VDI 2512-2012 Principle rules for just-in-time just-in-sequence supplies of different production levels.pdf

上传人:周芸 文档编号:1075512 上传时间:2019-04-06 格式:PDF 页数:14 大小:2.23MB
下载 相关 举报
VDI 2512-2012 Principle rules for just-in-time just-in-sequence supplies of different production levels.pdf_第1页
第1页 / 共14页
VDI 2512-2012 Principle rules for just-in-time just-in-sequence supplies of different production levels.pdf_第2页
第2页 / 共14页
VDI 2512-2012 Principle rules for just-in-time just-in-sequence supplies of different production levels.pdf_第3页
第3页 / 共14页
VDI 2512-2012 Principle rules for just-in-time just-in-sequence supplies of different production levels.pdf_第4页
第4页 / 共14页
VDI 2512-2012 Principle rules for just-in-time just-in-sequence supplies of different production levels.pdf_第5页
第5页 / 共14页
点击查看更多>>
资源描述

1、 ICS 03.100.50, 35.240.50 VDI-RICHTLINIEN Februar 2012 February 2012 VEREIN DEUTSCHER INGENIEURE Just-in-Time-/Just-in-Sequence-Prinzipien zur Verknpfung von Fertigungsstufen in der Produktion Principle rules for just-in-time/just-in-sequence supplies of different production levels VDI 2512 Ausg. de

2、utsch/englisch Issue German/English Die deutsche Version dieser Richtlinie ist verbindlich. The German version of this guideline shall be taken as authori-tative. No guarantee can be given with respect to the English translation. VDI-Gesellschaft Produktion und Logistik (GPL) Fachbereich Technische

3、Logistik VDI-Handbuch Technische Logistik, Band 7: Materialfluss I (Gestaltung) VDI-Handbuch Produktionstechnik und Fertigungsverfahren, Band 1: Grundlagen und Planung Vervielfltigungauchfrinnerbetriebliche Zwecke nicht gestattet /Reproductionevenforinternalusenot permittedFrhere Ausgabe:09.96 Forme

4、redition:09/96Zu beziehen durch /Available atBeuth Verlag GmbH,10772 BerlinAlle Rechte vorbehalten /Allrightsreserved Verein DeutscherIngenieuree.V.,Dsseldorf2012Inhalt Seite Contents Page Vorbemerkung . 2 Einleitung . 2 1 Anwendungsbereich . 2 2 Grundlagen 3 3 JIT-/JIS-Potenziale 4 4 JIT-/JIS-Strat

5、egie . 5 5 JIT-/JIS-Organisation 6 5.1 Informationsfluss . 8 5.2 Disposition und Lieferabruf . 8 5.3 Qualittssicherung 9 5.4 Zeithaushalt 9 5.5 Abgrenzung zu KANBAN . 10 6 JIT-/JIS-Materialflusskette 11 7 JIT-/JIS-Auswirkungen . 12 8 JIT-/JIS-Einfhrungsstrategie 13 9 Zusammenfassung . 14 Schrifttum

6、14 Preliminary note . 2 Introduction 2 1 Scope . 2 2 Fundamentals 3 3 Potentials for JIT/JIS . 4 4 JIT/JIS strategy 5 5 Organization of JIT/JIS . 6 5.1 Information flow 8 5.2 Materials planning and delivery call-off 8 5.3 Quality assurance . 9 5.4 Time budget . 9 5.5 Distinction from KANBAN . 10 6 J

7、IT/JIS material flow chain . 11 7 Consequences of JIT/JIS 12 8 JIT/JIS implementation strategy 13 9 Summary 14 Bibliography . 14 B55EB1B3E14C22109E918E8EA43EDB30F09DCCB7EF8AD9NormCD - Stand 2012-04 2 VDI 2512 Alle Rechte vorbehalten Verein Deutscher Ingenieure e.V., Dsseldorf 2012 Vorbemerkung Der I

8、nhalt dieser Richtlinie ist entstanden unter Be-achtung der Vorgaben und Empfehlungen der Richt-linie VDI 1000. Alle Rechte, insbesondere die des Nachdrucks, der Fotokopie, der elektronischen Verwendung und der bersetzung, jeweils auszugsweise oder vollstndig, sind vorbehalten. Die Nutzung dieser VD

9、I-Richtlinie ist unter Wah-rung des Urheberrechts und unter Beachtung der Lizenzbedingungen (www.vdi-richtlinien.de), die in den VDI-Merkblttern geregelt sind, mglich. Allen, die ehrenamtlich an der Erarbeitung dieser VDI-Richtlinie mitgewirkt haben, sei gedankt. Preliminary note The content of this

10、 guideline has been developed in strict accordance with the requirements and recommendations of the guideline VDI 1000. All rights are reserved, including those of reprint-ing, reproduction (photocopying, micro copying), storage in data processing systems and translation, either of the full text or

11、of extracts. The use of this guideline without infringement of copyright is permitted subject to the licensing con-ditions specified in the VDI Notices (www.vdi-richtlinien.de). We wish to express our gratitude to all honorary contributors to this guideline. Einleitung Die Aufteilung eines Fertigung

12、sprozesses in Stufen verlngert die Durchlaufzeit (DLZ) eines Produkts. Diese wird wesentlich lnger als die eigentliche Fer-tigungszeit. Zur sicheren Versorgung der Produktion werden auerdem Puffer bzw. Lger fr alle Materi-alien und Teile vor der jeweiligen Fertigungsstufe gebildet. Just-in-Time (JIT

13、) bzw. Just-in-Sequence (JIS) ver-sucht, Puffer und Lger zu vermeiden und somit die DLZ der Fertigungszeit mglichst anzunhern. Durch die konsequente ganzheitliche Betrachtung des Materialflusses zwischen den Fertigungsstufen werden Beitrge zur Produktivittssteigerung in Produktion und Logistik erzie

14、lt. Im engeren Sinne ist die JIT-/JIS-Produktion eine Abstimmung bzw. Harmonisierung der Fertigungs-kapazitt beim Lieferer und der Fertigungskapazitt beim Abnehmer mit den geringsten Zwischenpuf-fern. 1 Anwendungsbereich Die Rationalisierungsmglichkeiten durch eine JIT-/JIS-Verknpfung auf allen Mate

15、rialflussebenen der Produktion und Logistik sollen erkannt und ge-nutzt werden. Diese Richtlinie zeigt die Grundge-danken, die Strategie und den Weg zu einem Kon-zept, unabhngig von Unternehmensgre und Branche, auf. Generell bedeutet jede richtig realisierte JIT-/JIS-Verknpfung eine Reduzierung der

16、Herstellkosten, gleich ob sie extern oder intern erfolgt. Introduction Dividing a production process into steps increases the throughput time of a product. It becomes con-siderably longer than the actual production time. In order to secure the production supply, buffers or stocks also have to be cre

17、ated for all materials and parts in front of each production step. The principles of “just-in-time (JIT)” and “just-in-sequence (JIS)” try to avoid stocks and buffers and make throughput time match production time as closely as possible. A consistently holistic view of the material flow between prod

18、uction steps helps increase produc-tivity in production and logistics. In the narrower sense, JIT/JIS production repre-sents a coordination or harmonization between the production capacities on the suppliers side and on the buyers side with the smallest possible inter-mediate buffers. 1 Scope The ef

19、ficiency-enhancement potential of a JIT/JIS link on all levels of material flow in production and logistics should be recognized and exploited. This guideline points out the basic ideas, the strat-egy and the way towards finding a concept, irre-spective of a companys size and line of business. Gener

20、ally speaking, every correctly implemented JIT/JIS link reduces production costs, be it inter-nally or externally. B55EB1B3E14C22109E918E8EA43EDB30F09DCCB7EF8AD9NormCD - Stand 2012-04All rights reserved Verein Deutscher Ingenieure e.V., Dsseldorf 2012 VDI 2512 3 2 Grundlagen Just-in-Time (JIT) Just-

21、in-Time bezeichnet eine lagerlose, sortenreine Direktbelieferung aus dem Versandpuffer des Lie-feranten direkt ans Montageband oder einen band-nahen Bereitstellpuffer. Die Bestellung basiert in der Regel auf einem Lieferabruf nach VDA 4905. Die Anlieferung erfolgt tglich, bei greren Be-darfen auch m

22、ehrmals tglich. Es findet keine Ein-lagerung mit systemgesttzter Bestandsfhrung statt, sondern in der Regel eine Bereitstellung in Durchschubschienen gem First-in-first-out-Prin-zip (FIFO), die mittels markierter Mindest- und Maximalbestnde ein einfaches, optisches Be-standscontrolling ermglichen. D

23、er Mindestbe-stand entspricht der Wiederbeschaffungszeit (zu-meist ein Tagesbedarf), der Maximalbestand ergibt sich aus dem Sicherheitsbestand plus einer Anlie-ferung (also zumeist zwei Tagesbedarfen). Im Ide-alfall erfolgt die Belieferung in einer Direktrelation mit 1: 1-Tausch der Ladungstrger, so

24、dass der Lkw leere Ladungstrger direkt wieder zum Lieferanten zurckbringt. Eine JIT-Belieferung wird in der Praxis meistens bei Teilefamilien mit bis zu sechs bis zehn Varianten und einem tglichen Transport-volumen von mindestens 80 m3bis 100 m3einge-setzt, um den Steuerungsaufwand zu minimieren und

25、 wirtschaftliche Transporte zu ermglichen. Sie ist die kostengnstigste und schlankste Beliefe-rungsform. Just-in-Sequence (JIS) Just-in-Sequence bezeichnet eine lagerlose Direkt-belieferung in Produktionssequenz, das heit, die Anlieferung erfolgt entsprechend der Auftragsrei-henfolge im getakteten M

26、ontageband. Die Bestel-lung erfolgt auf Basis des VDA 4905 (Tagesbe-darfsvorschau) und des VDA 4916 (produktions-nummernbezogener Abruf), die konkrete Auftrags-Reihenfolge wird wenige Stunden vor dem Verbau des Teils mit dem Inneneinbau-Impuls (IB) ber-tragen. Auf Basis dieser Informationen wird die

27、 Anliefer-Sequenz im Idealfall bereits in der Pro-duktion des Lieferanten erzeugt (one piece flow“). Bei Losgrenfertigung erfolgt hierfr eine gesonderte Sequenzierung aus einem sortenreinen Bestand. Die Anliefermenge ergibt sich aus der zwischen bertragung des IB-Impulses und dem Verbau des Teils zu

28、r Verfgung stehenden Zeit (Zeithaushalt) fr Impulssammlung, Produktion bzw. Sequenzierung, Verladung und Transport. Der Transport bei JIS erfolgt in der Regel in ge-schlossenen Anlieferkreislufen mit 1: 1-Tausch der Ladungstrger und fest getakteten Fahrplnen. Zur Sicherstellung der Auftragsreihenfol

29、ge werden 2 Fundamentals Just in Time (JIT) Just in time is a stockless, unmixed direct delivery from the suppliers dispatch buffer to the assembly line or to a staging buffer in its close proximity. Orders are typically based on a delivery call-off according to VDA 4905. Delivery is once daily or,

30、with larger demand, several times a day. There is no storage input with a systematic inventory con-trol, but typically staging is done in push-through rails according to the first-in-first-out (FIFO) principle, enabling a simple optical inven-tory control with the help of minimum and maxi-mum invent

31、ory marks. The minimum inventory corresponds to the replenishment time (usually the daily requirement quantity), the maximum inven-tory equals the safety inventory plus one delivery (i.e. usually twice the daily requirement). Ideally, delivery is a direct 1: 1 exchange of load carriers, which means

32、the truck brings empty load carriers directly back to the supplier. JIT deliveries are used in practice for parts families with up to six through ten variants and a daily transport volume of at least 80 m3up to 100 m3, in order to minimize control outlays and ensure cost-efficient transport. It is t

33、he leanest and most cost-effective form of delivery. Just in Sequence (JIS) Just in sequence is a stockless direct delivery method that runs synchronously with the produc-tion sequence, i.e. delivery takes place according to the time-phased order sequence on the assembly line. Ordering is based on V

34、DA 4905 (daily re-quirements forecast) and VDA 4916 (production number-related call-off); the concrete order se-quence is transmitted by an “interior assembly impulse” (IB) a few hours before the part is fitted. On the basis of this information, the delivery se-quence will ideally be generated at an

35、 early stage, i.e. in the suppliers production (“one piece flow”). In batch production, a separate sequencing will take place for this from a sorted inventory. The delivery quantity results from the time available for impulse collection, production or sequencing, loading and transport between the mo

36、ment the IB impulse is transmitted and the moment when the part must be fitted (time budget). With JIS, trans-port typically takes place in closed delivery cycles with a 1: 1 exchange of load carriers and fixed schedules. In order to ensure the order sequence, the load carriers are staged in push-th

37、rough rails B55EB1B3E14C22109E918E8EA43EDB30F09DCCB7EF8AD9NormCD - Stand 2012-04 4 VDI 2512 Alle Rechte vorbehalten Verein Deutscher Ingenieure e.V., Dsseldorf 2012 die Ladungstrger im strengen FIFO-Prinzip in Durchschubschienen bereitgestellt. JIS ist aufgrund der hohen Anforderungen an die Steueru

38、ngssyste-me und Notfallkonzepte sowie den gegebenenfalls entstehenden Zusatzaufwand einer gesonderten Sequenzierung eine sehr kostenintensive Beliefe-rungsform. Sie wird immer dann eingesetzt, wenn bei hoher Varianz und groem Volumen der Teile eine sortenreine Bereitstellung nicht mglich ist. under

39、strict adherence to the FIFO principle. JIS is a very costly form of delivery due to the high re-quirements posed on the control systems and emergency concepts and the possible additional effort of separate sequencing. It is used wherever a high variance and volume of parts does not allow for an unm

40、ixed staging of parts. 3 JIT-/JIS-Potenziale Vor der Planung und Einfhrung von JIT-/JIS-Konzepten muss untersucht werden, ob im Ferti-gungsprozess entsprechende Potenziale vorhanden sind. Indikatoren fr JIT-/JIS-Potenziale sind im logistischen Bereich: Hohe Materialbestnde in der Produktion und Logi

41、stik. Bei nicht produktionssynchronen Ver-sorgungsstrategien haben Materialbestnde die Funktion, Produktionsschwankungen und Kapazi-ttsengpsse auszugleichen oder zu berbrcken. Ungeplanter Materialumschlag, der hufig auftritt. Auerplanmige Eingriffe in die Ab-lauforganisation fhren zu ungeplanten Mat

42、e-rialbewegungen und damit verbundenem zu-stzlichem Handling. Auch hiermit werden Engpsse in der Produktion berbrckt. Belegintensiver, inhomogener Informationsfluss. Ist die Materialflusssteuerung und Bestandsver-folgung mit hohem Aufwand an Kommunikation und Belegen verbunden, muss davon ausgegan-g

43、en werden, dass ein entsprechendes Rationali-sierungspotenzial vorhanden ist. Produktionsbezogene Kriterien zur Beurteilung der JIT-/JIS-Potentiale sind: Hufige, ungeplante Produktionsumstellun-gen. Manahmen dieser Art bedingen als Folge zwangslufig ungeplante Materialbewegungen und zustzlich zu puf

44、fernde Bestnde. Die Verwaltung ist aufwendig. Hoher Anteil nicht wertschpfender Zeiten in der Durchlaufzeit. Die Analyse der Durchlauf-zeiten hinsichtlich nicht wertschpfender Antei-le liefert ebenfalls einen Indikator zur Entschei-dung fr die Einfhrung von JIT-/JIS-Versor-gungsstrategien. Sind eine

45、r oder mehrere der genannten Indikatoren gegeben, ist es sinnvoll, weiter in die Planung zur Einfhrung von JIT-/JIS-Strategien einzusteigen. 3 Potentials for JIT/JIS Before JIT/JIS concepts are planned and imple-mented, it is necessary to investigate whether the production process has the necessary

46、potentials for this. Among the indicators for JIT/JIS potential in the area of logistics are: High material inventories in production and logistics.In the case of supply strategies that are not synchronized with production, material in-ventories are there to compensate for produc-tion fluctuations a

47、nd capacity bottlenecks. Frequent unplanned material handling. Any unscheduled intervention in the process organi-zation leads to unplanned material movements and thus to additional handling. This is another way in which production bottlenecks are com-pensated. Paper-intensive, inhomogeneous informa

48、tion flow. If material flow control and inventory tracking are associated with high communica-tion outlays and a lot of exchange of paper, it must be assumed that there is some potential for rationalization. Among the criteria for assessing the JIT/JIS poten-tials in the area of production are: Freq

49、uent unplanned changes in production. Measures of this type often lead to unplanned material movements and additional inventories that must be buffered. Administration is expen-sive. High percentage of non-value-adding times within throughput time. An analysis of throughput times with regard to the proportion of non-value-adding time might also lead to a decision in favour of the implementation of JIT/JIS supply strategies. If one or more of the

展开阅读全文
相关资源
猜你喜欢
  • DIN SPEC 4002-102-2011 Properties and their scopes for product data exchange - Part 102 Units and quantities on www DINsml net《产品数据交换的特性及其范围 第102部分 www DINsml net上的单位和数量》.pdf DIN SPEC 4002-102-2011 Properties and their scopes for product data exchange - Part 102 Units and quantities on www DINsml net《产品数据交换的特性及其范围 第102部分 www DINsml net上的单位和数量》.pdf
  • DIN SPEC 4002-13-2010 Properties and their scopes for product data exchange - Part 13 Assignment of the identifier to ISO TS 29002-5《产品数据交换的属性及其范围 第13部分 ISO TS 29002-5的识别器任务》.pdf DIN SPEC 4002-13-2010 Properties and their scopes for product data exchange - Part 13 Assignment of the identifier to ISO TS 29002-5《产品数据交换的属性及其范围 第13部分 ISO TS 29002-5的识别器任务》.pdf
  • DIN SPEC 4002-8-2010 Properties and their scopes for product data exchange - Part 8 Rules for designing application classes《产品数据交换特性和其范围 第8部分 设计应用级别规则》.pdf DIN SPEC 4002-8-2010 Properties and their scopes for product data exchange - Part 8 Rules for designing application classes《产品数据交换特性和其范围 第8部分 设计应用级别规则》.pdf
  • DIN SPEC 40032-2013 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Type URM connector family《纤维光学互连设备和无源组件 纤维光学连接器接口 URM型连接器系列》.pdf DIN SPEC 40032-2013 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Type URM connector family《纤维光学互连设备和无源组件 纤维光学连接器接口 URM型连接器系列》.pdf
  • DIN SPEC 40170-2013 Measurement and judgement of the cavitation noise《气穴现象测量和判断》.pdf DIN SPEC 40170-2013 Measurement and judgement of the cavitation noise《气穴现象测量和判断》.pdf
  • DIN SPEC 4261-6-2011 Determination of the nominal daily load of domestic wastewater during the operation of small wastewater treatment plants according to EN 12566-3 and DIN 4261-1.pdf DIN SPEC 4261-6-2011 Determination of the nominal daily load of domestic wastewater during the operation of small wastewater treatment plants according to EN 12566-3 and DIN 4261-1.pdf
  • DIN SPEC 42673-4-2012 Totally-enclosed fan-cooled three phase asynchronous motors with squirrel-cage - designs IM B3 IM B5 IM B14 with bearings - Maximum envelope dimensions《全封闭风扇冷.pdf DIN SPEC 42673-4-2012 Totally-enclosed fan-cooled three phase asynchronous motors with squirrel-cage - designs IM B3 IM B5 IM B14 with bearings - Maximum envelope dimensions《全封闭风扇冷.pdf
  • DIN SPEC 42887 (DIN IEC TR 60887)-2010 Glass bulb designation system for lamps (IEC TR 60887 2010)《灯具用玻璃灯泡命名系统(IEC TR 60887-2010)》.pdf DIN SPEC 42887 (DIN IEC TR 60887)-2010 Glass bulb designation system for lamps (IEC TR 60887 2010)《灯具用玻璃灯泡命名系统(IEC TR 60887-2010)》.pdf
  • DIN SPEC 42955-2012 Shaft extension run out and of mounting flanges for rotating electrical machinery frame size larger then 315 - Tolerances test《旋转电力机械的耗尽轴伸和安装法兰 外框尺寸大于315 容差试验》.pdf DIN SPEC 42955-2012 Shaft extension run out and of mounting flanges for rotating electrical machinery frame size larger then 315 - Tolerances test《旋转电力机械的耗尽轴伸和安装法兰 外框尺寸大于315 容差试验》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1