1、 GUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS JULY 2008 NOTICE NO. 8 January 2016 The following Rule Changes were approved by the ABS Rules Committee on 10 June 2015 and become EFFECTIVE AS OF 1 JANUARY 2016. (See http:/www.eagle.org for the consolidated version of the Guide for Building an
2、d Classing Mobile Offshore Units 2008, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classification
3、Offshore Units and Structures (Part 1).) CHAPTER 7 SURVEYS SECTION 2 SURVEYS AFTER CONSTRUCTION (Add new Subsection 7-2/23, as follows:) 23 Crew Habitability (2016) See Sections 7-2-10 of the ABS Rules for Building and Classing Floating Production Installations for the survey requirements. ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 1