1、06-01-12 10 22 19.13 - 1 SECTION 10 22 19.13 DEMOUNTABLE METAL PARTITIONS MODIFICATION 06-01-12 UPDATE OF STANDARDS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 10 22 19.13 - 2 SECTION 10 22 19.13 DEMOUNTABLE METAL PARTITIONS SPEC WRITER

2、NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies movable partitions, metal faced sandwich type with mineral fiber core, nominal 22 mm (7/8

3、inch) thick. 1.2 RELATED WORK A. Electrical Work: Division 26, ELECTRICAL. B. Door Hardware: Section 08 71 00, DOOR HARDWARE. C. Color of Finish: Section 09 06 00, SCHEDULE FOR FINISHES. 1.3 DESIGN CRITERIA A. Floor fastenings: Concealed and adjustable to variations in floor level and finish. B. Doo

4、r and panel units: Interchangeable and not less than / 1000 mm (40 inches)/ / wide unless otherwise shown. C. Partition units containing doors: Adjustable vertically and capable of assembly on floors having normal deviations from a plane surface, without cutting the doors. D. Provide for installatio

5、n of electrical wiring through vertical and horizontal frame members. 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Samples: Metal panel, 200 mm (eight inches) square, with baked-on enamel finish, each color. C. Shop Drawings: Complete dra

6、wings, 1/2 full scale, showing details of construction and anchorage. SPEC WRITER NOTE: Update applicable publications to current issue at time of project specification preparation. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 10 22 19.13

7、 - 3 1.5 APPLICABLE PUBLICATIONS A. American Society for Testing and Material (ASTM): A1008/A1008M-12 Steel, Sheet, Cold Rolled, Carbon, Structural, High-Strengthen Low Alloy with Improved Formability, Solution Hardened and Bake Hardened C665-11 Mineral-Fiber Blanket Thermal Insulation for Light Fra

8、me Construction and Manufactured Housing C920-11 Elastomeric Joint Sealants C1036-11 . Flat Glass C1048-04 . Heat-Treated Flat Glass PART 2 - PRODUCTS SPEC WRITER NOTE: Make material requirements agree with applicable requirements specified in the referenced Applicable Publications. Update and speci

9、fy only that which applies to the project. 2.1 MATERIALS A. Sheet Steel: ASTM A1008, Cold-Rolled Commercial Quality of the following thickness: Panel Face Sheets 0.9 mm (0.036 inch) Top Filler Face Sheets 0.9 mm (0.036 inch) End Filler Face Sheets 9 mm (0.036 inch) Door Face Sheets 0.9 mm (0.036 inc

10、h) Glazing Beads 0.9 mm (0.036 inch) Door Frames 1.3 mm (0.048 inch) Post Caps 1.3 mm (0.048 inch) Cornice 1.3 mm (0.048 inch) Base 1.3 mm (0.048 inch) Wall and Ceiling Channels 1.3 mm (0.048 inch) Posts 1.6 mm (0.060 inch) B. Mineral Fiber Insulation: ASTM C665, Type I. C. Glazing Cushions: 1. Chan

11、nel shaped, continuous, of rubber, vinyl, polyethylene or neoprene. D. Glass: /1. ASTM C1048, Kind FT (tempered, clear), Condition A, Type, I, Class 1, Quality q3, 6 mm (1/4 inch) thick./ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 10 22

12、 19.13 - 4 /2. ASTM C1036, flat glass, Type I, Class 1, Quality q3, 6 mm (1/4 inch) thick./ /3. ASTM C1036, wire glass, Type II, Class 1, Quality q6, Form 3, finish f1./ 2.2 FABRICATION A. Panels: 1. Fabricate panels of two steel face sheets with mineral fiber core. 2. Space horizontal steel reinfor

13、cements in panels minimum of 300 mm (12 inches) on centers vertically. 3. Spot weld reinforcement to face sheets minimum of 75 mm (3 inches) on centers horizontally. 4. Design panels to facilitate field cutting. B. Posts: 1. Notch or punch posts for clip connections. 2. Design posts to permit extens

14、ion of partitions in any or all four directions without disturbing posts in place. 3. Provide convenient access to electrical wiring. 4. Posts caps shall be snap-on type and finish flush with vertical sides of panels. 5. Provide free standing end panels with end posts. 6. Locate switch cutouts 135 m

15、m (54 inches) above finished floor and receptacle cutouts 400 mm (16 inches) above finished floor. C. Base: 1. Approximately 100 mm (four inches) high with not more than 6 mm (1/4-inch) projection. 2. Provide base on both sides of partitions, adjustable to floor irregularities, and readily removable

16、 in unit lengths to afford access to electrical wiring. 3. Provide raceways for electrical wiring. D. Cornice: Molded type, approximately 63 mm (2-1/2 inches) high, with provision for electrical wiring. SPEC WRITER NOTE: Check drawings and verify whether Mineral-Board or Steel Face Filler Panels are

17、 required by project. Edit accordingly. E. Top Fillers (Cornice To Ceiling): 1. Fabricate of two 3 mm (1/8 inch) thick mineral-board face sheets with mineral fiber core, overall thickness same as panels. 2. Seat bottom of sheets in recess formed in top of metal cornice. Provided by IHSNot for Resale

18、No reproduction or networking permitted without license from IHS-,-,-06-01-12 10 22 19.13 - 5 3. Secure top of sheets in steel ceiling channels equipped with inorganic compressive seal. 4. Point joints in mineral-board fillers flush, then tape and finish smooth, and ready for painting. 5. Center ver

19、tical joints in filler sheets on snap-on post caps below. F. End Fillers: 1. Fabricate of two steel face sheets with mineral fiber core and finish same thickness as panel units. 2. Fasten end fillers to adjacent panel verticals and fit end fillers into wall channels, fastened to building constructio

20、n. 3. Design wall channels to provide for compression strip to seal wall irregularities. 4. Make fillers removable without damaging wall. G. Doors: 1. Flush metal type, 45 mm (1-3/4 inches) thick of size shown. 2. Reinforce doors with internal bracing no thinner than 0.9 mm (0.036 inch) thick sheet

21、steel extending full height of door and spaced not over 150 mm (6 inches) on centers horizontally. /3. Reinforce with 0.38 mm (0.0149 inch) thick continuous truss shaped steel reinforcing extending full height and width of door./ 4. Insulate door panels as specified for partition panels. 5. Reinforc

22、e cutouts in doors for hinges, closers, holders, and lock or latch strike points with minimum 11 gage steel plates. 6. Make cut-outs and drilling and tapping of reinforcement for hardware in doors in accordance with templates furnished by hardware manufacturer. 7. Reinforce cutouts and sinkages for

23、mortised template hardware with steel plates and tap as required. 8. Provide 2 mm (3/32 inch) clearance between door at jambs and head, and 19 mm (3/4 inch) clearance between finish floor and bottom of bottom rail. H. Door Frames: 1. Rabbet frames for doors and reinforce at hinge, closer, and lock p

24、oints. 2. Make cut-outs and drilling and tapping of reinforcement for hardware on frames in accordance with templates furnished by hardware manufacturer. 3. Provide cut-outs for strike plates and hinges with dust boxes of sheet steel welded to the back of the frames. 4. Drill lock strike jambs of ea

25、ch frame for reception of three mutes as specified in Section 08 71 00, DOOR HARDWARE. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-06-01-12 10 22 19.13 - 6 I. Glazing: 1. Bed glass, except tempered glass, in felt, elastic glazing compound, or put

26、ty. 2. Set tempered glass using resilient glazing cushions. 3. Provide metal glazing beads, either snap-in type or secure with oval-head screws. 4. Cope or miter corners. J. Finish: Clean exposed metal surfaces (except stainless steel, non-ferrous and plated metal) of movable partitions free of scal

27、e, rust, oil and grease and apply two coats of baked-on enamel finish. PART 3 - EXECUTION 3.1 INSTALLATION A. Install partitions so as to be straight, rigid, securely anchored, plumb and level. B. All fastening devices are to be as shown on shop drawings. 3.2 FIELD PAINTING Touch-up all nicks and scratches with paint, matching color and texture of baked-on enamel finish, furnished by partition manufacturer. - - - E N D - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1