ARMY MIL-P-48450 A (1)-1979 PERISCOPE TANK M35E1《M35E1式坦克潜望镜》.pdf

上传人:feelhesitate105 文档编号:446391 上传时间:2018-11-16 格式:PDF 页数:3 大小:124.77KB
下载 相关 举报
ARMY MIL-P-48450 A (1)-1979 PERISCOPE TANK M35E1《M35E1式坦克潜望镜》.pdf_第1页
第1页 / 共3页
ARMY MIL-P-48450 A (1)-1979 PERISCOPE TANK M35E1《M35E1式坦克潜望镜》.pdf_第2页
第2页 / 共3页
ARMY MIL-P-48450 A (1)-1979 PERISCOPE TANK M35E1《M35E1式坦克潜望镜》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-P-48950A (1) 12 7777706 0320534 3 W MILITARY SPECIFICATION PERISCOPE, TANK: M35E1 MIL-P-48450A( AR) AMENDMENT 1 15 October 1979 This amendment forms a part of Military Specification MIL-P-48450A(MU) dated 15 March 1976. PAGE 3 Paragraph 3.4.3.1 - Delete and substitute: “3.4.3.1 Vibration “A“. Th

2、is requirement shall be met with the image intensifier tube and reticle projector lamp energized by the application of +24 + 6.0 VDC to Contact 11733497 (Reference Drawing 11733401). interface of the periscope and mount. Vibration shall be applied along each of three mutually perpendicular axes of t

3、he periscope. vibration shall be shall be sinusoidal as follows: The vibration input to the periscope shall be at the The 10%. linearly from .5 G to 1.5 GIs - + 10%. acceleration of 1.5 GIs - + 10%. acceleration of 1.5 GIs - + 10%. linearly from 1.5 GIs to .5 G - + 10%. b. During a frequency sweep o

4、f 5 to 9 Hz, increase c. During a frequency sweep of 9 to 500 Hz, mainta d. During a frequency sweep of 500 to 9 Hz, mainta During a frequency sweep of 9 to 5 Hz, decrease At 5 Hz, the acceleration shall be .5 G - + 10%. e. f. a. A frequency of 5 Hertz(Hz), the acceleration shall be .5 G - + acceler

5、ation n constant n constant acceleration The frequency of applied vibration shall be swept logarithmically in 15 minute + 1 minute sweep cycles for a total of two hours per axis . There shalT be no failure or flicker of light emission from the image intensifier tube nor he reticle projector lamp dur

6、ing vibration and the periscope shall show no evidence of physical failure subsequent to vibration. Following the vibration test the persicope shall m*eet the requirements of 3.6.3.2, 3.6.4.1, 3.6.9, 3.6.2, 3.6.3.1, 3.6.3.1.1, 3:6.3,1.2; 3.6.5, 3.6.6, 3.6.6.1, 3.6.7, 3.6.8, 3.2, 3.1, 3.5 and then ea

7、ch module (see 3.1) shall meet their own respective post-vibration test requirements .I FSC 1240 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-4V50A (1) 12 W 7977706 0320535 O 9 MIL - P - 4E45D3 ( AR ) AMENDMENT 1 Paragraph 3.4.3.2 - Delete a

8、nd substitute: Vibration llBl - This requirement shall be met with the image intensifier tube and reticle projector lamp energized by the application of +24 + 6.0 VDC to Contact 11733497 (Reference Drawing 11733401). The vibration input to the periscope shall be at the interface of the periscope and

9、 mount. Vibration shall be applied along each of three mutually perpendicular axes of the periscope. vibration shall be sinusoidal as follows: “3.4.3.2 The a. b. At a frequency of 5 Hertz(Hz), the acceleration shall be 1.0 G During a frequency sweep of 5 to 500 Hz, maintain constant - + 10%. acceler

10、ation of 1.0 G - + 10%. c. d. During a frequency sweep of 500 to 5 Hz, maintain constant At 5 Hz, acceleration shall be 1.0 G - + 10%. acceleration of 1.0 G - + 10%. The frequency of applied vibration shall be swept logarithmically in 15 minute + 1 minute sweep cycles for a total of 15 minutes + 1 m

11、inute along each-of the three mutually perpendicular axes (total vTbration time 45 minutes + 3 minutes). There shall be no failure or flicker of light emission from the image intensifier tube nor the reticle projector lamp during vibration and the periscope shall show no evidence of physical failure

12、 subsequent to vibration. Following the vibration test the periscope shall meet the requirements of 3.6.3.2, 3.6.4.1, 3.6.9, 3.6.2, 3.6.3.1, 3.6.1.1, 3.6.3.1.2, 3.6.5, 3.6.6, 3.6.6.1, 3.6.7, 3.6.8, 3.2, 3.1, 3.5 and then each module (see 3.1) shall meet their own respecti ve post-vi brati on test re

13、qui rements“ . PAGE 4 Paragraph 3.4.3.3 - Delete and substitute: intensifier tubend reticle projector lamp energized by the application of +24 + 6.0 VDC to Contact 11733497 (Reference Drawing 11733401). of the periscope and mount. The periscope shall be subjected to 24 cumulative shocks consisting o

14、f three each at 35 GIs 5 lo%, then 20 GIs - + 10% applied in each direction along each of the two mutually perpendidular horizontal axes (all four sides). The shock pulse shall have a half sine wave with a time duration of 3 + .2 milliseconds. The periscope shall also be subjected to six cumlative s

15、hocks consisting of three each at 35 GIs + lo%, then 20 GIs + 10% applied in one direction along the vertical axTs (normal operating position of “3.4.3.3 Shock. This requirement shall be met with the image The shock input to the periscope shall be at the interface Page 2 of 3 Provided by IHSNot for

16、ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48450A(AR) AMENDMENT I the periscope only). a time duration of 18 + 3 milliseconds. shall be no failure or-flicker of light emission from the image tube nor the reticle projector lamp. evidence of physical failure. Foll

17、owing the shock test, the periscope shall meet the requirements o 3.6.3.2, 3.6.4.1, 3.6.9, 3.6.2, 3.6.3.1, 3.6.3.1.1, 3.6.3.1.2, 3.6.5, 3.6.6, 3.6.5.1, 3.6.7, 3.6.8, 3.2, 3.1, 3.5 and then each module (see 3.1) shall meet their own respective post-shock test requi rements.lI The shock pulse shall ha

18、ve a half sine wave with Subsequent to shock, there The periscope shall also show no PAGE 5 Paragraph 3.6.l.a, Line 1 - Delete ltfour“ and substitute “three“. PAGE 6 Paragraph 3.6.3.1.1, Line 3 - Delete “0.2 mil“ and substitute l1JO mil“ Custodian: Arm.y-AR Page 3 of 3 Preparing Activit.y: Army - AR Project No. 1240-A735 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • API RP 10B-3-2016 Testing of Well Cements Used in Deepwater Well Construction (SECOND EDITION) .pdf API RP 10B-3-2016 Testing of Well Cements Used in Deepwater Well Construction (SECOND EDITION) .pdf
  • API RP 10B-4-2015 Preparation and Testing of Foamed Cement Formulations at Atmospheric Pressure (Second Edition) .pdf API RP 10B-4-2015 Preparation and Testing of Foamed Cement Formulations at Atmospheric Pressure (Second Edition) .pdf
  • API RP 10B-5-2005 Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formulations at Atmospheric Pressure (First Edition)《常压下水泥配方中的收缩与扩张测定推荐作法.第1版.ISO .pdf API RP 10B-5-2005 Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formulations at Atmospheric Pressure (First Edition)《常压下水泥配方中的收缩与扩张测定推荐作法.第1版.ISO .pdf
  • API RP 10B-6-2010 Recommended Practice on Determining the Static Gel Strength of Cement Formulations (First Edition)《测定水泥配方设计的静态胶凝强度的推荐规范.第1版.ISO 10426-6-2008采用》.pdf API RP 10B-6-2010 Recommended Practice on Determining the Static Gel Strength of Cement Formulations (First Edition)《测定水泥配方设计的静态胶凝强度的推荐规范.第1版.ISO 10426-6-2008采用》.pdf
  • API RP 10D-2-2004 Recommended Practice for Centralizer Placement and Stop-collar Testing (First Edition)《弓形弹簧铸塑中心化子的规范 第1版.ISO 10427-2通过》.pdf API RP 10D-2-2004 Recommended Practice for Centralizer Placement and Stop-collar Testing (First Edition)《弓形弹簧铸塑中心化子的规范 第1版.ISO 10427-2通过》.pdf
  • API RP 10F-2002 Recommended Practice for Performance Testing of Cementing Float Equipment (Third Edition ERTA September 2003)《固井浮式设备的性能检测.第3版.ANSI API 10F ISO 18165-2001 ISO 18165 .pdf API RP 10F-2002 Recommended Practice for Performance Testing of Cementing Float Equipment (Third Edition ERTA September 2003)《固井浮式设备的性能检测.第3版.ANSI API 10F ISO 18165-2001 ISO 18165 .pdf
  • API RP 1102-2007 Steel Pipelines Crossing Railroads and Highways (SEVENTH EDITION ERTA 1 NOVEMBER 2008 ERTA 2 MAY 2010 ERTA 3 SEPTEMBER 2012 ERTA 4 FEBRUARY 2014 ERTA 5 MARCH 2014).pdf API RP 1102-2007 Steel Pipelines Crossing Railroads and Highways (SEVENTH EDITION ERTA 1 NOVEMBER 2008 ERTA 2 MAY 2010 ERTA 3 SEPTEMBER 2012 ERTA 4 FEBRUARY 2014 ERTA 5 MARCH 2014).pdf
  • API RP 1109-2010 Marking Liquid Petroleum Pipeline Facilities (Fourth Edition Erta November 2010)《标注液化石油管道设备.第4版》.pdf API RP 1109-2010 Marking Liquid Petroleum Pipeline Facilities (Fourth Edition Erta November 2010)《标注液化石油管道设备.第4版》.pdf
  • API RP 1109-2017 Line Markers and Signage for Hazardous Liquid Pipelines and Facilities (Fifth Edition) .pdf API RP 1109-2017 Line Markers and Signage for Hazardous Liquid Pipelines and Facilities (Fifth Edition) .pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1