1、10-09 32 12 16 - 1 SECTION 32 12 16 ASPHALT PAVING SPEC WRITER NOTE: Delete or add information between / - / and any other items applicable to project. Any item added to the text shall be covered under Applicable Publications and Products and the paragraphs renumbered. PART 1 - GENERAL 1.1 DESCRIPTI

2、ON This work shall cover the composition, mixing, construction upon the prepared subgrade, and the protection of hot asphalt concrete pavement. The hot asphalt concrete pavement shall consist of an aggregate or asphalt base course and asphalt surface course constructed in conformity with the lines,

3、grades, thickness, and cross sections as shown. Each course shall be constructed to the depth, section, or elevation required by the drawings and shall be rolled, finished, and approved before the placement of the next course. SPEC WRITER NOTE: The Designer and Spec Writer shall determine whether th

4、e State Highway Spec will be used or a new specification will be developed to cover the work of this Section. This guide specification is for use when the project requirements shall conform to the State Highway Spec. Highway spec must contain quality standards, percentage of compaction, and tests fo

5、r quality and field and laboratory compaction. Where the Highway Spec calls for “Test“, items “Designated“, items to be “Established“ and other such delegated duties to be performed by a State “Commission“, “Engineer“, “Laboratory“ or other authorized agent; edit this spec to have responsibility for

6、 these items to be that of the Contractor. The Contractor shall retain and reimburse a laboratory to perform said duties; or to obtain a certification from the authorized representative of the State; or to obtain certification from the asphalt paving producer. Certificate of compliance shall cover q

7、uality and gradation of aggregate base, quality and grades of asphalt course materials, and that the job-mixture meets or exceeds the State requirements. 1.2 RELATED WORK A. Laboratory and field testing requirements: Section 01 45 29, TESTING LABORATORY SERVICES. B. Subgrade Preparation: Paragraph 3

8、.3 and Section 31 20 00, EARTH MOVING. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-09 32 12 16 - 2 C. Pavement Markings: Section 32 17 23, PAVEMENT MARKINGS. 1.3 INSPECTION OF PLANT AND EQUIPMENT The Resident Engineer shall have access at all

9、times to all parts of the material producing plants for checking the mixing operations and materials and the adequacy of the equipment in use. 1.4 ALIGNMENT AND GRADE CONTROL The Contractors Registered Professional Land Surveyor shall establish and control the pavement (aggregate or asphalt base cou

10、rse and asphalt surface course) alignments, grades, elevations, and cross sections as shown on the Drawings. 1.5 SUBMITTALS A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, furnish the following: B. Data and Test Reports: 1. Aggregate Base Course: Sources, gradation,

11、 liquid limit, plasticity index, percentage of wear, and other tests required by State Highway Department. 2. Asphalt Base/Surface Course: Aggregate source, gradation, soundness loss, percentage of wear, and other tests required by State Highway Department. 3. Job-mix formula. C. Certifications: 1.

12、Asphalt prime and tack coat material certificate of conformance to State Highway Department requirements. 2. Asphalt cement certificate of conformance to State Highway Department requirements. SPEC WRITER NOTE: Add required certification to Subparagraph 3. 3. Job-mix certification - Submit plant mix

13、 certification that mix equals or exceeds the State Highway Specification. D. One copy of State Highway Department Specifications. E. Provide MSDS (Material Safety Data Sheets) for all chemicals used on ground. PART 2 - PRODUCTS 2.1 GENERAL A. / Aggregate base / Asphaltic base / and asphalt concrete

14、 materials shall conform to the requirements of the following and other appropriate sections of the latest version of the State Highway Material Specifications, including amendments, addenda and errata. Where the term “Engineer“ or “Commission“ is referenced in the State Highway Provided by IHSNot f

15、or ResaleNo reproduction or networking permitted without license from IHS-,-,-10-09 32 12 16 - 3 Specifications, it shall mean the VA Resident Engineer or VA Contracting Officer. SPEC WRITER NOTE: Add any construction requirements not adequately specified in the State Highway Spec. 2.2 AGGREGATES A.

16、 Provide aggregates consisting of crushed stone, gravel, sand, or other sound, durable mineral materials processed and blended, and naturally combined. B. Subbase aggregate (where required) maximum size: 38mm(1-1/2“). C. Base aggregate maximum size: 1. Base course over 152mm(6“) thick: 38mm(1-1/2“);

17、 2. Other base courses: 19mm(3/4“). D. Asphaltic base course: 1. Maximum particle size not to exceed 25.4mm(1”). 2. Where conflicts arise between this specification and the requirements in the latest version of the State Highway Specifications, the State Specifications shall control. E. Aggregates f

18、or asphaltic concrete paving: Provide a mixture of sand, mineral aggregate, and liquid asphalt mixed in such proportions that the percentage by weight will be within: Sieve Sizes Percentage Passing 19mm(3/4“) 100 9.5mm(3/8“) 67 to 85 6.4mm(1/4“) 50 to 65 2.4mm(No. 8 mesh) 37 to 50 600m(No. 30 mesh)

19、15 to 25 75m(No. 200 mesh) 3 to 8 plus 50/60 penetration liquid asphalt at 5 percent to 6-1/2 percent of the combined dry aggregates. 2.3 ASPHALTS A. Comply with provisions of Asphalt Institute Specification SS2: 1. Asphalt cement: Penetration grade 50/60 2. Prime coat: Cut-back type, grade MC-250 3

20、. Tack coat: Uniformly emulsified, grade SS-1H 2.4 SEALER A. Provide a sealer consisting of suitable fibrated chemical type asphalt base binders and fillers having a container consistency suitable for Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1

21、0-09 32 12 16 - 4 troweling after thorough stirring, and containing no clay or other deleterious substance. B. Where conflicts arise between this specification and the requirements in the latest version of the State Highway Specifications, the State Specifications shall control. PART 3 - EXECUTION 3

22、.1 GENERAL The Asphalt Concrete Paving equipment, weather limitations, job-mix formula, mixing, construction methods, compaction, finishing, tolerance, and protection shall conform to the requirements of the appropriate sections of the State Highway Specifications for the type of material specified.

23、 3.2 MIXING ASPHALTIC CONCRETE MATERIALS A. Provide hot plant-mixed asphaltic concrete paving materials. 1. Temperature leaving the plant: 143 degrees C(290 degrees F) minimum, 160 degrees C(320 degrees F) maximum. 2. Temperature at time of placing: 138 degrees C(280 degrees F) minimum. 3.3 SUBGRADE

24、 A. Shape to line and grade and compact with self-propelled rollers. B. All depressions that develop under rolling shall be filled with acceptable material and the area re-rolled. C. Soft areas shall be removed and filled with acceptable materials and the area re-rolled. D. Should the subgrade becom

25、e rutted or displaced prior to the placing of the subbase, it shall be reworked to bring to line and grade. E. Proof-roll the subgrade with maximum 45 tonne (50 ton) gross weight dump truck as directed by VA Resident Engineer or VA Contracting Officer. If pumping, pushing, or other movement is obser

26、ved, rework the area to provide a stable and compacted subgrade. 3.4 BASE COURSES A. Subbase (when required) 1. Spread and compact to the thickness shown on the drawings. 2. Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the rol

27、ler. 3. After completion of the subbase rolling there shall be no hauling over the subbase other than the delivery of material for the top course. B. Base 1. Spread and compact to the thickness shown on the drawings. Provided by IHSNot for ResaleNo reproduction or networking permitted without licens

28、e from IHS-,-,-10-09 32 12 16 - 5 2. Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller. 3. After completion of the base rolling there shall be no hauling over the base other than the delivery of material for the top cour

29、se. C. Thickness tolerance: Provide the compacted thicknesses shown on the Drawings within a tolerance of minus 0.0mm (0.0“) to plus 12.7mm (0.5“). D. Smoothness tolerance: Provide the lines and grades shown on the Drawings within a tolerance of 5mm in 3m (3/16 inch in ten feet). E. Moisture content

30、: Use only the amount of moisture needed to achieve the specified compaction. 3.5 PLACEMENT OF ASPHALTIC CONCRETE PAVING A. Remove all loose materials from the compacted base. B. Apply the specified prime coat, and tack coat where required, and allow to dry in accordance with the manufacturers recom

31、mendations as approved by the Architect or Engineer. C. Receipt of asphaltic concrete materials: 1. Do not accept material unless it is covered with a tarpaulin until unloaded, and unless the material has a temperature of not less than 130 degrees C(280 degrees F). 2. Do not commence placement of as

32、phaltic concrete materials when the atmospheric temperature is below 10 degrees C (50 degrees F), not during fog, rain, or other unsuitable conditions. D. Spreading: 1. Spread material in a manner that requires the least handling. 2. Where thickness of finished paving will be 76mm (3“) or less, spre

33、ad in one layer. E. Rolling: 1. After the material has been spread to the proper depth, roll until the surface is hard, smooth, unyielding, and true to the thickness and elevations shown own the drawings. 2. Roll in at least two directions until no roller marks are visible. 3. Finished paving smooth

34、ness tolerance: a. No depressions which will retain standing water. b. No deviation greater than 3mm in 1.8m (1/8“ in six feet). 3.6 APPLICATION OF SEAL COAT A. Prepare the surfaces, mix the seal coat material, and apply in accordance with the manufacturers recommendations as approved by the Archite

35、ct or Engineer. B. Apply one coat of the specified sealer. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-09 32 12 16 - 6 C. Achieve a finished surface seal which, when dry and thoroughly set, is smooth, tough, resilient, of uniform black color,

36、and free from coarse textured areas, lap marks, ridges, and other surface irregularities. 3.7 PROTECTION Protect the asphaltic concrete paved areas from traffic until the sealer is set and cured and does not pick up under foot or wheeled traffic. 3.8 FINAL CLEAN-UP Remove all debris, rubbish, and excess material from the work area. - - - E N D - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASTM D6674-2001(2017) 6875 Standard Guide for Proficiency Test Program for Fabrics《织物用熟练试验程序的标准指南》.pdf ASTM D6674-2001(2017) 6875 Standard Guide for Proficiency Test Program for Fabrics《织物用熟练试验程序的标准指南》.pdf
  • ASTM D6675-2001(2006) Standard Practice for Salt-Accelerated Outdoor Cosmetic Corrosion Testing of Organic Coatings on Automotive Sheet Steel《机动车薄钢板上有机涂层的盐加速户外表面腐蚀试验的标准实施规程》.pdf ASTM D6675-2001(2006) Standard Practice for Salt-Accelerated Outdoor Cosmetic Corrosion Testing of Organic Coatings on Automotive Sheet Steel《机动车薄钢板上有机涂层的盐加速户外表面腐蚀试验的标准实施规程》.pdf
  • ASTM D6675-2001(2011) 0625 Standard Practice for Salt-Accelerated Outdoor Cosmetic Corrosion Testing of Organic Coatings on Automotive Sheet Steel《机动车薄钢板上有机涂层的盐加速户外表面腐蚀试验的标准操作规程》.pdf ASTM D6675-2001(2011) 0625 Standard Practice for Salt-Accelerated Outdoor Cosmetic Corrosion Testing of Organic Coatings on Automotive Sheet Steel《机动车薄钢板上有机涂层的盐加速户外表面腐蚀试验的标准操作规程》.pdf
  • ASTM D6675-2001(2015) 4104 Standard Practice for Salt-Accelerated Outdoor Cosmetic Corrosion Testing of Organic Coatings on Automotive Sheet Steel《汽车钢板上有机涂层盐加速户外化妆品腐蚀试验的标准实施规程》.pdf ASTM D6675-2001(2015) 4104 Standard Practice for Salt-Accelerated Outdoor Cosmetic Corrosion Testing of Organic Coatings on Automotive Sheet Steel《汽车钢板上有机涂层盐加速户外化妆品腐蚀试验的标准实施规程》.pdf
  • ASTM D6676 D6676M-2013 8265 Standard Test Method for Cathodic Disbonding of Exterior Pipeline Coatings at Elevated Temperatures Using Interior Heating《用内部加热测定高温下外部管道镀层的阴极断接的标准试验方法》.pdf ASTM D6676 D6676M-2013 8265 Standard Test Method for Cathodic Disbonding of Exterior Pipeline Coatings at Elevated Temperatures Using Interior Heating《用内部加热测定高温下外部管道镀层的阴极断接的标准试验方法》.pdf
  • ASTM D6677-2007 Standard Test Method for Evaluating Adhesion by Knife《用刀评估粘结性的标准试验方法》.pdf ASTM D6677-2007 Standard Test Method for Evaluating Adhesion by Knife《用刀评估粘结性的标准试验方法》.pdf
  • ASTM D6677-2007(2012) 0000 Standard Test Method for Evaluating Adhesion by Knife《用刀评估粘结性的标准试验方法》.pdf ASTM D6677-2007(2012) 0000 Standard Test Method for Evaluating Adhesion by Knife《用刀评估粘结性的标准试验方法》.pdf
  • ASTM D6677-2018 red 6250 Standard Test Method for Evaluating Adhesion by Knife.pdf ASTM D6677-2018 red 6250 Standard Test Method for Evaluating Adhesion by Knife.pdf
  • ASTM D6681-2005 Standard Test Method for Evaluation of Engine Oils in a High Speed Single-Cylinder Diesel Engine-Caterpillar 1P Test Procedure《卡特皮勒1P试验程序评价高速单缸柴油发动机中发动机油的标准试验方法》.pdf ASTM D6681-2005 Standard Test Method for Evaluation of Engine Oils in a High Speed Single-Cylinder Diesel Engine-Caterpillar 1P Test Procedure《卡特皮勒1P试验程序评价高速单缸柴油发动机中发动机油的标准试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1