ARMY MIL-F-70613-1986 FUZE PD M936 LOADING ASSEMBLING AND PACKING《M936型 PD引信的装载 组装及包装》.pdf

上传人:fatcommittee260 文档编号:444857 上传时间:2018-11-16 格式:PDF 页数:18 大小:594.82KB
下载 相关 举报
ARMY MIL-F-70613-1986 FUZE PD M936 LOADING ASSEMBLING AND PACKING《M936型 PD引信的装载 组装及包装》.pdf_第1页
第1页 / 共18页
ARMY MIL-F-70613-1986 FUZE PD M936 LOADING ASSEMBLING AND PACKING《M936型 PD引信的装载 组装及包装》.pdf_第2页
第2页 / 共18页
ARMY MIL-F-70613-1986 FUZE PD M936 LOADING ASSEMBLING AND PACKING《M936型 PD引信的装载 组装及包装》.pdf_第3页
第3页 / 共18页
ARMY MIL-F-70613-1986 FUZE PD M936 LOADING ASSEMBLING AND PACKING《M936型 PD引信的装载 组装及包装》.pdf_第4页
第4页 / 共18页
ARMY MIL-F-70613-1986 FUZE PD M936 LOADING ASSEMBLING AND PACKING《M936型 PD引信的装载 组装及包装》.pdf_第5页
第5页 / 共18页
亲,该文档总共18页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、s- 37- /9 MIL-F-70613 13 7797706 0356144 O MIL-I?-70613 (AR) 8 DECEMBER 1986 MILITARY SPECIFICATION FUZE, PD, M936 LOADING, ASSEMBLING AND PACKING This Specification is approved for use within the U.S. Army Armament Munitions and Chemical Command, and is available for use by all Departments and Agen

2、cies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements and quality assurance provisions for the loading, assembling and packing of the M936 Point Detonating Fuze. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The foll

3、owing specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited

4、in the solicitation. MILITARY e MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specilfication for MIL-P-60412 - Packaging, Packing and Marking for Shipment of Artillery Type and Rocket Fuzes, General Specification for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and

5、 Tables for MIL-STD-331 - Fuze and Fuze Components, Environmental and Inspection by Attributes Performance Test for - Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improv- ing this document should be addressed to: Commander, US. Army Armame

6、nt, Munitions and Chemical Command, Attn: AMSMC-QA, Dover, New Jersey 07801-5001 by using the self-addressed Standardization Document Improve- ment Proposal (DD Form 1426) appearing at the end of this document or by lefter. - AMSC N/A FSC 1390 DISTRIBUTION STATEMENT A. Approved for public release; d

7、istribution is unlimited. -3 THIS DOCUMENT CONTAINS / 8 PAGES. -=-_ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70633 33 m 7777706 0356345 2 m MIL-F-70613 (AR) 2.1.2 Other Government documents, drawinqs, and publications. The following othe

8、r Government documents, drawings, and publications form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS (See 6.5) US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER ( ARD

9、EC) PRODUCT DRAWINGS 9390425 - Fuze, PD, M936 (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.) the text

10、of this specification and the references cited herein, (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific

11、exemption has been obtained . 2.2 Order of precedence. In the event of a conflict between 3. REQUIREMENTS 3.1 Material. Materials and parts shall be in accordance with applicable drawings and specifications. 3.2 Fuze assembly. The PD, M936 fuze assemblies shall comply with all requirements specified

12、 on drawing (dwg.) 9390425 and with al1 requirements specified in applicable specifications. 3.3 Transportation vibration. The fuze assembly shall comply with the requirements of MIL-STD-33iAI Test 119, Procedure 2, and of 3.4.1 and 3.4.2. 3.4 Ballistic Performance (Provinq Ground) . 3.4.1 Premature

13、 bursts. There shall be no premature bursts or metal parts failure in the mortar or in flight. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b a a MIL-F-70613 (AR) 3.4.2 Functioning. The fuze shall function on impact with the ground (as evidenced

14、 by cartridge high order functioning). 3.4.3 Armins safety. The fuze shall not function on impact against a 1/2 plywood screen positioned at a distance of 100 meters + 1 meter. - 3.5 Lead assembly output test. The lead assembly shall pierce a hole .220“ minimum in diameter in a lead disc (dwg. 88163

15、68). 3.6 Complete fuze leak test. The fuze shall have an air leakage rate no greater than 0.5 psi per 15 seconds. 3.7 First article. When specified in the contract or purchase order,a sample shall be subjected to first article inspection in accordance with the technical provisions herein. (see 4.3 a

16、nd 6.2) 3.8 Workmanship. All parts and.assemblies shall be fabricated in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, rust and other foreign matter. The cleaning methods shall not be injurious to any part, nor shall the parts be contaminated by the cleaning

17、 agent. Exterior surface coatings shall be uniform and continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or pur

18、chase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements speci

19、fied herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Unless otherwise specified herein or i

20、n the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.1.1 Responsibility for compliance. All items must meet all requirements of section 3 and 5. The inspection set forth in this specification shall become a part of the contractors overa

21、ll inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies 3 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-

22、,-,-MIL-F-70613 13 9997906 0356147 b MIL-F-70613 (AR) submitted to the Government for acceptance comply with all requirements of the contract. not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. Samp

23、ling in quality conformance does 4.2 Classification of inspections. The following types of . inspection shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission The contractor shall submitt a first article sample as

24、designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. consist of the following items in sample quantities as indicated. The first article sample shall Part description CUP, Lead Holder , Booster Cupp Booster Lead Assembly Fuze, PD M936 Draw inqs 9234684 9390421

25、 9390422 9234683 9390425 Quantity 10 10 10 50 191 4.3.2 Inspections to be performed. See MIL-A-48 specified herein. 4.3.3 Rejection. See MIL-A-48078(AR) . 78 anc, Table 1 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-F-70613 13 m 9777706 03

26、5bLqB B rl 8 rl E 8 I ! ! - rl N m di u) N NN N N Nm diwmrl di dim di di wm mmmm w di* di di didi wdicyw . . . . . . . . . . . .a 0. *ea. 0. rlcvm . N Nm (v (v NW didicym m mm m m mm mmmm a . a m. .a nn ma vu O O0 O O mm didiN0 rl rnm rl rl rlrl WNrlrl di 7 O nS al pi IdU 5 Provided by IHSNot for Re

27、saleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70bL3 13 m 777770b 035bL47 T MIL-F-70613 (AR) 4.4 Quality conformance inspection 4.4.1 Inspection lot formation. Inspection lots shall comply with the lot formation provisions of MIL-A-48078. In addition, each inspection

28、lot of fuzes shall contain: manufacturer. a. Fuze components of one lot interfix number from one b. Booster pellets of one lot interfix number from one manufacturer. 4.4.2 Examination. See MIL-A-48078. Unless otherwise specified in the Classification of Defects and Test Tables, sampling plans and pr

29、ocedures for major and minor defects shall be in accordance with MIL-STD-105, Inspection Level II. -7 6 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-706L3 13 W 7777906 0356350 6 W 8 t rl a 5 m al d h 9 u rl Cu cy cy . . . - L . .m. 0000000

30、 O00 5 al c -4 W aJ 5 al c z” al tn c m rl W w O al n mrn & QU al o -lJ om rl Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70633 13 7977706 0356353 U k 4 a IR IR $ 4 m m a, d N N -3 * . . . cvNNcvIn Co mmmmm m . . dpdpdpdp dP OOOOh In e* m o

31、 O000 O . . a- * O O N a z c -I w a, 5 O z u i a a 4 c IR 2 E Y LI O 3 8 84 w O al u c: a, m -I w - . 5 ai u u ai -ri a, LI a, 1i O .LJ u O rl a, c u a, IR I rd u d rl m c IR (0 u u (u w ai a N O 3 u c: m c u a, h Y 8 c n m Y - . 8 Provided by IHSNot for ResaleNo reproduction or networking permitted

32、 without license from IHS-,-,-2 I3 u w pi u2 H H w u O O u N E-i H 4 a E 3 LI a, c, v) O O a h 2 U MIL-F-70613 13 7779706 0356152 T W dd mim a,a,a,aJa,a, 55 CVcvcvcvTvcv cvco mmmmmm mm I. dpdpdpdpdpdp dp8 000000 mm ww-Yw-Y-Y Woo 000000 O0 w a, c .li 4-1 a, w a, c O zi a, m rl GI u-l O c Ul 9 Provide

33、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Li a, c, rn O O F9 Li a, a rl O X 4 di cv di di . . . li cvcv(ucJ(v . cvNcv(vcvx) mmmmm mmmmmm dPdPdPdPdP CPdPdPdPdPdP 00000 v)mmmLn diwwcrdc wwwwww 00000 000000 . a a, C -4 w a, a a, z 8 pi -I 10 Provided by

34、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a h rl Q 10 f 2 pi 5 u LI ai c, 10 O !o :a MIL-F-70613 13 m 7777706 0356154 3 W cvcv 03 mm m e. . 6pdp dp O0 In -3-P W O0 O a, cn LI m c u LI a, u O Q CCI LI0 al cic a,ci C 4 a .rl a w LI ai a .l-l o a, 5E c O 2 OH

35、 8 z $E pi .rl .G 10 $ 8 E Ad 3 LI O O pi w O a, u C al a .FI 3 w rl rdl 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Z I3 u w pi cn 0 H w u H 3 O Fr Z O o * z 2 D a 9 t ri n 3.1 rl s II) II) d 4 & a, 4J 11-1 4 5 C Id tn c .rl 2 n u. W m m c ci

36、 pi a, N :Fr L L !7 MIL-F-70bL3 13 m 7777706 0356355 5 m N NNc*lNNW W m mmmmmm m . .e . dp dP&dP&dP dp o 00000 Ln W eWWW-Yn W . .lQ . o 00000- O O c*l 5 a, rl A II) v) Q a .rl & O 3 8 O pi 11-1 O :I 12 . 5 a, 4J u a, -n a, U al a O 4 4J O rl al c 4J a, II) I rd u rl ri Id c II) (D 4J u a, 11-1 al 5

37、a, E 8 n c*l O 3 I3 Y - Id v - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70b33 13 = 777770b 0356356 7 W e Y ai E O u rlb E E *do& 000 nn n O00 ma u rlrlrl YU v OCON coo o 40rl cod rl rl i m o., s E! -II rd u rlrl 4J rl LI 3 hlm Provided b

38、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70613 (AR) . 4.4.3 Inspection equipment. The inspection equipment required to perform the examination and tests prescribed herein is described in the Paragraph Reference/Inspection Method column in the tabl

39、es starting with 4.4.2.1. The contractor shall submit for approval inspection equipment designs in accordance with the-terms of the contract. See Section 6 of MIL-A-48078 and 6.3 of this specification. 4.5 Methods of insaection 4.5.1 Transportation vibration. The test shall be performed on complete

40、fuze assemblies (dwq. 9390425) in the unarmed position set SQ. The test shall be conducted in accordance with the procedures outlined in MIL-STD-331, Test 119, Procedure 2. Upon completion of the test, the fuzes shall not be disassembled but shall be x-rayed to determine if the fuze has armed, becom

41、e unsafe in any way, or has been damaged so as to not function. If so, that condition shall be classed as a test failure, and the ballistic sample shall not be fired. If the x-rays indicate the fuzes safe and operable, then they shall be assembled to 60MM, M302 rounds and fired at Charge O set SQ, a

42、s detailed in 4.5.4. 4.5.2 Lead assembly output test. The test shall be performed on the lead assembly (dwg. 9234683). A fixture shall be used to hold the lead assembly in central contact with the lead disc (dwg. 8816368). A ball (dwg. 8816014) shall be dropped a distance of five (5) inches onto a f

43、iring pin (dwg. 9200012) - distance is measured from the bottom of the ball to the top of the firing pin. The firing pin shall strike and initiate an M98 detonator (dwg. 9243921) which in turn will function the lead assembly. Observation shall be made for compliance with requirements as defined in 3

44、.6. Other suggested, but not mandatory, equipment which could be utilized in conjunction with this Set-up are: holder (dwg. 8816367) , bushing (dwg. 8827829) and base (dwg. 8802085). Government approval, of the test fixture to be used, is required. 4.5.3 Complete fuze leak test. This test shall be p

45、erformed on complete fuzes (dwg. 9390425). A fixture shall be used which covers the entire outer surface of the fuze with as little clearance as possible. The test shall be conducted at ambient temperature using 3 + 0.5 psi. Any sample which exhibits a pressure drop of more than 0.5 psi in 15 second

46、s minimum after stabilization shall be classed defective. A fixed volume of air shall be used so as to detect gross leaks. Equipment shall be as specified in 4.4.3. 14 t Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70613 13 W 7977706 0356158

47、 O a MIL-F-70613 (AR) 4.5.4 Performance test (proving ground ballistic). 4.5.4.1 Functioning test. The sample fuzes shall be assembled to 60mm, M302, series cartridges and fired from an appropriate mortar between 450 and 750 elevation. If any fuze fails to aause the shell to function high order, tha

48、t fuze shall be classified as defective. If any fuze in either SQ or Delay setting mode causes the round to function prematurely, that fuze shall be classified as having critical defect. The proving ground shall utilize a geophonic sensing device to differentiate superquick and delay functionings at maximum charge. 4.5.4.1.1 SQ phase. The sample fuzes shall be divided into two (2) equal groups. The groups shall be fired at Charge O set SQ and maximum charge set SQ. 4.5.4.1.2 Delay phase. The sample fuzes shall be divided into two (2) equal groups. The groups shal

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1