ARMY MIL-P-60295 C (2)-1998 PROJECTILE 20MM HEI M56A4 METAL PARTS《M56A4式20 mm高爆燃烧弹(HEI)弹丸用金属部件》.pdf

上传人:terrorscript155 文档编号:446620 上传时间:2018-11-16 格式:PDF 页数:3 大小:78.43KB
下载 相关 举报
ARMY MIL-P-60295 C (2)-1998 PROJECTILE 20MM HEI M56A4 METAL PARTS《M56A4式20 mm高爆燃烧弹(HEI)弹丸用金属部件》.pdf_第1页
第1页 / 共3页
ARMY MIL-P-60295 C (2)-1998 PROJECTILE 20MM HEI M56A4 METAL PARTS《M56A4式20 mm高爆燃烧弹(HEI)弹丸用金属部件》.pdf_第2页
第2页 / 共3页
ARMY MIL-P-60295 C (2)-1998 PROJECTILE 20MM HEI M56A4 METAL PARTS《M56A4式20 mm高爆燃烧弹(HEI)弹丸用金属部件》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 NIL-P-bO295C (2) 06 20827bO lb5 E I INCH-POUND I MIL-P-60295C AMENDMENT 2 31 July 1998 SUPERSEDING AMENDMENT 1 31 July 1991 MILITARY SPECIFICATION PROJECTILE, 20MM, HEI, M56A4; METAL PARTS This amendment forms a part of MIL-P-60295C, dated 5 December 1983, and is approved for use by all Departments

2、 and Agencies of the Department of Defense. PAGE 3 2.1.2, Under Inspection Equipment Drawings: Add “11075245 - Standard for Eddy Current Flaw Detector“. PAGE 7 4.3, TABLE I, Make the following changes: After Laminar. metallic structure: Add “l/“. - Add to NOTES: Il/ May be performed.on Body and Rota

3、ting Band Assembly, (Uncoated) . I PAGE 11 4.4.2.2, Make the following changes: CRITICAL l., After Laminar metallic structure: Add “3/“. - Add to NOTES: “3/ May be performed on Body and Rotating Band Assembly, (Uncoated) . AMSC N/A 1 of 3 FSC 1305 DISTRIBUTION STATEMENT A. Approved for public releas

4、e; distribution is unlimited. Licensed by Information Handling Services IIL-P-bO295C (2) 99999Ob 20827bL UT1 MIL-P-60295C AMENDMENT 2 PAGE 13 4.4.2.3, Make the following changes: Major 118, Under Paragraph Reference/Inspection Method Column Delete: Visual/“ and “5/“. - NOTE 5/, Delete in its entiret

5、y and substitute “s/ - Measurement of mouth-ogive break shall apply where visual inspection indicates that the maximum dimension is borderline. I. PAGE 16 4.4.2.5, Make the following changes: Minor 204: Delete in its entirety. Add: Major 105, “Paint on threads, .25, 3.2, Visual“. PAGE 21 * 4.5.10, A

6、dd the following: “Customers, through the procuring activity, may modify this requirement and base acceptance on firing bursts of 50 shots in a M61 gun.“ PAGE 22 6.6.1, Delete in its entirety and substitute the following: “6.6.1 Defect standard for eddy current testing. contractor shall be responsib

7、le for the procurement, The manufacture, and maintenance of eddy current equipment and the front slot, rear slot, phase set, and three slot standards IAW the latest drawings called out in the applicable technical data package and the contract. production check E.C. standards (PCS No. 1) Dwg. 1107524

8、5 shall be furnished by the contractor to the Government agency having contract administration responsibility.“ The 2 Licensed by Information Handling ServicesMIL-P-bO295C (2) D 999990b 2082762 T38 - MIL-P-60295C AMENDMENT 2 The margins of this amendment are marked with an asterisk or vertical lines

9、 to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR Review activities: Air Force-99 Preparing activity: Army-AR (Project 1305-0201) 3 Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1