1、 GUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS JUNE 2010 CORRIGENDA/EDITORIALS 1 September 2010 CORRIGENDA/EDITORIALS 6 March 2012 CORRIGENDA/EDITORIALS 1 September 2012 CORRIGENDA/EDITORIALS 1 June 2013 CORRIGENDA/EDITORIALS 1 February 2014 CORRIGENDA/EDITORIALS 1 June 2
2、014 CORRIGENDA/EDITORIALS 1 January 2015 CORRIGENDA/EDITORIALS 1 January 2016 CORRIGENDA/EDITORIALS 22 February 2016 Page No. Paragraph Comments Foreword iii - In first paragraph, “the ABS Guide for Building and Classing Membrane Tank LNG Vessels” to read “Part 5C, Chapter 12 of the ABS Rules for Bu
3、ilding and Classing Steel Vessels”. iii - In first paragraph, “ABS Guide for Building and Classing Floating Production Installations” to read “ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. iii Reference Note In first paragraph, “FPI Guide” to read “FPI Rules”. C
4、hapter 1 Conditions of Classification Section 1 Scope and Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification Offshore Units and Structures) 2 1-1/5.1 Revise to read, “the symbol null A1, followed by Offshore Liquefied Gas Terminal and the appropriate notation
5、for the intended service listed below.”. 3 1-1/7.1 Reference “ABS Guide for Building and Classing Floating Production Installations (FPI Guide)” to read “ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. 3 1-1/7.5 Reference “2-2/3” to read “2-2/5”. 4 1-1/11.1 In PCI
6、, “Instititue” to read “Institute”. 5 1-1/11.3 Item vi) to read “FPI Rules ABS Rules for Building and Classing Floating Production Installations”. 5 1-1/11.3 Item vii) to read “Facilities Rules ABS Rules for Building and Classing Facilities on Offshore Installations”. 5 1-1/11.3 Delete reference “LN
7、GC Guide ABS Guide for Building and Classing Membrane Tank LNG Vessels”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 1 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Comments Chapter 2 Design Considerations Section 1 Classification of Floating Offsho
8、re Liquefied Gas Terminals 9 2-1/3.3 Reference “4-3-5/15 of the Steel Vessel Rules” to read “Section 2 of the ABS Guide for Dynamic Positioning Systems”. 10 2-1/3.9 In second paragraph, reference “3-5/7.4” to read “3-5/7.5”. 10 2-1/3.9.2 In third paragraph, “FPI Guide” to read “FPI Rules”. 10 2-1/3.
9、9.2 In last paragraph, “FPI Guide” to read “FPI Rules”. 11 2-1/3.13 (was 2-1/3.11) Add new Paragraph to reference OHCM notation, as follows: “3.11 Hull Construction Monitoring Program Floating Liquefied Gas Terminals designed and reviewed to the FLGT Guide are to comply with the requirements of the
10、Offshore Hull Construction Monitoring Program in Chapter 3, Appendix 6 of this Guide and have the notation OHCM.” 12 2-1/11 In Item ii), “FPI Guide” to read “FPI Rules”. 12 2-1/11 In Item iii), “Facilities Guide” to read “Facilities Rules”. 12 2-1/11 In Item ix), “FPI Guide” to read “FPI Rules”. 15
11、2-1/13.1.1 In first paragraph, “FPI Guide” to read “FPI Rules”. 16 2-1/13.1.4 In second bullet, reference “2-2/1” to read “2-2/1.1.1”. 16 2-1/13.3 In last bullet, “FPI Guide” to read “FPI Rules”. 21 2-1/15 In last paragraph, “FPI Guide” to read “FPI Rules”. (2 places) Chapter 2 Design Considerations
12、 Section 2 Design of Floating Offshore Liquefied Gas Terminals 22 2-2/1.1 In first paragraph, reference “2-2/1” to read “2-2/1.1.1”. 22 2-2/1.1 In first paragraph, “FPI Guide” to read “FPI Rules”. 23 2-2/1.1.3 Reference “Part 3, Chapter 4” to read “Part 3, Chapter 4 of the FPI Rules”. 25 2-2/3 (was
13、2-2/1.3) In first paragraph, reference “2-2/3” to read “2-2/5”. 26 2-2/7 (was 2-2/5) In last paragraph, “FPI Guide” to read “FPI Rules”. (2 places) 26 2-2/7.1.1 Renumber 5.1.1(d) through 5.1.1(g) as 7.1.1(d) through 7.1.1(g). 26 2-2/7.1.2(b) Reference “5C-8-4/9” to read “5C-8-4/19”. 26 2-2/7.1.2(b)
14、Reference “5C-8-4/9.1” to read “5C-8-4/19.1.2”. 26 2-2/7.1.2(c) Reference “5C-8-4/10” to read “5C-8-4/20”. 27 2-2/7.1.4(a)ii) Reference “5C-8-1/11” to read “5C-8-1/11 (ABS)”. 27 2-2/7.1.4(b)ii) Reference “5C-8-1/11” to read “5C-8-1/11 (ABS)”. 27 2-2/7.1.5(b) (was 2-2/5.1.5(b) In second paragraph, de
15、lete reference “and 2-1/3.11”. 30 2-2/9.7 (was 2-2/7.7) Reference “Section 4.3 of NFPA 59A” to read “Section 7.4.3 of NFPA 59A”. 2 ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Comments Chapter 2 Design Co
16、nsiderations Section 2 Design of Floating Offshore Liquefied Gas Terminals 31 2-2/9.9 (was 2-2/7.9) In first paragraph, “Facilities Guide” to read “Facilities Rules”. 31 2-2/11.1 In first paragraph, reference “5C-8-3/8” to read “5C-8-3/8 and 5C-8-5/10.1”. 31 2-2/11.1 In first paragraph, reference “2
17、-2/3” to read “2-2/5”. 31 2-2/11.1 In fourth paragraph, “dependant” to read “dependent”. 32 2-2/11.1 In fifth paragraph, reference “2-2/3” to read “2-2/5”. 32 2-2/11.1.1 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 32 2-2/11.1.1 Reference “NFPA 59, A Standard for the Production
18、, Storage and Handling of Liquefied Natural Gas (LNG) 2001” to read “NFPA 59A, Standard for the Production, Storage and Handling of Liquefied Natural Gas (LNG) 2013”. 33 2-2/11.1.2 In second paragraph, “3-3/17 of the Facilities Guide” to read “3-3/9 of the Facilities Rules”. 33 2-2/11.1.2 In second
19、paragraph, “ABS Guide” to read “ABS Rules”. 34 2-2/11.13 In last line, “FPI Guide” to read “FPI Rules”. 35 2-2/13.5 Reference “2-2/3” to read “2-2/5”. 35 2-2/13.7 Reference “5C-8-3/8” to read “5C-8-3/8 and 5C-8-5/10.1”. 35 2-2/13.9 Reference “Facilities Guide” to read “Facilities Rules”. (2 places)
20、35 2-2/15 In second paragraph, reference “5C-8-1/3.17” to read “5C-8-1/2.24”. 35 2-2/15 In second paragraph, reference “Chapter 7, Section 7.6 of NFPA 59A” to read “Chapter 7, Section 10.7 of NFPA 59A”. 35 2-2/15 In third paragraph, “Facilities Guide” to read “Facilities Rules”. 36 2-2/17 Reference
21、“Facilities Guide” to read “Facilities Rules”. (2 places) 36 2-2/19 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 37 2-2/21 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.3.1 Reference “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.3.2 Re
22、ference “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 38 2-2/23.5 Reference “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.5 Reference “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 38 2-2/23.7 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.7 Refer
23、ence “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 39 2-2/23.9 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 39 2-2/23.11 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 39 2-2/23.15.1 In first paragraph, reference “Section 9.2 of NFPA 59A” to read “Sec
24、tion 12.3 of NFPA 59A”. 39 2-2/23.15.1 In second paragraph, reference “5C-8-5/6” to read “5C-8-5/5”. 40 2-2/25 Reference “FPI Guide” to read “FPI Rules”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 3 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Com
25、ments Chapter 3 Structural Design Requirements Section 1 Introduction 53 3-1/1.1 Reference “the ABS Guide for Building and Classing Membrane Tank LNG Vessels” to read “Part 5C, Chapter 12 of the Steel Vessel Rules”. 53 3-1/1.3 Reference “5C-8-4/2.2” to read “5C-8-4/1.5”. 53 3-1/1.5 In first paragrap
26、h, reference “5C-8-4/2.4.2” to read “5C-8-4/21.1.1”. 53 3-1/1.5 In second paragraph, reference “5C-8-4/4.4” to read “5C-8-4/21”. 53 3-1/1.5 In third paragraph, reference “5C-8-4/4.5” to read “5C-8-4/22”. (2 places) 53 3-1/1.5 In last paragraph, reference “5C-8-4/4.6” to read “5C-8-4/23.2”. (2 places
27、) 54 3-1/3.1 In second line, reference “3-4/Figure 4” to read “3-4/Figure 4 of this Guide”. 55 3-1/3.11 Reference “5C-8-4/2.6” to read “5C-8-4/1.2”. 56 3-1/Table 1 In first row, reference “5C-8-4/8.1” to read “5C-8-4/19.1.1”. 56 3-1/3.19 In fifth paragraph below Table 1, reference “5C-8-4/8” to read
28、 “5C-8-4/10 and 5C-8-4/19”. Chapter 3 Structural Design Requirements Section 3 Load Criteria 69 3-3/Figure 1C SLC 5 In section view of top figure, “30” to read “angle”. 69 3-3/Figure 1C SLC 5 Revise top figure, as follows: xzyT. WebT. WebT. WebT. WebInner BTMCargo Tank BTMVerticalSupportsPort Stbd P
29、rofileanglexzPlanC.L.4 ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Comments Chapter 3 Structural Design Requirements Section 3 Load Criteria 69 3-3/Figure 1C SLC 5 Replace bottom figure, as follows: xzyT
30、. WebT. WebT. WebT. WebInner BTMCargo Tank BTMVerticalSupportsProfilexzPlanC.L.Port Stbd80 3-3/5.9.1 Reference “5C-8-4/12” to read “5C-8-4/28.2”. 82 3-3/5.9.2 In first paragraph, reference “5C-8-4/3.2” to read “5C-8-4/13.2 and 5C-8-4/28.1”. 123 3-3/17.3 In definitions of Csand Ch, “FPI Guide” to rea
31、d “FPI Rules”. (2 places) Chapter 3 Structural Design Requirements Section 4 Initial Scantling Criteria 125 3-4/3.3.1 Reference, “FPI Guide” to read “FPI Rules”. 125 3-4/73.5.1 In definition of Mt, “obtained” to read “described”. 130 3-4/5.7.1 In equation for Wc(f), the following line, and definitio
32、n of c, bc1, “bc1” to read “bc1”. (3 places) 133 3-4/7.1.1 In ninth line, reference “3/5.1.1” to read “3-5/5.1.1”. 134 3-4/7.3.1 In definition of f1, “0.40fmax” to read “fmax”. 137 3-4/7.3.2 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 139 3-4/7.5.3 In definition of , reference “3-
33、4/Figure 5” to read “3-4/Figure 3”. 143 3-4/7.7.2 Delete definitions of k3and pgc. 144 3-4/7.7.3 Delete definitions of k3and pgc. 145 3-4/7.7.4 Delete definitions of k3and pgc. 148 3-4/7.9.2 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 157 3-4/9.5.1 In title, delete “(1 September 2
34、012)”. 159 3-4/9.5.1 In second row of table, “Varies linearly between 0.85 * t3and t3” to read “(0.5 + Mr/2) * t3”. 165 3-4/9.7 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 167 3-4/11.3.2 In equation for t2, “k1” to read “k4”. 167 3-4/11.3.2 In definition of po, reference “3-1/15.1
35、1” to read “3-1/3.11”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 5 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Comments Chapter 3 Structural Design Requirements Section 4 Initial Scantling Criteria 168 3-4/11.5.1 In equation for t4, “k1” to read
36、 “k4”. 170 3-4/11.7.2 In equation for t3, “k1” to read “k4”. 170 3-4/11.7.2 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 171 3-4/11.9.1 In equation for t4, “k1” to read “k4”. 179 3-4/13.1 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 180 3-4/13.3 In definition of p
37、o, reference “3-1/15.11” to read “3-1/3.11”. 182 3-4/13.5 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 184 3-4/13.9 In second equation in definition of fb, “Smfb” to read “Smfy”. 185 3-4/15.3 In equation for t2, “k1” to read “k4”. 186 3-4/15.3 In definition of po, reference “3-1/15
38、.11” to read “3-1/3.11”. 187 3-4/15.5.1 In equation for t2, “k1” to read “k4”. 187 3-4/15.5.1 In definition of po, reference “3-1/15.11” to read “3-1/3.11”. 194 3-4/17.3.3 In Note, reference “5C-8-17/13” to read “5C-8-17/12”. Chapter 3 Structural Design Requirements Section 5 Total Strength Assessme
39、nt 197 3-5/3.7.1 Revise to read “The allowable stresses are applicable to plating and longitudinal stiffeners on watertight boundaries of independent cargo tanks. Application of the allowable stress to rod and beam elements is based on axial stress while von-Mises membrane stresses for quadrilateral
40、 elements are checked.”. 203 3-5/5.3.3 In equations, “fwLT” to read “fuLT”. Chapter 3 Structural Design Requirements Section 7 Design and Analysis of Other Major Hull Structural Features 224 3-7/1 In second paragraph, reference “Section 3-1-3 of the MODU Rules” to read “Section 3-1-4 of the MODU Rul
41、es”. 224 3-7/1 In third paragraph, “FPI Guide” to read “FPI Rules”. (2 places) 231 3-7/11.1 In first and second paragraphs, “FPI Guide” to read “FPI Rules”. (2 places) 231 3-7/11.1 In third and fourth paragraphs, “Facilities Guide” to read “Facilities Rules”. (2 places) Chapter 3 Structural Design R
42、equirements Appendix 1 Guide for Fatigue Strength Assessment 236 3-A1/Table 1 In figure 2b, taper to read “1” and “3”, as follows: E13TAPER2b6 ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Comments Chapter
43、 3 Structural Design Requirements Appendix 1 Guide for Fatigue Strength Assessment 238 3-A1/Table 1 In designation F2, figures 3a and 3b to read “2a” and “2b”, respectively. 250 3-A1/Table 2D In row for wv, FLC6 to read “-0.10”. Chapter 3 Structural Design Requirements Appendix 5 Hull Structural Mod
44、eling and Analysis 300 3-A5/11.5.1 In third paragraph, reference “3-5/11.3.5” to read “3-5/3.11”. 309 3-A5/13.7 In first paragraph, “value required target” to read “target value required”. 316 3-A5/15.7.2 In definition of Mh-peakreference “3-A5/13.3.3” to read “3-A5/15.3.3”. 316 3-A5/15.7.3 Revise e
45、quations to read: iiizendvixynAIMF=)( for vertical bending moment iiiyendhixznAIMF=)( for horizontal bending moment 316 3-A5/15.7.3 In definitions, “Iy” to read “Iz” and “Iz” to read “Iy”, respectively. 317 3-A5/15.7.3 In definitions, “zi” to read “yi” and “yi” to read “zi”, respectively. 317 3-A5/1
46、7.1 In second paragraph, “y degree of freedom” to read “z degree of freedom”. 317 3-A5/17.1 In third paragraph, “z degree of freedom” to read “y degree of freedom”. 318 3-A5/Table 2 In ycolumn, “Mv-end” to read “Mh-end”. (2 places) 318 3-A5/Table 2 In zcolumn, “Mh-end” to read “Mv-end”. (2 places) 3
47、18 3-A5/Table 2 In Note 2, “z” to read “y”. 318 3-A5/Table 2 In Note 3, “y” to read “z”. 320 3-A5/21.3.1 Reference “3-A5/3.3” to read “3-5/3.3”. 321 3-A5/21.5.1 Reference “3-5/11.3” to read “3-5/3.9”. Chapter 4 Surveys Section 1 Surveys During Construction, Installation and Commissioning 329 4-1/5.1
48、 In first paragraph, “FPI Guide” to read “FPI Rules”. Chapter 4 Surveys Section 2 Surveys After Construction and Maintenance of Class 331 4-2/1.1 In second paragraph, reference “1-1-4/9 of the ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1)” to read “1-1-8/3 of the
49、ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1)”. 332 4-2/3.9 Reference “Appendix 7-A-14 “Guide for Survey Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)” to read “Appendix 7-A-14 “Survey Based on Preventative Maintenance Techniques” of the ABS Rules for Survey After Construction (Part 7)”. 332 4-2/3.13 In second paragraph, “FPI Guide” to read “FPI Rules”. 336 4-2/5.1.8 In Item i), “Facilities Guide” to read “Facilities Rules”. ABSGUIDE FOR BUI