ABS 168 CORR-2011 GUIDE FOR WELL TEST SYSTEMS《井测试系统指南》.pdf

上传人:amazingpat195 文档编号:400667 上传时间:2018-10-27 格式:PDF 页数:2 大小:29.08KB
下载 相关 举报
ABS 168 CORR-2011 GUIDE FOR WELL TEST SYSTEMS《井测试系统指南》.pdf_第1页
第1页 / 共2页
ABS 168 CORR-2011 GUIDE FOR WELL TEST SYSTEMS《井测试系统指南》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ABSGUIDE FOR WELL TEST SYSTEMS .2010 1 GUIDE FOR WELL TEST SYSTEMS MARCH 2010 CORRIGENDA/EDITORIALS 15 February 2011 CORRIGENDA/EDITORIALS 10 January 2012 CORRIGENDA/EDITORIALS 1 August 2013 Page No. Paragraph Comments Section 1 General 2 1/9.1 In last paragraph, reference “ABS Guide for Building a

2、nd Classing Facilities on Offshore Installations (Facilities Guide)” to read “ABS Rules for Building and Classing Facilities on Offshore Installations (Facilities Rules)”. Section 2 Well Test Ready 5 2/11 In last paragraph, reference “3-3/13 of the Facilities Guide” to read “3-3/17 of the Facilities

3、 Rules”. 5 2/13.3 Reference “3-8/5.1.3 of the Facilities Guide” to read “3-8/5.1.3 of the Facilities Rules”. Section 3 Temporary Well Test Systems 7 3/9.1 In second paragraph, reference “3-3/11.1 of the Facilities Guide” to read “3-3/15.1 of the Facilities Rules”. 8 3/9.5 Reference “ABS Guide for th

4、e Certification of Drilling Systems” to read “ABS Guide for the Classification of Drilling Systems”. 8 3/9.7 Reference “5/3.13 of the CDS Guide” to read “5/3.7 of the CDS Guide”. 8 3/9.11 Reference “Chapter 3, Section 6 of the Facilities Guide” to read “Chapter 3, Section 6 of the Facilities Rules”.

5、 Section 4 Permanent Well Test Systems 10 4/1 Reference “Facilities Guide” to read “Facilities Rules”. 10 4/7.1 Reference “3-1-2/1.11.3 of the MODU Rules” to read “3-1-3/1.11.3 of the MODU Rules”. 11 4/9 Reference “3-3/3, 3-3/5, 3-3/11.1, 3-3/11.3, 3-3/17, and 3-3/23 of Facilities Guide” to read “3-

6、3/3, 3-3/5, 3-3/15.1, 3-3/15.3, 3-3/9, and 3-3/7 of the Facilities Rules”. 11 4/9.5 Reference “3-3/10 and 3-3/21 of the Facilities Guide” to read “3-3/11 and 3-3/11.9 of the Facilities Rules”. 11 4/9.7 Reference “5/3.13 of the CDS Guide” to read “5/3.7 of the CDS Guide”. 11 4/9.7 Reference “3-3/19.7

7、 and Appendix 2 of the Facilities Guide” to read “3-3/11.7 and Appendix 2 of the Facilities Rules”. 11 4/9.9 Reference “Chapter 3, Section 6 of the Facilities Guide” to read “Chapter 3, Section 6 of the Facilities Rules”. 11 4/13 Reference “3-3/11 of the Facilities Guide” to read “3-3/15 of the Faci

8、lities Rules”. Corrigenda/Editorials 1 August 2013 2 ABSGUIDE FOR WELL TEST SYSTEMS .2010 Section 4 Permanent Well Test Systems 12 4/15 Reference “3-3/7, 3-8/5.1.3, 3-8/5.1.4, 3-8/5.1.5 and 3-8/7.3 of the Facilities Guide” to read “3-3/13, 3-8/5.1.3, 3-8/5.1.4, 3-8/5.1.5 and 3-8/7.3 of the Facilitie

9、s Rules”. 12 4/17 Reference “3-6/15 of the Facilities Guide” to read “3-6/15 of the Facilities Rules”. Section 5 Materials for Well Test Systems and Components 13 5/3 Reference “Section 3-1-3 of the MODU Rules” to read “Section 3-1-4 of the MODU Rules”. Section 6 Welding and Nondestructive Examinati

10、on 18 6/11.3.5i) In first line, add quotation mark after “Materials.” to read “ASTM 10: “Standard Test Methods for Brinell Hardness of Metallic Materials.”. Section 8 Surveys After Construction and Maintenance of Class 25 8/5.9 Reference “Appendix 7-A-14 “Guide for Survey Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)” to read “Appendix 7-A-14 “Survey Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)”.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1