VA 05 36 00-2011 COMPOSITE METAL DECKING.pdf

上传人:livefirmly316 文档编号:1074693 上传时间:2019-04-06 格式:PDF 页数:7 大小:27.57KB
下载 相关 举报
VA 05 36 00-2011 COMPOSITE METAL DECKING.pdf_第1页
第1页 / 共7页
VA 05 36 00-2011 COMPOSITE METAL DECKING.pdf_第2页
第2页 / 共7页
VA 05 36 00-2011 COMPOSITE METAL DECKING.pdf_第3页
第3页 / 共7页
VA 05 36 00-2011 COMPOSITE METAL DECKING.pdf_第4页
第4页 / 共7页
VA 05 36 00-2011 COMPOSITE METAL DECKING.pdf_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、07-11 05 36 00 - 1 SECTION 05 36 00 COMPOSITE METAL DECKING SPEC WRITER NOTE: Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 GENERAL 1.1 DESCRIPTION: This section specifies material and serv

2、ices required for installation of composite steel decking including / shear connector studs and / miscellaneous closures required to prepare deck for concrete placement as shown and specified. 1.2 RELATED WORK: Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATOR

3、Y SERVICES. 1.3 DESIGN REQUIREMENTS: A. Design steel decking in accordance with American Iron And Steel Institute publication “Specifications for the Design of Cold Formed Steel Structural Members“, except as otherwise shown or specified. B. Design all elements with the latest published version of a

4、pplicable codes. 1.4 SUBMITTALS: A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Shop Drawings: Shop and erection drawings showing decking unit layout, connections to supporting members, and information necessary to complete the installation as shown and s

5、pecified, including supplementary framing, cant strips, cut openings, special jointing or other accessories. Show welding, side lap, closure, deck reinforcing and closure reinforcing details. Show openings required for work of other trades, including openings not shown on structural drawings. Indica

6、te where temporary shoring is required to satisfy design criteria. C. Manufacturers Literature and Data: Showing steel decking section properties and specifying structural characteristics as specified herein. D. Manufacturers written recommendations for: 1. Shape of decking section to be used. 2. Cl

7、eaning of steel decking prior to concrete placement. E. Test Report - Establishing structural characteristics of composite concrete and steel decking system. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 05 36 00 - 2 F. Test Report - Stud bas

8、e qualification. G. Welding power setting recommendation by shear stud manufacturer. H. Shear Stud Layouts: Submit drawings showing the number, pattern, spacing and configuration of the shear studs for each beam and girder. I. Certification: For each type and gauge of metal deck supporting concrete

9、slab or fill, furnish certification of the specified fire ratings. Certify that the units supplied are U.L. listed as a “Steel Floor and Form Unit”. 1.5 QUALITY ASSURANCE: SPEC WRITER NOTE: Delete below when UL listed floor deck units not required. Review required ratings with Architect. Confirm loc

10、ations for ratings and where deck will need spray applied fireproofing. Underwriters Label: Provide metal floor deck units listed in Underwriters Laboratories “Fire Resistance Directory”, with each deck unit bearing the UL label and marking for specific system detailed. 1.6 APPLICABLE PUBLICATIONS:

11、A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only. Refer to the latest edition of all referenced Standards and codes. B. American Iron and Steel Institute (AISI): Specification and Commentary for the Des

12、ign of Cold-Formed Steel Structural Members (Latest Edition). C. American Society of Testing and Materials (ASTM): A36/A36M-08 Standard Specification for Carbon Structural Steel A108-07 Standard Specification for Steel Bars, Carbon, Cold Finished, Standard Quality A653/A653M-10 Standard Specificatio

13、n for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvanized) by the Hot-Dip Process D. American Institute of Steel Construction (AISC): 1. Specification for Structural Steel Buildings Allowable Stress Design and Plastic Design (Latest Edition) 2. Load and Resistance Factor Desi

14、gn Specification for Structural Steel Buildings (Latest Edition) E. American Welding Society (AWS): D1.1/D1.1M-10 Structural Welding Code - Steel D1.3/D1.3M-08 Structural Welding Code - Sheet Steel E. Military Specifications (Mil. Spec.): Provided by IHSNot for ResaleNo reproduction or networking pe

15、rmitted without license from IHS-,-,-07-11 05 36 00 - 3 MIL-P-21035B . Paint, High Zinc Dust Content, Galvanizing Repair PART 2 - PRODUCTS SPEC WRITER NOTE: For galvanizing treatment use coating class G60 for normal conditions, and G90 for extreme exposure (salt air, etc.) 2.1 MATERIALS: A. Steel De

16、cking and all Flashings: ASTM A653, Structural Quality / suitable for shear stud weld-through techniques /. B. Galvanizing: ASTM A653, / G90 / G60 /. C. Shear connector studs: ASTM A108, Grades 1015-1020, yield 350 Mpa (50,000 psi) minimum, tensile strength - 400 Mpa (60,000 psi) minimum, reduction

17、of area 50 percent minimum. Studs of uniform diameter; heads shall be concentric and normal to shaft; stud, after welding free from any substance or defect which would interfere with its function as a shear connector. Studs shall not be painted or galvanized. Size of studs shall be as shown on drawi

18、ngs. Studs manufactured by a company normally engaged in the manufacturer of shear studs and can furnish equipment suitable for weld-through installation of shear studs. D. Galvanizing Repair Paint: Mil. Spec. MIL-P-21035B. E. Miscellaneous Steel Shapes: ASTM A36. F. Welding Electrode: E60XX minimum

19、 G. Sheet Metal Accessories: ASTM A653, galvanized, unless noted otherwise. Provide accessories of every kind required to complete the installation of metal decking in the system shown. Finish sheet metal items to match deck including, but not limited to, the following items: 1. Metal Cover Plates:

20、 For end-abutting deck units, to close gaps at changes in deck direction, columns, walls and openings. Same quality as deck units but not less than 1.3 mm (18 gauge) sheet steel. 2. Continuous sheet metal edging: at openings and concrete slab edges. Same quality as deck units but not less than 1.3 m

21、m (18 gauge) steel. Side and end closures supporting concrete and their attachment to supporting steel shall be designed by the manufacturer to safely support the wet weight of concrete and construction loads. The deflection of cantilever closures shall be limited to 3 mm (1/8 inch) maximum. 3. Meta

22、l Closure Strips: For openings between decking and other construction, of not less than 1.3 mm (18 gauge) sheet steel of the same quality as the deck units. Form to the configuration required to Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 0

23、5 36 00 - 4 provide tight-fitting closures at open ends of flutes and sides of decking. 4. Seat angles for deck: Where a beam does not frame into a column. 2.2 REQUIREMENTS: A. Steel decking depth, gage, and section properties to be as shown. Provide edges of deck with vertical interlocking male and

24、 female lip providing for a positive mechanical connection. B. Fabricate deck units with integral embossments to provide mechanical bond with concrete slab. In combination with concrete slab, capable of supporting total design loads on spans shown. C. Steel decking capable of safely supporting total

25、 normal construction service loads without damage to decking unit. SPEC WRITER NOTE: For high seismic area, consider using wedge anchors or slot anchors in lieu of light duty hanger. D. Steel decking units shall include an integral system which provides a simple point of attachment for light duty h

26、anger devices for flexibility for attaching hangers for support of acoustical, lathing, plumbing, heating, air conditioning and electrical items. System shall provide for minimum spacing pattern of 300 mm (12 inches) on centers longitudinally and 600 mm or 900 mm (24 or 36 inches) on centers transve

27、rsely. Suspension system shall be capable of safely supporting a maximum allowable load of 45 kg (100 pounds) concentrated at any one hanger attachment point. System may consist of fold-down type hanger tabs or a lip hanger. PART 3 - EXECUTION 3.1 ERECTION: A. Do not start installation of metal deck

28、ing until corresponding steel framework has been plumbed, aligned and completed and until temporary shoring, where required, has been installed. Remove any oil, dirt, paint, ice, water and rust from steel surfaces to which metal decking will be welded. B. Coordinate and cooperate with structural ste

29、el erector in locating decking bundles to prevent overloading of structural members. C. Do not use floor deck units for storage or working platforms until permanently secured. Do not overload deck units once placed. Replace any deck units that become damaged after erection and prior to casting concr

30、ete at no cost to the Government. D. Erect steel deck in accordance with manufacturers printed instructions. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 05 36 00 - 5 E. Ship steel deck units to project in standard widths and cut to proper l

31、ength. F. Provide steel decking in sufficient lengths to extend over 3 or more spans, except where structural steel layout does not permit. G. Place steel decking units on supporting steel framework and adjust to final position before being permanently fastening. Bring each unit to proper bearing on

32、 supporting beams. Place deck units in straight alignment for entire length of run of flutes and with close registration of flutes of one unit with those of abutting unit. Maximum space between ends of abutting units is 13 mm (1/2 inch). If space exceeds 13 mm (1/2 inch), install closure plates at n

33、o additional cost to Government. H. Ceiling hanger loops, if used, must be flattened or removed to obtain bearing of units on structural steel. SPEC WRITER NOTE: All UL fire tests for rated floors are run with welded side laps (not screws). Welded side laps may be mandatory in seismic areas. I. Fast

34、ening Deck Units: 1. Fasten floor deck units to steel supporting members by not less than 16 mm (5/8 inch) diameter puddle welds or elongated welds of equal strength, spaced not more than 305 mm (12 inches) o.c. with a minimum of two welds per unit at each support. Where two units abut, fasten each

35、unit individually to the supporting steel framework. 2. Tack weld or use self-tapping No. 8 or larger machine screws at 915 mm (3 feet) o.c. for fastening end closures. Only use welds to attach longitudinal end closures. 3. Weld side laps of adjacent floor deck units that span more than 1524 mm (5 f

36、eet). Fasten at midspan or 915 mm (3 feet) o.c., whichever is smaller. J. Welding to conform to AWS D1.3 and done by competent experienced welding mechanics. K. Areas scarred during erection and welds shall be thoroughly cleaned and touched-up with zinc rich galvanizing repair paint. Paint touch-up

37、is not required for welds or scars that are to be in direct contact with concrete. L. Provide metal concrete stops at edges of deck as required. M. Cutting and Fitting: 1. Cut all metal deck units to proper length in the shop prior to shipping. Provided by IHSNot for ResaleNo reproduction or network

38、ing permitted without license from IHS-,-,-07-11 05 36 00 - 6 2. Field cutting by the metal deck erector is restricted to bevel cuts, notching to fit around columns and similar items, and cutting openings that are located and dimensioned on the structural drawings. 3. Other penetrations shown on the

39、 approved metal deck shop drawings but not shown on the structural drawings are to be located, cut and reinforced by the trade requiring the opening. 4. Make all cuts neat and trim using a metal saw, drill or punchout device; cutting with torches is expressly prohibited. 5. Do not make any cuts in t

40、he metal deck that are not shown on the approved metal deck drawings. If an additional opening not shown on the approved shop drawings is required, submit a sketch, to scale, locating the required new opening and any other openings and supports in the immediate area. Do not cut the opening until the

41、 sketch has been reviewed and accepted by the Resident Engineer. Provide any additional reinforcing or framing required for the opening at no cost to the Government. Failure to comply with these requirements is cause for rejection of the work and removal and replacement of the affected metal deck. 6

42、 Reinforcement at Openings: Provide additional metal reinforcement and closure pieces as required for strength, continuity of decking and support of other work shown. N. Installation of shear connector studs through previously installed metal deck to conform to AWS D1.1, Section 7, except all studs

43、 will be installed with automatically timed welding equipment and as specified below: 1. Do not place reinforcing steel temperature mesh or other materials and equipment which will interfere with stud installation on steel deck until shear connector studs are installed. 2. Steel deck sheets shall be

44、 free of oil, rust, dirt, and paint. Release water in decks valley so that it does not become entrapped between deck and beam. Surface to which stud is to be welded shall be clean and dry. 3. Rest metal deck tightly upon top flange of structural member with bottom of deck rib in full contact with to

45、p of beam flange. 4. Weld studs only through a single thickness of deck. Place decking so that a butt joint is obtained. Place studs directly over beam web, where one row of studs are required. 5. Ferrules specially developed for the weld-through technique must be used. Ferrules shall be appropriate

46、 for size of studs used and be removed after welding. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 05 36 00 - 7 6. Submit report of successful test program for stud base qualification as required by AWS D1.1, Appendix K. 3.2 CLEANING: Clean deck in accordance with manufacturers recommendation before concrete placement. - - - E N D - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • NASA-TM-X-3324-1975 An investigation of several NACA 1-series inlets at Mach numbers from 0 4 to 1 29 for mass flow ratios near 1 0《当马赫数为0 4至0 19且质量流量比接近1 0时 若干NACA第1系列的进气道研究》.pdf NASA-TM-X-3324-1975 An investigation of several NACA 1-series inlets at Mach numbers from 0 4 to 1 29 for mass flow ratios near 1 0《当马赫数为0 4至0 19且质量流量比接近1 0时 若干NACA第1系列的进气道研究》.pdf
  • NASA-TM-X-3437-1977 Side forces on a tangent ogive forebody with a fineness ratio of 3 5 at high angles of attack and Mach numbers from 0 1 to 0 7《在高攻角且马赫数为0 1至0 7时 纯度比率为3 5的切线尖拱形前.pdf NASA-TM-X-3437-1977 Side forces on a tangent ogive forebody with a fineness ratio of 3 5 at high angles of attack and Mach numbers from 0 1 to 0 7《在高攻角且马赫数为0 1至0 7时 纯度比率为3 5的切线尖拱形前.pdf
  • NASA-TM-X-3438-1977 Side forces on forebodies at high angles of attack and Mach numbers from 0 1 to 0 7 two tangent ogives paraboloid and cone《在高攻角且马赫数为0 1至0 7时飞机前体的侧向力 两个切线尖拱形抛面线和.pdf NASA-TM-X-3438-1977 Side forces on forebodies at high angles of attack and Mach numbers from 0 1 to 0 7 two tangent ogives paraboloid and cone《在高攻角且马赫数为0 1至0 7时飞机前体的侧向力 两个切线尖拱形抛面线和.pdf
  • NASA-TM-X-35-1960 Effects of vertical-tail size and a ventral fin on the static lateral and directional stability derivatives of a 0 048-scale model of a horizontal-attitude VTOL a.pdf NASA-TM-X-35-1960 Effects of vertical-tail size and a ventral fin on the static lateral and directional stability derivatives of a 0 048-scale model of a horizontal-attitude VTOL a.pdf
  • NASA-TM-X-39-1959 Dynamic Longitudinal and Directional Stability Derivatives for a 45 deg Sweptback-Wing Airplane Model at Transonic Speeds《在跨音速下 45后掠翼飞机模型的动态纵向和航向稳定性导数》.pdf NASA-TM-X-39-1959 Dynamic Longitudinal and Directional Stability Derivatives for a 45 deg Sweptback-Wing Airplane Model at Transonic Speeds《在跨音速下 45后掠翼飞机模型的动态纵向和航向稳定性导数》.pdf
  • NASA-TM-X-56023-1974 Drag reduction obtained by rounding vertical corners on a box-shaped ground vehicle《通过在盒状陆上车辆上将垂直边角制圆获得的阻力下降》.pdf NASA-TM-X-56023-1974 Drag reduction obtained by rounding vertical corners on a box-shaped ground vehicle《通过在盒状陆上车辆上将垂直边角制圆获得的阻力下降》.pdf
  • NASA-TM-X-71903-1976 A theoretical study of the acoustic impedance of orifices in the presence of a steady grazing flow《在有稳定擦过流量时的孔口声阻抗理论研究》.pdf NASA-TM-X-71903-1976 A theoretical study of the acoustic impedance of orifices in the presence of a steady grazing flow《在有稳定擦过流量时的孔口声阻抗理论研究》.pdf
  • NASA-TM-X-72695-1975 The effect of chine tires on nose gear water-spray characteristics of a twin engine airplane《脊骨轮胎对双发动机飞机前起落架喷水特性的影响》.pdf NASA-TM-X-72695-1975 The effect of chine tires on nose gear water-spray characteristics of a twin engine airplane《脊骨轮胎对双发动机飞机前起落架喷水特性的影响》.pdf
  • NASA-TM-X-72797-1975 Evaluation of high pressure water blast with rotating spray bar for removing paint and rubber deposits from airport runways and review of runway slipperiness p.pdf NASA-TM-X-72797-1975 Evaluation of high pressure water blast with rotating spray bar for removing paint and rubber deposits from airport runways and review of runway slipperiness p.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1