ARMY MIL-F-70807 A (3)-2001 FUZE PD M745 (LESS BOOSTER AND LEAD)《M745型PD引信(较少的助推器和铅)》.pdf

上传人:orderah291 文档编号:444868 上传时间:2018-11-16 格式:PDF 页数:4 大小:20.82KB
下载 相关 举报
ARMY MIL-F-70807 A (3)-2001 FUZE PD M745 (LESS BOOSTER AND LEAD)《M745型PD引信(较少的助推器和铅)》.pdf_第1页
第1页 / 共4页
ARMY MIL-F-70807 A (3)-2001 FUZE PD M745 (LESS BOOSTER AND LEAD)《M745型PD引信(较少的助推器和铅)》.pdf_第2页
第2页 / 共4页
ARMY MIL-F-70807 A (3)-2001 FUZE PD M745 (LESS BOOSTER AND LEAD)《M745型PD引信(较少的助推器和铅)》.pdf_第3页
第3页 / 共4页
ARMY MIL-F-70807 A (3)-2001 FUZE PD M745 (LESS BOOSTER AND LEAD)《M745型PD引信(较少的助推器和铅)》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 MIL-F-70807A (AR) AMENDMENT 328 March 2001 SUPERSEDING AMENDMENT 204 June 1996 MILITARY SPECIFICATION FUZE, PD, M745 (LESS BOOSTER AND LEAD) This amendment forms a part of MIL-F-70807A (AR), dated 25 May 1994, and is approved for use by the U.S. Army Armament Research, Development and Engineering C

2、enter, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 4 3.6.1.5: Delete in its entirety and substitute: “3.6.1.5 Spring, gear latch (destructive, non-arming). With the zigzag body in the forward (up) position, the spring, gear latch shall prevent jackscre

3、w withdrawal with 0.70 + 0.05 psig air pressure applied to the turbine in accordance with 4.5.4.5 for at least three (3) seconds. The S distribution is unlimited. INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70807A AMENDMENT 3 2 P

4、AGE 10 4.4.2.1, Delete in its entirety and substitute: QUALITY CONFORMANCE INSPECTION CLASSIFICATION OF CHARACTERISTICS PARAGRAPH TITLE DRAWING NUMBER 4.4.2.1 Fuze, PD, M745 (Less Booster and Lead) SHEET 1 OF 1 11927103 CONFORMANCE REQUIREMENT NEXT HIGHER ASSEMBLY 11927102 CLASSIFICATION EXAMINATION

5、 OR TEST CRITERIA PARAGRAPH INSPECTION METHOD REFERENCE Critical 1 S To: Level II. PAGE 35 * 4.4.2.25, Delete Minor 202 in its entirety. PAGE 36 4.4.2.26, Major 104: Delete “gage” and substitute “visual”. PAGE 37 4.4.2.27, Major 101: Delete “freon“ and substitute “toluene“. NOTES: Delete “(a) Draw .

6、 greater than .030 inch . between 11.3% and 13.6% .“. and substitute “(a) Draw . greater than .100 inch . between 18.2% and 23.4 % .“. PAGE 38 * 4.4.2.28: Delete Major 102 in its entirety. Major 103, delete “Shoulder diameter” and substitute “Outside shoulder diameter” Minor 204, delete “204 (3 plac

7、es) ” and substitute “ 204 ( 4 places) ” PAGE 39 4.4.2.29, Major 101: Delete “worm drive shaft gap too small” and substitute “depth of worm drive shaft too large”. PAGE 41 * 4.4.2.31, Major 106, delete “106 Primer cage ” and substitute “ 106 Detonator cage ” PAGE 49 * 4.4.2.38, Minor 203, delete “20

8、3 Length from barrier shoulder to rear end ” and substitute “ 203 .795 length ” Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70807A AMENDMENT 3 4 PAGE 50 * 4.4.2.39: Delete Major 107, 109 and 110 in their entirety. Delete Minor 206 in its en

9、tirety. Add Minor 208 as follows: “Minor 208 Height of longer legs (2 places) Level V 3.3 Gage” PAGE 53 4.5.2, Delete in its entirety and substitute the following: “4.5.2 Ballistic test. The fuzes shall be assembled to 60mm, HE, M720, 60mm, WP, M722, 120mm, WP, M929, 120mm, HE, M933 cartridges or 12

10、0mm, HE, M57 as appropriate and available. The rounds shall be fired as soon as practical after removal from the conditioning chamber. The round shall be fired from a 60mm, Light Weight Company Mortar System (LWCMS), M224 mortar or a 120mm, M121 Carrier mounted mortar (a 120mm M120 towed mortar (gro

11、und mount) may be used with prior approval from the Government) at appropriate quadrant elevation (QE) and charges.” The margin of this amendment are marked with an asterisk or vertical line to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were

12、 made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Preparing activity: Army-AR Army-AR (Project 1390-0883) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1