1、 Comments, suggestions, or questions on this document should be addressed to U.S. Army RDECOM, Tank Automotive Research, Development and Engineering Center, ATTN: RDTA-EN/STND/TRANS MS #268, 6501 E. 11 Mile Road, Warren, MI 48397-5000 or emailed to DAMI_STANDARDIZATIONconus.army.mil. Since contact i
2、nformation can change, you may want to verify the currency of this address information using the ASSIST Online database at https:/assist.daps.dla.mil. AMSC N/A FSC 2920 INCH-POUND MIL-PRF-62122E 11 January 2011 SUPERSEDING MIL-PRF-62122D 17 July 1997 PERFORMANCE SPECIFICATION CABLE ASSEMBLY, INTER-V
3、EHICLE POWER: PLUG, RECEPTACLE, AND ADAPTER This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers cable assemblies, plugs, receptacles and adapters used for a temporary connection between electrical systems
4、of two vehicles for the purpose of starting the main engine of a disabled vehicle from an operating vehicle. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other se
5、ctions of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4, or 5 of this specification
6、, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in
7、 the solicitation or contract (see 6.2). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-62122E 2 DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-PRF-2104 - Lubricating Oil, Internal Combustion Engine, Combat/Tactical Service MIL-PRF-46167 - Lubrica
8、ting Oil, Internal Combustion Engine, Arctic DEPARTMENT OF DEFENSE STANDARDS MIL-STD-810 - Environmental Test Methods and Engineering Guidelines (Copies of these documents are available from https:/assist.daps.dla.mil/quicksearch/ or from the Standardization Document Order Desk, 700 Robbins Avenue,
9、Building 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are tho
10、se cited in the solicitation or contract (see 6.2). U.S. ARMY TACOM DRAWINGS 11674728 - Vehicle Receptacle Assembly Installation Drawing (NATO STANAG 4074) (Interface) 11677570 - Adapter, Connector (Interface) 11682336 - Cable and (b) other discarded material, including solid, liquid, semisolid, or
11、contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities. It does not include solid or dissolved material in domestic sewage, or solid or dissolved material in irrigation returns flows or industrial discharges which are poin
12、t sources subject to permits under section 402 of the Clean Water Act, (33 U.S.C. 1342 et seq.), or source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.). (Source: Federal Acquisition Regulations, section 23.402). 6.4 International standa
13、rdization agreement. Certain dimensions on plug and receptacle Drawings 11682338, 11682345 and 11682350 are the subject of international standardization agreement, the NATO STANAG 4074. When amendment, revision or cancellation of this Provided by IHSNot for ResaleNo reproduction or networking permit
14、ted without license from IHS-,-,-MIL-PRF-62122E 22 specification is proposed which will modify the international agreement concerned, the preparing activity will take appropriate action through international standardization channels including departmental standardization offices to change the agreem
15、ent or make other appropriate accommodations. 6.5 Subject term (key word) listing. Clamp Jumper Mating Starting 6.6 Changes from previous issue. The margins of this specification are marked with vertical lines to indicate where changes from the previous issue were made. This was done as a convenienc
16、e only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue. Custo
17、dian: Preparing Activity: Army - AT Army - AT Review Activities: (Project 2920-2011-001) Army - CR4 DLA - CC NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-