1、1 UG 北京市地方标准 DB 11/ 693 2017 56085-2017 建 设工程 临建 房屋技 术标 准 Technical specification of temporarybuilding for construction engineering 2017 06 29 发布 2017 1001 实施 北 京 市 住 房 和 城 乡 建 设 委 员 会 北 京 市 质 量 技 术 监 督 局 DB 联合发布 2 北京市地方标准 建 设工程 临建 房屋 技 术标 准 Technical specification of Temporary building for construc
2、tion engineering 编号:DB11/ 693-2017 备案号:56085-2017 ( ) 2017 10 1 2017 北京3 前言 3.2.7 3.5.5 3.5.6 3.5.7 2015 2015 22 DB11/ 693-2009 1 2 3 4 5 6 7 8 A B 1 “ ” 2 “ ” “ ” “ ” 3 “ ” “ ” 4 “ ” “ ” 4 52 100161 E-mail 83982040 ( ) 5 6 1 10 2 11 3 13 3.1 13 3.2 15 3.3 17 3.4 18 3.5 19 4 22 4.1 22 4.2 22 5 25 5
3、.1 25 5.2 25 5.3 26 6 28 6.1 28 6.2 28 6.3 29 6.4 29 7 30 7 7.1 30 7.2 30 7.3 31 7.4 31 8 32 8.1 32 8.2 32 A 34 B 35 . 36 . 37 . 39 8 Contents 1 Generalprovision1 2 Terminologies 2 3 Designrequirements.3 3.1 General requirements .3 3.2 Architectural design .4 3.3 Structural design .5 3.4 Electromech
4、anical design 7 3.5 Material requirements 7 4 Production requirements.10 4.1 General requirements.10 4.2 Manufacture and machining11 5 Planelayout13 5.1 General requirements.13 5.2 Fire separation.14 5.3 Fire lane.15 6Installation,acceptance and operational requirements18 6.1 General requirements .1
5、8 6.2 Installation requirements.18 6.3 Inspection and acceptance .19 6.4 Operational safety requirements 19 7Demolition,transportation,maintenance and management .21 7.1 General requirements.21 7.2 Demolition .21 7.3 Stockpiling .22 7.4 Transportation,maintenance and management.22 8 Greenconstructio
6、n requirements .25 8.1 General requirements.25 8.2 Green production and construction.25 9 Appendix A Temporarybuildingengineering installation quality inspection and acceptance form .27 Appendix B Boxbuildingengineering installation quality inspection and acceptance form .28 List of quoted standards
7、 .29 List of normative standards .28 Explanation of provisions 30 10 1 1.0.1 1.0.2 1.0.3 1.0.4 , 11 2 2.0.1 Temporarybuilding for construction engineering 2.0.2 Container house 2.0.3 Assembled temporary houses with light-weight steel framing 2.0.4 Structural element 2.0.5 Grosscross-section area 2.0
8、.6 Effective sectional area 2.0.7 Effective net cross-sectional area 12 13 3 3.1 3.1.1 5 20 3.1.2 3.1.3 3.1.4 3.1.5 0 S R (3.1.5) 0 0.9 0.95 S S GB50009 R 3.1.6 0.35kN/m 2 GB50009 3.1.7 1.0 3.1.8 7 0.10g 14 3.1.9 3.1.9 3.1.9 KW/(m 2 K) 0.55 0.6 0.6 3.0 3.1.10 LWH 6055mm2990mm2896mm 3.1.10 3.1.10 3.1
9、.11 LWH LWH=n 1 M 1 n 2 M 2 n 3 h 3.1.11 M 1 M 1 =1820mm M 2 M 2 =1820mm 15 h h= 950mm n 1 n 2 n 3 3.1.11 3.1.11 3.2 3.2.1 3 300 m 2 3.2.2 GB50352 1.1m 0.10m 3.2.3 16 50 3.2.4 2.5m 4 3.2.5 2.5m 2.5 15 3.2.6 1 200 30 20 GB50016 3.2.7 临 建房 屋安 全疏散 应符 合下列 规定 : 1.多 层临 建房屋 的 安 全出 口 不 应少于 两个 且应分 散布 置 ; 2.临
10、 建房 屋单个 房间 建筑 面积 超过 60 m 2 时,疏 散门 不应少 于 2 个; 3. 办 公 、 宿舍 用房 的疏散 门至 最近安 全出 口的直 线距 离, 位于 两个安全 出口 之 间的 疏散 门不应 大于 25 米 ,位 于袋形 走道 两侧 或尽 端的疏 散门不 应大 于 15 米; 4. 疏 散门 的净宽 度不 应小 于 0.9m , 疏散 楼梯 和走 廊的 净宽度 不应 小于 1.1m 。 3.2.8 1. 2. 3. 0.25 1/7 30% 4. GB/T7106 5 5. 17 3.2.9 GB50345 3.2.10 JGJ146 3.3 3.3.1 3.3.2 1. 2. 3. 4. 3.3.3 3.3.4 1. 2. 3. 4. 2.0kN m 2 2.5kN m 2 5. 3.3.5 3.3.6 GB50017 18 GB50018 3.3.7 3.3.8 3.3.9 3.3.10 C20 MU5 M5 3.3.11 GB50003 3.4 3.4.1 GB50034 JGJ16 GB50054 JGJ46 3.4.2 3.4.3 20 3.4.4 IP54 3.4.5 5 1 36V 19 3.4.6 3.4.7 1.5mm 2.0mm B1 3.4.8 0 1 2 3.4.9 TN-S GB50057 JGJ16 JGJ46 3.4.10