API RP T-6-2002 Recommended Practice for Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore Locations (FIRST EDITI.pdf

上传人:fatcommittee260 文档编号:400350 上传时间:2018-10-25 格式:PDF 页数:14 大小:244.59KB
下载 相关 举报
API RP T-6-2002 Recommended Practice for Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore Locations (FIRST EDITI.pdf_第1页
第1页 / 共14页
API RP T-6-2002 Recommended Practice for Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore Locations (FIRST EDITI.pdf_第2页
第2页 / 共14页
API RP T-6-2002 Recommended Practice for Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore Locations (FIRST EDITI.pdf_第3页
第3页 / 共14页
API RP T-6-2002 Recommended Practice for Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore Locations (FIRST EDITI.pdf_第4页
第4页 / 共14页
API RP T-6-2002 Recommended Practice for Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore Locations (FIRST EDITI.pdf_第5页
第5页 / 共14页
亲,该文档总共14页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Recommended Practice for Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore LocationsAPI RECOMMENDED PRACTICE T-6FIRST EDITION, OCTOBER 2002REAFFIRMED, JANUARY 2013Recommended Practice for Training and Qualification of Personnel in We

2、ll Control Equipment and Techniques forWireline Operations on Offshore LocationsUpstream SegmentAPI RECOMMENDED PRACTICE T-6FIRST EDITION, OCTOBER 2002REAFFIRMED, JANUARY 2013SPECIAL NOTESAPI publications necessarily address problems of a general nature. With respect to partic-ular circumstances, lo

3、cal, state, and federal laws and regulations should be reviewed.API is not undertaking to meet the duties of employers, manufacturers, or suppliers towarn and properly train and equip their employees, and others exposed, concerning healthand safety risks and precautions, nor undertaking their obliga

4、tions under local, state, or fed-eral laws.Information concerning safety and health risks and proper precautions with respect to par-ticular materials and conditions should be obtained from the employer, the manufacturer orsupplier of that material, or the material safety data sheet.Nothing containe

5、d in any API publication is to be construed as granting any right, byimplication or otherwise, for the manufacture, sale, or use of any method, apparatus, or prod-uct covered by letters patent. Neither should anything contained in the publication be con-strued as insuring anyone against liability fo

6、r infringement of letters patent.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least everyfive years. Sometimes a one-time extension of up to two years will be added to this reviewcycle. This publication will no longer be in effect five years after its publication da

7、te as anoperative API standard or, where an extension has been granted, upon republication. Statusof the publication can be ascertained from the API Upstream Segment telephone (202) 682-8000. A catalog of API publications and materials is published annually and updated quar-terly by API, 1220 L Stre

8、et, N.W., Washington, D.C. 20005.This document was produced under API standardization procedures that ensure appropri-ate notification and participation in the developmental process and is designated as an APIstandard. Questions concerning the interpretation of the content of this standard or com-me

9、nts and questions concerning the procedures under which this standard was developedshould be directed in writing to the standardization manager, American Petroleum Institute,1220 L Street, N.W., Washington, D.C. 20005. Requests for permission to reproduce ortranslate all or any part of the material

10、published herein should also be addressed to the gen-eral manager.API standards are published to facilitate the broad availability of proven, sound engineer-ing and operating practices. These standards are not intended to obviate the need for apply-ing sound engineering judgment regarding when and w

11、here these standards should beutilized. The formulation and publication of API standards is not intended in any way toinhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the markingrequirements of an API standard is solely responsible for

12、 complying with all the applicablerequirements of that standard. API does not represent, warrant, or guarantee that such prod-ucts do in fact conform to the applicable API standard.All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means,

13、 electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, N.W., Washington, D.C. 20005.Copyright 2002 American Petroleum InstituteFOREWORDThis Recommended Practice (RP) is under

14、the jurisdiction of the American PetroleumInstitute (API) Executive Committee on Drilling and Production Operations (ECDPO). Ithas been prepared with the overall advisory guidance of the API and the Offshore OperatorsCommittee (OOC).The purpose of this RP is to provide criteria for the qualification

15、 of offshore wireline per-sonnel in well control equipment operations and techniques to ensure safety and to preventpollution.API publications may be used by anyone desiring to do so. Every effort has been made bythe Institute to assure the accuracy and reliability of the data contained in them; how

16、ever, theInstitute makes no representation, warranty, or guarantee in connection with this publicationand hereby expressly disclaims any liability or responsibility for loss or damage resultingfrom its use or for the violation of any federal, state, or municipal regulation with which thispublication

17、 may conflict.Suggested revisions are invited and should be submitted to the standardization manager,American Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005.iiiCONTENTSPage1 GENERAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

18、 . . . . . . . . . 11.1 Introduction and Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.2 Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 GUIDELINES FOR COURSE CURRICUL

19、A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12.1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12.2 Wireline Helper/Assistant Training Requirements for Qualificationin Well Control Operations . . . . . . .

20、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12.3 Wireline Operator/Supervisor Training Requirements for Qualificationin Well Control Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 QUALIFICATION PROCEDURES . . . . . . . . .

21、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.1 Qualification of Wireline Helpers/Assistants . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23.2 Qualification of Wireline Operators/Supervisors . . . . . . . . . . . . . . . . . . . . . . . . . 2v1Recommended Practice for Tr

22、aining and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations on Offshore Locations1 General1.1 INTRODUCTION AND SCOPEThis Recommended Practice (RP) provides criteria for thequalification of wireline personnel in well control equipmentoperations and technique

23、s. Although it does include recom-mendations for training wireline personnel on general rig wellcontrol equipment and theory, it should be noted that the mainfocus for training should be those operations using a lubricatoras the primary well control mechanism. Wireline personnelclassifications to wh

24、ich this RP is applicable are the Helper/Assistant and Operator/Supervisor. This RP is intended for thedevelopment of training courses with well-defined curriculaand includes recommendations for testing to assure that a can-didate is qualified when he/she completes a course.The employer should maint

25、ain a record of the trainingwhich each employee receives in accordance with this RP.Each employee should be furnished documentation of thesuccessful completion of each level of training.1.2 POLICYThis RP may be used by a company or educational institu-tion to develop and conduct a qualification prog

26、ram as out-lined above. However, the Institute makes no representation,warranty or guarantee in connection with the publication ofany API specification, or recommended practice, and herebyexpressly disclaims any liability or responsibility for loss ordamage resulting from their use, for any violatio

27、n of any fed-eral, state or municipal regulation with which an API specifi-cation or recommended practice may conflict, or for theinfringement of any patent resulting from the use of an APIspecification or recommended practice.2 Guidelines for Course Curricula2.1 INTRODUCTIONThis section describes t

28、he knowledge and skills that shouldbe presented to the candidate through classroom lectures andhands-on demonstrations. Curriculum content is described ona general basis for each wireline crew member classification.Specific detail should be developed by each training organi-zation using the criteria

29、 contained in this section as a guide-line. A training program developed by a contractor oroperator should be directed toward the well control equip-ment and techniques most widely used in their respectiveoperations.Other organizations offering training programs shoulddevelop a detailed curriculum d

30、irected toward well controlequipment and techniques most widely used offshore.The training programs may be conducted wherever theparticular part of the course curriculum can be presented mosteffectively, whether it be on the rig, platform, in a classroom,or a training facility at another location. E

31、ach candidate should be provided with a manual contain-ing the course materials for future reference and review. 2.2 WIRELINE HELPER/ASSISTANT TRAINING REQUIREMENTS FOR QUALIFICATION IN WELL CONTROL OPERATIONSa. Prerequisite for Wireline Helper/Assistant QualificationAll candidates should have satis

32、fied the employmentrequirements of their employer.b. Instructions on Relevant Governmental RegulationsThe candidate should receive instructions on governmen-tal regulations that are pertinent both to their work and to wellcontrol activities. The candidate should understand the over-all purpose of th

33、e appropriate regulations.c. Instructions on Blowout Prevention EquipmentThe candidate should receive general instructions withinthe first 6 months of their employment on the purpose, opera-tion, and maintenance of the following, consistent with theirassigned duties:1. Annular type blowout preventer

34、s2. Ram type blowout preventers3. Accumulator systems4. Inside blowout preventers5. Full opening safety valves6. Chokes and manifolds7. Fluid level measuring devicesd. Instructions on Formation Pressure, Hydrostatic Pressure,Kicks and BlowoutsThe candidate should receive general instructions on theb

35、asic principles of well control such as, but not limited to:1. Pressure and force2. Formation pressure3. Hydrostatic pressure4. Overbalance5. Definition and causes of a kick6. Kick indicators7. Definition and causes of blowouts8. Well shut-in procedurese. Instructions on Wireline Equipment and Proce

36、duresThe candidate should receive instructions on the followingequipment and procedures utilized when conducting wirelineoperations:1. Wireline unit components2. Types of wireline3. Lubricators2 API RECOMMENDEDPRACTICET-64. Wireline valves5. Lifting/hoisting equipment6. Wireline tool string componen

37、ts7. Basic wireline tools8. Surface wellhead valves and safety devices9. Subsurface production equipment and safety devices10. Pressure testing procedures11. Safety procedures2.3 WIRELINE OPERATOR/SUPERVISOR TRAINING REQUIREMENTS FOR QUALIFICATION IN WELL CONTROL OPERATIONSa. Prerequisite for Operat

38、or/Supervisor QualificationAll candidates should have satisfied the training require-ment as listed under 2.2 for wireline Helper/Assistant.b. Instructions on Relevant Governmental RegulationsThe candidate should receive instructions on governmen-tal regulations that are pertinent both to their work

39、 and to wellcontrol activities. The candidate should understand the over-all purpose of the appropriate regulations, including thoserelated to spill prevention and pollution contingency plans. c. Instructions Regarding the Following Well ControlRelated Topics:1. Drilling/workover/completion fluid ty

40、pes and character-istics2. Gas expansion and migration3. Lubricator rig-up and testing requirements4. Shut-in procedures5. Well control drills d. Instructions on the Following Wireline Operations RelatedTopics:1. Wireline unit securement and safe operationprocedures2. Proper rig up a deployment into

41、 the well3. Well monitoring while conducting operations4. Shearing wireline5. Fishing wireline 6. Simultaneous operations7. Job assignments and responsibilitiese. Instructions Regarding the Following Unusual WirelineOperations:1. Collapsed tubing2. Holes in tubing3. Stuck wireline tools4. Excessive

42、pressure on casing or tubing5. Fishing under pressure6. Loss of circulation7. Perforating operations/safety3 Qualification Procedures3.1 QUALIFICATION OF WIRELINE HELPERS/ASSISTANTSa. Prerequisites:1. The candidate shall have satisfied the requirementsof 2.2a2. The candidate shall be completely fami

43、liar with all ofthe items listed in 2.2b 2.2eb. Type of TestsWritten tests and “hands-on” demonstrations should beused to assure the candidate has a thorough understanding ofthe well control equipment and techniques outlined in 2.2.Test results shall be entered and maintained in the success-ful cand

44、idates permanent training record. Appropriate docu-mentation of training shall be provided the successfulcandidate and copies maintained by the training organization.c. Maintenance of QualificationTraining requirements outlined in 2.2 and qualificationtesting should be repeated at a maximum of every

45、 3 years.3.2 QUALIFICATION OF WIRELINE OPERATORS/SUPERVISORSa. Prerequisites:1. The candidate shall have satisfied the requirements of2.2 and 2.3 2. The candidate shall be completely familiar with all ofthe items listed in 2.3b 2.3eb. Type of TestsWritten tests and “hands-on” demonstrations should b

46、e usedto assure the candidate has a thorough understanding of thewell control equipment and techniques outlined in 2.2 and 2.3.Test results shall be entered and maintained in the success-ful candidates permanent training record. Appropriate docu-mentation of training shall be provided the successful

47、candidate and copies maintained by the training organization.c. Maintenance of QualificationTraining requirements outlined in 2.2 and 2.3 and qualifica-tion testing should be repeated at a maximum of every 3 years.Available through Global Engineering Documents.Effective January 1, 2002.Phone Orders:

48、 1-800-854-7179 (Toll-free in the U.S. and Canada)303-397-7956 (Local and International)Fax Orders: 303-397-2740Online Orders: Invoice To (o Check here if same as Ship To )Name:Title:Company:Department:Address:City: State/Province:Zip/Postal Code: Country:Telephone:Fax:E-Mail:oPayment EnclosedoP.O.

49、No. (Enclose Copy)oCharge My Global Account No.oVISAoMasterCardoAmerican ExpressoDiners CluboDiscoverCredit Card No.:Print Name (As It Appears on Card):Expiration Date:Signature:Quantity Product Number Title TotalSubtotalApplicable Sales Tax (see below)Rush Shipping Fee (see below)Shipping and Handling (see below)Total (in U.S. Dollars)H To be placed on Standing Order for future editions of this publication,place a check mark in the SO column and sign here: Pricing and availability subject to change without notice.Date:SOH Unit Priceo API Member (Check if Yes)Ship T

展开阅读全文
相关资源
  • API SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdfAPI SALES OF NGL & LRG-2018 2016 Sales of Natural Gas Liquids and Liquefied Refinery Gas.pdf
  • API MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdfAPI MPMS 9 4-2018 Manual of Petroleum Measurement Standards Chapter 9 4-Continuous Density Measurement Under Dynamic (Flowing) Conditions (FIRST EDITION).pdf
  • API MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdfAPI MPMS 9 3-2012 Manual of Petroleum Measurement Standards Chapter 9 3 Standard Test Method for Density Relative Density and API Gravity of Crude Petroleum and.pdf
  • API MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdfAPI MPMS 9 2-2012 Manual of Petroleum Measurement Standards Chapter 9 2 Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure H.pdf
  • API MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdfAPI MPMS 9 1-2012 Manual of Petroleum Measurement Standards Chapter 9 1 Standard Test Method for Density Relative Density or API Gravity of Crude Petroleum and .pdf
  • API MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdfAPI MPMS 8 5-2015 Manual of Petroleum Measurement Standards Chapter 8 5 Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils Condensate.pdf
  • API MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdfAPI MPMS 8 5 SPANISH-2015 Manual of Petroleum Measurement Standards Chapter 8 5 - Standard Practice for Manual Piston Cylinder Sampling for Volatile Crude Oils .pdf
  • API MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdfAPI MPMS 8 4-2017 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (FOURTH .pdf
  • API MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdfAPI MPMS 8 4-2014 Manual of Petroleum Measurement Standards Chapter 8 4 Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (THIRD E.pdf
  • API MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdfAPI MPMS 8 3-1995 Manual of Petroleum Measurement Standards Chapter 8 - Sampling Section 3 - Standard Practice for Mixing and Handling of Liquid Samples of Petr.pdf
  • 猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > API

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1