriber Initia

29、lly Set for a Different Talk Group One RF Site (Test 1.3). 15 3.1.4 Group Call Late Entry Subscriber Test Subscriber Initially Involved in a Unit to Unit Call One RF Site (Test 1.4) 16 3.1.5 Basic Group Call Test Two RF Sites (Test 1.5) 18 3.1.6 Talk Group Privacy Test Two RF Sites (Test 1.6). 18 3.

30、1.7 Group Call Late Entry Subscriber Test Subscriber Initially Set for a Different Talk Group Two RF Sites (Test 1.7) . 18 3.1.8 Group Call Late Entry Subscriber Test Subscriber Initially Involved in a Unit to Unit Call Two RF Sites (Test 1.8) 18 3.2 Queued or Denied Group Call Tests. 18 3.2.1 Busy

31、Queuing and Call Back Test for Group Call One RF Site (Test 2.1)19 3.2.2 Busy Queuing and Call Back Test for Group Call Two RF Sites (Test 2.2) 20 3.2.3 Call Originator Subscriber Unit Not Valid Test One RF Site (Test 2.3) . 20 3.2.4 Target Talk Group Not Valid Test One RF Site (Test 2.4) 21 3.2.5 C

32、all Originator Subscriber Unit Not Valid Test Two RF Sites (Test 2.5)21 3.2.6 Target Talk Group Not Valid Test Two RF Sites (Test 2.6). 22 3.3 Announcement Group Call Tests 22 3.3.1 Basic Announcement Group Call Test One RF Site (Test 3.1). 22 3.3.2 Basic Announcement Group Call Test Two RF Sites (T

33、est 3.2) . 23 3.4 Protected Traffic Channel Tests 24 3.4.1 Group Call Protected Traffic Channel Test One RF Site (Test 6.1) 25 3.4.2 Group Call Protected Traffic Channel Test Two RF Sites (Test 6.2) 26 INFORMATIVE ANNEX A: NUMBER OF COMBINATIONS OF EQUIPMENT REQUIRED FOR TESTING USING THE STS AND RT

34、S APPROACHES . 27 Copyright Telecommunications Industry Association Provided by IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TIA-102 CABC ivNORMATIVE ANNEX B: GENERAL FNE AND SUBSCRIBER UNIT SETUP FOR TRUNKED VOICE OPERATION. 29 INFORMA

35、TIVE ANNEX C: Intra-RF Subsystem Roaming Tests 31 C.1 Intra-RF Subsystem Roaming Control Channel Test Two RF Sites (Test C.1)31 C.2 Intra-RF Subsystem Roaming Traffic Channel Test Two RF Sites (Test C.2)33 INFORMATIVE ANNEX D: Protected Control Channel Tests. 35 D.1 Group Call Protected Control Chan

36、nel Test One RF Site (Test D.1) . 35 D.2 Group Call Protected Control Channel Late Entry Subscriber Test Subscriber Initially Set for a Different Talk Group One RF Site (Test D.2) . 36 D.3 Group Call Protected Control Channel Late Entry Subscriber Test Subscriber Initially Involved in a Unit to Unit

37、 Call One RF Site (Test D.3) 36 D.4 Group Call Protected Control Channel Test Two RF Sites (Test D.4) . 37 D.5 Group Call Protected Control Channel Late Entry Subscriber Test Subscriber Initially Set for a Different Talk Group Two RF Sites (Test D.5) 37 D.6 Group Call Protected Control Channel Late

38、Entry Subscriber Test Subscriber Initially Involved in a Unit to Unit Call Two RF Sites (Test D.6) 37 D.7 Unit to Unit Call Protected Control Channel Test One RF Site (Test D.7) . 37 D.8 Unit to Unit Call Protected Control Channel Test Two RF Sites (Test D.8) 38 INFORMATIVE ANNEX E: Protected Contro

39、l Channel and Traffic Channel Tests . 40 These tests are only performed if equipment being tested (FNE and subscriber units) is capable of protected control and traffic channel operation 40 E.1 Group Call Protected Control Channel and Traffic Channel Test One RF Site (Test E.1). 40 E.2 Group Call Pr

40、otected Control Channel and Traffic Channel Test Two RF Sites (Test E.2) 41 INFORMATIVE ANNEX F: Regular Unit to Unit Call Tests . 42 F.1 Basic Unit to Unit Call Test One RF Site (Test F.1) . 42 F.2 Unit to Unit Call Privacy Test One RF Site (Test F.2) 43 F.3 Call Originator Subscriber Unit Terminat

41、ion of Unit to Unit Call Test One RF Site (Test F.3) 43 F.4 Target Subscriber Unit Termination of Unit to Unit Call Test One RF Site (Test F.4) . 44 F.5 FNE Termination of Unit to Unit Call Test One RF Site (Test F.5) . 45 F.6 Basic Unit to Unit Call Test Two RF Sites (Test F.6) . 45 F.7 Unit to Uni

42、t Call Privacy Test Two RF Sites (Test F.7) 46 F.8 Call Originator Subscriber Unit Termination of Unit to Unit Call Test Two RF Sites (Test F.8) 46 F.9 Target Subscriber Unit Termination of Unit to Unit Call Test Two RF Sites (Test F.9) . 46 F.10 FNE Termination of Unit to Unit Call Test Two RF Site

43、s (Test F.10) 46 INFORMATIVE ANNEX G: Queued or Denied Unit to Unit Call Tests 47 G1 Busy Queuing and Call Back Test for Unit to Unit Call One RF Site (Test G.1) 47 Copyright Telecommunications Industry Association Provided by IHS under license with EIANot for ResaleNo reproduction or networking per

44、mitted without license from IHS-,-,-TIA-102 CABC vG.2 Busy Queuing and Call Back Test for Unit to Unit Call Two RF Sites Scenario 1 (Test G.2) 48 G.3 Busy Queuing and Call Back Test for Unit to Unit Call Two RF Sites Scenario 2 (Test G.3) 49 G.4 Target Subscriber Unit Not Valid Test One RF Site (Tes

45、t G.4) 49 G.5 Target Subscriber Unit Off Test One RF Site (Test G.5) 50 G.6 Target Subscriber Unit Not Valid Test Two RF Sites (Test G.6) 51 G.7 Target Subscriber Unit Off Test Two RF Sites (Test G.7) 51 G.8 Target Subscriber Unit Involved in Another Call One RF Site (Test G.8). 51 G.9 Target Subscr

46、iber Unit Involved in another Call Two RF Sites (Test G.9) . 53 Copyright Telecommunications Industry Association Provided by IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TIA-102 CABC viList of Figures Figure 1. Trunking configuration w

47、ith two subscriber units within the same RF site. 10 Figure 2. Trunking configuration with two subscriber units within two separate RF sites. 11 Figure 3. Trunking configuration with four subscriber units within the same RF site. 16 Figure 4. Trunking configuration with four subscriber units within

48、two separate RF sites. 24 Figure A- 1. Basic trunking configuration for interoperability testing. 27 Figure C- 1. Trunking configuration for intra-RF subsystem roaming tests. 33 List of Tables Table 1. System to System (STS) Approach for Trunked Voice Operation. 6 Table 2. Reference to System (RTS) Approach for Trunked Voice Operation 6 Table 3. Combinations of Subscriber Units and FNE for the Basic Test Configuration Example STS Approach 9 Table 4. Combinations of Subscriber Units and FNE for the Basic Test Configuration Example

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1