UL 1450 CRD-2018 UL Standard for Safety Motor-Operated Air Compressors Vacuum Pumps and Painting Equipment - Section Paragraph Reference 46 46 1 8 Subject Clarifying normal load r.pdf

上传人:sumcourage256 文档编号:1067493 上传时间:2019-04-02 格式:PDF 页数:2 大小:27.38KB
下载 相关 举报
UL 1450 CRD-2018 UL Standard for Safety Motor-Operated Air Compressors Vacuum Pumps and Painting Equipment - Section  Paragraph Reference 46 46 1 8 Subject Clarifying normal load r.pdf_第1页
第1页 / 共2页
UL 1450 CRD-2018 UL Standard for Safety Motor-Operated Air Compressors Vacuum Pumps and Painting Equipment - Section  Paragraph Reference 46 46 1 8 Subject Clarifying normal load r.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULUNDERWRITERS LABORATORIES INC. CERTIFICATION REQUIREMENT DECISIONThis Certification Requirement Decision is prepared by UL LLC. It is normative for the applicable ULProduct Certification Program(

2、s); however, it is currently not part of the UL Standard(s) referencedbelow.Product Category (CCN): QDGSStandard Number: UL 1450Standard Title: Standard for Motor-Operated Air Compressors, Vacuum Pumps, andPainting EquipmentEdition Date: May 5, 2010Edition Number: 4Section / Paragraph Reference: 46,

3、 46.1.8Subject: Clarifying normal load run time for commercial inflatorsDECISION:46 Temperature Test46.1.8 An inflator default duty cycle rate is 15 min on, 5 min off.Exception: Commercial inflators employing a timer circuit that positively and reliably limits the length oftime the product can be op

4、erate shall be operated for the maximum preset duration of operation, followedby a period of 5 min “off”. Following the “off” period, normal load is applied again. This mode of cyclingshall be repeated five times. Temperatures shall be measured at the end of the 5th cycle of operation.RATIONALE FOR

5、DECISION:Commercial inflators that employ timer circuits may not able to operate for 15 min without bypassing thetimer circuits provided with the inflator. Therefore, this Certification Requirement Decision provides anexception to Clause 46.1.8, allowing commercial inflators provided with a reliable

6、 timer to be evaluated forthe intended duration prescribed by the manufacturer.Furthermore, since these products are oftentimes “pay for service” type of products, it is not anticipatedthat they will be operated continuously on a normal basis. Therefore, it is considered that the maximumnormal load

7、would be a period of 5 cycles with an interlude of 5 min between each operation.Copyright 2018 UL LLCUL LLC, in performing its functions in accordance with its objectives, does not guarantee or warrant thecorrectness of Certification Requirement Decisions it may issue or that they will be recognized

8、 or adoptedby anyone. Certification Requirement Decisions are the opinion of UL LLC. in practically applying therequirements of the standard. They do not represent formal interpretations of the standard underAmerican National Standards Institute (ANSI) processes. UL LLC shall not be responsible to a

9、nyone forthe use of or reliance upon Certification Requirement Decisions by anyone. UL LLC shall not incur anyobligation or liability for damages, including consequential damages, arising out of or in connection withthe use or reliance upon Certification Requirement Decisions. The electronic version

10、 of the CertificationRequirement Decision is the current version and previously printed copies may be outdated.This document is published as a service to ULs certification customersUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULSTANDARD NUMBER: UL 1450 -2-No Text on This Page

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1