1、Specification for Fiberglass Reinforced Plastic TanksAPI SPECIFICATION 12P THIRD EDITION, OCTOBER 2008EFFECTIVE DATE: APRIL 1, 2009Specification for Fiberglass Reinforced Plastic TanksUpstream SegmentAPI SPECIFICATION 12P THIRD EDITION, OCTOBER 2008EFFECTIVE DATE: APRIL 1, 2009Special NotesAPI publi
2、cations necessarily address problems of a general nature. With respect to particular circumstances, local, state, and federal laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make any warranty or representation
3、, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, or assume any liability or responsibility for any use, or the results of such use, of any information or process disclosed in this publication. Neither API nor any of APIs empl
4、oyees, subcontractors, consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.Classified areas may vary depending on the location, conditions, equipment, and substances involved in any given situation. Users of this specification should
5、consult with the appropriate authorities having jurisdiction.Users of this specification should not rely exclusively on the information contained in this document. Sound business, scientific, engineering, and safety judgment should be used in employing the information contained herein. API publicati
6、ons may be used by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication and hereby expressly disclaims any
7、 liability or responsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict.API publications are published to facilitate the broad availability of proven, sound engineering and operating practices. These
8、publications are not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inhibit anyone from using any other practices.Any manufacturer m
9、arking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such products do in fact conform to the applicable API standard.
10、All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, N
11、.W., Washington, D.C. 20005.Copyright 2008 American Petroleum InstituteForewordNothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, or product covered by letters patent. Neither sho
12、uld anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent.Shall: As used in a standard, “shall” denotes a minimum requirement in order to conform to the specification.Should: As used in a standard, “should” denotes a recommendation
13、 or that which is advised but not required in order to conform to the specification. This document was produced under API standardization procedures that ensure appropriate notification and participation in the developmental process and is designated as an API standard. Questions concerning the inte
14、rpretation of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permission
15、to reproduce or translate all or any part of the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every five years. A one-time extension of up to two years may be added to this review cycle. Status
16、 of the publication can be ascertained from the API Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is published annually and updated quarterly by API, 1220 L Street, N.W., Washington, D.C. 20005.Suggested revisions are invited and should be submitted to t
17、he Standards Department, API, 1220 L Street, NW, Washington, D.C. 20005, standardsapi.org.iiiContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.1 General . . . . .
18、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.2 Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19、. . . . . . . . . . . 12 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.2 Material . . . . . . . . . . . . . . . . . . . . . . .
21、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.3 Resin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.4 R
22、einforcing Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33.5 Surfacing Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23、. . . . . . . . . . . . . . 33.6 Appurtenances. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.2 Shell DesignChop-spray . . . . . . . . . . . . . .
25、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34.3 Shell DesignFilament Wound and Chop-hoop. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44.4 Shell DesignLaminate Construction . . . . . . . . . .
26、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44.5 Bottom Knuckle Radius Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54.6 Bottom to Shell Joint (Chop-spray) Design . . . .
27、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54.7 Bottom Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64.8 Geometry . . . . . . . . . . . . .
28、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64.9 Deck Laminate Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64.10 Cle
29、anout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64.11 Nozzles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30、. . . . . . . . . . . . . . . . . . . 74.12 Cutout Reinforcements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74.13 Appurtenances. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
31、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.14 Walkway, Ladder, Lifting and Hold Down Lugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.15 Downcomer Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.16 Thief Hatches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.17 Design Considerations for Potential Electrostatic Haz
33、ards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.18 Grounding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125 Venting Requirements. . . . . . . . . . . . . . .
34、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125.1 Normal Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125.2 Emergency Venting .
35、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136 Fabrication and Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
36、6.1 Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136.2 Hydrostatic Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
37、. . . . . . . . . . . . . . . . . . 146.3 Quality Control Tests. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147 Marking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
38、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Annex A (informative) Recommended Installation and Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17Annex B (normative) Walkways, Stairways, and Ladders . . . . . . . . . . . . . . . . . .
39、. . . . . . . . . . . . . . . . . . . . . . . . . 19Annex C (normative) Specification for Walkway, Stairway, and Ladder Bolting . . . . . . . . . . . . . . . . . . . . . . . . . 21Annex D (informative) Use of the API Monogram by Licensees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
40、 . . . . . . . 23vPageFigures1 Bottom Knuckle of Flat-bottom Tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 FRP Tank Nozzle Location Guide (Used with Datasheet) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
41、. . . . . . . 83 Closed Top FRP Tank Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114 Thief-hatch Cutouts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
42、 . . . . . . . . . . . . 125 Suspended Conductor Example Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136 Metal Label Format . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
43、 . . . . . . . . . . . . . . . 16Tables1 Tank Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 Typical Dimensions of Manways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44、. . . . . . . . . . . . . . . . . . . . . . . . . . . . 71Specification for Fiberglass Reinforced Plastic Tanks1 Scope1.1 GeneralThis specification covers material, design, fabrication, and testing requirements for fiberglass reinforced plastic (FRP) tanks. Only shop-fabricated, vertical, cylindrica
45、l tanks are covered. Tanks covered by this specification are intended for above ground and atmospheric pressure service. Unsupported cone bottom tanks are outside the scope of this specification.This specification is designed to provide the petroleum industry with various standard sizes of FRP tanks
46、. Because of the versatility of FRP tanks, the user shall be responsible for determining the suitability of FRP tanks for the intended service.The consequences of exposing the FRP tank to high temperatures created by exposure fires should be considered. This material loses strength as the temperatur
47、e increases. FRP tanks should be suitably protected against fire exposure or so located that any spills resulting from the failure of these materials could not unduly expose persons, buildings, structures or other equipment to the above.1.2 ComplianceThe manufacturer is responsible for complying wit
48、h all of the provisions of this specification. 2 ReferencesASTM A153 1, Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel HardwareASTM B454, Specification for Mechanically Deposited Coatings/Cadmium/Zinc on Ferrous MetalsASTM C581, Standard Practice for Determining Chemical Resista
49、nce of Thermosetting Resins Used in Glass-Fiber-Reinforced Structures Intended for Liquid ServiceASTM D638, Standard Test Method for Tensile Properties of PlasticsASTM D648, Standard Test Method for Deflection Temperature of Plastics Under Flexural Load in the Edgewise PositionASTM D790, Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating MaterialsASTM D2150, Specification for Woven Roving Glass Fabric for Polyester-Glass LaminatesASTM D2583, Standard Test Method for Indentation Hardness of Rigid Plastics by Means of a Barcol