1、I t MIL-L-43582B AMENDMENT 1 26 Septembsr 1989 MILITARY SPECIFICATION LINER, SHIRT, CHEMICAL PROTECTIVE This amendment forms a part of Military Specification MIL-L-43582B, dated 19 June 1981, and is approved for fise by all Departments and Agencies of the Department of Defense. PAGE 1 2.1, lines 1,
2、2, 3: Delete and substitute: “2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. The following specifi- cations, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in
3、the issue of the Department of Defense index of Specifications arid Standards (DODISS) and supplement thereto, cited in the solicitation (see 6,2).“ PAGE 2 %a 2.1 under “SPECIFICATIONS FEDERAL“: Delete “U-P-268 - Paper, Kraft, Wrapping“ and add “A-A-203 - Paper, Kraft, Untreated“. Under “SPECIFICATI
4、ONS MILITARY“: Add “MIL-L-35078 - Loads Unit: Preparation of Semiperishable Subsistence Items; Clothing, Personal Equipment and Equipage; General Specification For“ and “MIL-T-43548 - Thread, Polyester Core: Cotton-, Rayon-, or Polyester Covered“. Under “STANDARDS MILITARY“: Add MIL-STD-147 - Pallet
5、ized Unit Loads“ and “MIL-STD-731 - Quality of Wood Members for Containers and Pallets“. Delete “MIL-STD-1188 - Commercial Packaging of Supplies and Equipment“. AMSC N/A 1 of 6 FSC 8415 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo
6、reproduction or networking permitted without license from IHS-,-,-MIL-L-43582B AMENDMENT 1 PAGE 2 (contd) Delete source paragraph and substitute: “(Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from the Naval Publications and Forms
7、Center, (ATTN: NPODS), 5801 Tabor Avenue, Philadelphia, PA i9120-5099. )I Add the following new paragraphs: “2.2 Non-Government publications. The following document forms a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD ado
8、pted are those listed in the issue of the DODISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of the documents cited in the solicitation (see 6.2). AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) D 3951 - Standard Practice f
9、or Commercial Packaging (Application for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103,) .3 (Non-Government standards and other publications are normally available from the organizations that prepare or distribute the documents
10、. These documents also may be available in or through libraries or other informational services.)“ 2.3 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, sup
11、ersedes applicable laws and regulations unless a specific exemption has been obtained.“ PAGE 3 3.2.2.3: Delete and substitute: “3.2.2.3 Matching. The color of the finished cloth shall match the standard sample when viewed under filtered tungsten lamps that approximate artificial daylight and that ha
12、ve a correlated color temperature of 7500 + 200 Ky with illumination of 100 + 20 foot candles, and shall be a good match to the standard sample under incandescent lamplight at 2300 - + 200 K.“ 3.2.3, at the end of paragraph: Add “AS an alternate, the thread shall be cotton or polyester covered polye
13、ster core, Olive Drab S-1, C.A. 66022, 50,2 or 3 ply, (for cotton ticket number 30) and 70, 2 or 3 ply (for cotton ticket number 50) conforming to MIL-T-43548. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-43582B AMENDMENT 1 PAGE 7 Table I,
14、 operation 1: Add “c. Cut sufficient cuff material so that the finished cuff will be 6 plus or minus 1/4 inches in length once it has been folded double thickness and stitched to the sleeve.“ PAGE 9 Table I, operation 7a, in needle and bobbin columns for stitch type 401: Delete “50-3, 30-3“ and subs
15、titute “30-3, 50-3“. PAGE 10 Table I, operation 8a: Delete and substitute “a. Fold cuff to double thickness II PAGE 14 Table II: Delete all back lengths and sleeve lengths and substitute those shown below: Back length 2/ Sleeve length 3/ - “28 5/8 24 1/2 30 5/8 24 1/2 31 5/8 24 1/2 32 1/8 24 1/2 32
16、1/8 24 1/2“ Under “Tolerances“: Add “Finished cuff length for all sizes is 6 plus or minus 1/4 inches. - 4/11 Add “4/ Cuff length - taken on the outside of liner from sleeve seam to bottom f cuff .It PAGE 15 4.3.1, line 11: After “Sample size“ add “(sample units)“ PAGE 16 4.3.2, line 2: Delete “one
17、liner“ and substitute “liners“. PAGE 20 4.3.2.1, under “Shoulder, armhole, underarm and side and sleeve seam“ defects a, b, and c: Delete “on“ in each defect and substitute “over“. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-L-43582B (1) 8
18、4 W 7999706 037477b 4 I MIL- L-4358 2B AMENDMENT 1 , PAGE 22 4.4: Delete and substitute: “4.3.3 Packaging examination. The fully packaged end items shall be examined for the defects listed below. The lot size shall be expressed in units of shipping containers. The sample unit shall be one shipping c
19、ontainer fully packaged. The inspection level shall be S-2 and the AQL, expressed in terms of defects per hundred units, shall be 2.5. Examine - Defect Marking (exterior Omitted; incorrect; illegible; of improper size, and interior) location, sequence, or method of application Materials Any componen
20、t missing, damaged, or not as specified Workmanship Inadequate application of components, such as: incomplete sealing or closure of flap, improper taping, loose strapping, or inadequate stapling Bulged or distorted container Improperly folded liners, inadequately tied bundles, contents improperly co
21、vered with paper Number per container is more or less than required incorrect; illegible; of improper size, location, sequence, or method of application“ 5 1: Delete “-packaging“. 5.1.2: Delete “MIL-STD-1188“ and substitute “ASTM D 3951“. PAGE 23 5.2.1, line 10: Delete type I, grade B of Vu-P-268“ a
22、nd substitute “A-A-203“. Delete the last sentence and substitute “Shipping container shall be arranged in unit loads in accordance with MIL-L-35078 for the type and class of load specified (see 6.2). When unit loads are strapped, strapping shall be limited to nonmetallic strapping, except for type I
23、I, class F loads.“ 5.2.2, line 3: Delete “200“ and substitute “275“. Lines 10 and 11: Delete “type I, grade B of Vu-P-268“ and substitute “A-A-203“. Delete the last sentence. 5.2.3, line 2: Delete “MIL-STD-1188“ and substitute “ASTM D 3951“. 5.3 and 5.3.1: Delete and substitute: “5.3 Palletization.
24、When specified (see 6.2), liners, packed as specified in 5.2.2 or 5.2.3, shall be palletized on a 4-way entry pallet in accordance with , load type Ia of MIL-STD-147. Pallet type shall be type I (4-way entry), type IV or type V in accordance with MIL-STD-147. Pallets shall be fabricated from wood gr
25、oups I, II, III, or IV of MIL-STD-731. Each prepared load shall be bonded 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-43582B AMENDMENT 1 PAGE 23 (contd) with primary and secondary straps in accordance with bonding means C and D or film bo
26、nding means F or G. with the appendix of MIL-STD-147. Interlocking of loads shall be effected by reversing the pattern of each course. Pallet pattern shall be number 3 in accordance 5.4 Marking. In addition to any special marking required by the contract or purchase order, unit packs, shipping conta
27、iners, and palletized unit loads shall be marked in accordance with MIL-STD-129 or ASTM D 3951, as applicable.“ PAGE 24 6.2: Add the following new subparagraphs “(e) Issue of DODISS to be cited in the solicitation, and if required, the specific issue of individual documents referenced (see 2.1.1 and
28、 2.2). (f) (g) Type and class of unit load (see 5.2.1). When palletization is required (see 5.31.“ Add the following new paragraph: “6.6 Subject term (key word) listing. C lo thing inn e r we a r If Cus todians : Army - GL Navy - NU Preparing activity: Army - GL (Project 8415-0677) Review activities: Army - MD Navy - MC DLA - CT User activities: Navy - OS, CG 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-