ARMY MIL-S-63523 A-1985 SIMULATOR LAUNCHING ANTI-TANK GUIDED MISSILE AND ROCKET M22 PERFORMANCE SPECIFICATION FOR《M22型反坦克导弹和火箭发射模拟器的规格》.pdf

上传人:testyield361 文档编号:448230 上传时间:2018-11-16 格式:PDF 页数:22 大小:903.43KB
下载 相关 举报
ARMY MIL-S-63523 A-1985 SIMULATOR LAUNCHING ANTI-TANK GUIDED MISSILE AND ROCKET M22 PERFORMANCE SPECIFICATION FOR《M22型反坦克导弹和火箭发射模拟器的规格》.pdf_第1页
第1页 / 共22页
ARMY MIL-S-63523 A-1985 SIMULATOR LAUNCHING ANTI-TANK GUIDED MISSILE AND ROCKET M22 PERFORMANCE SPECIFICATION FOR《M22型反坦克导弹和火箭发射模拟器的规格》.pdf_第2页
第2页 / 共22页
ARMY MIL-S-63523 A-1985 SIMULATOR LAUNCHING ANTI-TANK GUIDED MISSILE AND ROCKET M22 PERFORMANCE SPECIFICATION FOR《M22型反坦克导弹和火箭发射模拟器的规格》.pdf_第3页
第3页 / 共22页
ARMY MIL-S-63523 A-1985 SIMULATOR LAUNCHING ANTI-TANK GUIDED MISSILE AND ROCKET M22 PERFORMANCE SPECIFICATION FOR《M22型反坦克导弹和火箭发射模拟器的规格》.pdf_第4页
第4页 / 共22页
ARMY MIL-S-63523 A-1985 SIMULATOR LAUNCHING ANTI-TANK GUIDED MISSILE AND ROCKET M22 PERFORMANCE SPECIFICATION FOR《M22型反坦克导弹和火箭发射模拟器的规格》.pdf_第5页
第5页 / 共22页
亲,该文档总共22页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Army Armament Research and Development Center, Attn: AMSMC-QA, Dover, New Jersey 07801-5001 bj using the self-addressed Standardiz

2、ation Document Improvement MIL-S-63523A 33 7797706 O353738 Lt Z 5-37-67 MIL-S-63523A (AR) 20 SEPTEMBER i985 SUPERSEDING MIL-S-6 3523 15 July 1982 MILITARY SPEC1 FICATION SIMULATOR , LAUNCHING, ANTI-TANK , GUIDED MISSILE AND ROCKET, M22 PERFORMANCE SPECIFICATION FOR This specification is approved for

3、 use by the US Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE r 1.1 Scope. This specification covers requirements for design and establishes a uniform method of testing one type of Simulator, Launching, A

4、nti-Tank, Guided Missile and Rocket, M22. The purpose of the M22 Simulator testing program is to determine performance, safety, soundness of mechanical design and resistance to environments encountered during storage, handling, and service use. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1

5、 Specifications and standards. Unless otherwise specified (see 6.2), the following specifications and standards of the issue listed in that issue of-the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the extent

6、 specified herein. SPEC I F ICAT I ONS MILITARY MIL-P-116 - Preservation - Packaging, Methods Of. DOD-D-1000 - Drawing, Engineering and Associated List, MIL-A-2550 - Ammunition and Special Weapons; General Specification For. MIL-A-48 078 - Ammunition, Standard Quality Assurance Provisions, General S

7、pecification For . FSC 1370 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. r THIS DOCUMENT CONTAINS a Hot 51.5 + 3OC, 125 + 5OF; Cold minus 32 + 3oc, minus 25 + 5OF). following requirements after conditioning at specified temperature. The assembly Shall function an

8、d co%ply with the 3.5.1.1 Sound characteristics. The sound level intensity of the cartridge functioning at a distance of 64 + 1.0 feet (ft.) from the simulator assembly shall be 134 +6 - 7 decibles (db), when tested as specified in 4.5.3.1. 3.5.1.2 Functioning time. The time from application of nine

9、 plus or minus one (9 5 1) volts direct current (WC), with no current limitations, to audible report of the assembly shall not be greater than 0.110 seconds when tested as specified in 4.5.3.2. 3.5.1.3 Flash characteristics. The Simulator shall produce a visible flash or luminous plume when fired fr

10、om a launch tube. This flash shall be a minimum (min) of six (6) feet in length, two (2) feet in width in winds of not more than 8 miles per hour. Residual smoke shall be white in appearance. The simulator shall meet the performance requirements when tested per para. 4.5.3.3. 3.6 Environmental condi

11、tions. 3.6.1 Vibration. The simulators, when packaged shall not fire when subjected to vibration as specified in 4.5.8.1. After subjection to such vibration (and additional testing as indicated for First Article Tests), the devices shall show no signs of damage, shall be safe to handle and fire, and

12、 shall meet the performance requirements when test fired as specified in para. 4.5.8.1. 3.6.2 Shock. The simulators, when packaged shall not fire when subjected to shocks as specified in 4.5.8.4. After subjection to such shocks (and additional testing as indicated for First Article Tests, or Quality

13、 Conformance Inspection), the devices shall show no signs of damage, shall be safe to handle and fire, and shall meet the performance requirements when test fired as specified in para. 4.5.8.4. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I -_-

14、MIL-S-b3523A 13 W 77777Ob 0351793 I MIL-S-63 523A (AR) 3.6.3 Seven-foot drop. The simulators, when packaged shall not fire when subjected to drops from a height of seven feet as specified in 4.5.8.6. After being subjected to such drops (and additional testing as indicated for First Article Tests), t

15、he devices shall show no signs of damage, shall be safe to handle and fire, and shall meet the performance requirements when test fired as specified in para. 4.5.8.6. 3.6.4 Loose carqo transport. The simulators, when packaged shall not fire when subjected to loose cargo transport as specified in 4.5

16、.8.8. After being subjected to the loose cargo transport (and additional testing as indicated for First Article Tests, or Quality Conformance Inspection), the devices shall show no signs of damage, shall be safe to.handle and fire, and shall meet the performance requirements when test fired as speci

17、fied in para. 4.5.8.8. 3.6.5 Five-foot drop. The unpackaged simulators shall not fire when dropped from a height of five feet as specified in 4.5.8.5. After being subjected to such a drop (and additional testing as indicated for First Article Tests or Quality Conformance Inspection), the devices sha

18、ll be safe to handle and fire, and shall meet the performance requirements when test fired. 3.6.6 Forty-foot drop. The simulators, when packaged shall not fire when dropped from a height of forty feet as specified in 4.5.8.7 and shall be safe to handle and dispose of. 3.6.7 Low temperature. The simu

19、lators shall be capable of withstanding low temperature conditions as specified in 4.5.8.2 and shall meet the performance requirements when test fired. 3.6.8 High temperature. The simulators shall be capable of withstanding high temperature conditions as specified in 4.5.8.3 and shall meet the perfo

20、rmance requirements when test fired. 3.6.9 Leakaqe test. The simulators, when packaged shall be capable of withstanding exposure to the leakage test as specified in 4.5.6. Leakage shall constitute a failure. 3.6.10 Leak test. The Simulator shall not leak when tested as specified in 4.5.7. Leakage sh

21、all constitute a failure. 3.6.11 Jumble. The simulator shall comply with the following requirements when tested as specified in 4.5.5. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i MIL-S-63523A 13 7779706 0351744 T - - MIL-S-63523A (AR) 3.6.11.

22、1 The simulator shall not function during test. 3.6.11.2 There shall be no powder leakage. 3.6.11.3 The simulator components shall not separate during test. 3.6.12 Temperature-humidity. The packaged simulator shall withstand exposure to temperature-humidity cycle as specified in 4.5.8.9 and shall me

23、et the performance requirements when test fired as specified in para. 4.5.8.9. 3.6.13 Temperature cycling. The simulator shall be subjected to the temperature cycling as specified in 4.5.8.10 and shall meet the performance requirements when test fired as specified in para. # 4.5.8.10. 3.7 Workmanshi

24、p. All parts and assemblies shall be fabricated ” and finished in a thorough, workmanlike manner. They shall be free of burrs, chips, sharp edges, cracks, crazes, porosity, warpage, burn marks, blisters, excess flash, scratches, dirt, grease and other defects and foreign matter which would affect ap

25、pearance or serviceability. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat, legible and sharply defined. All packing components shall be dry. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility

26、 for inspection and standard quality assurance provisions. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the supplier m

27、ay utilize his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessar

28、y to assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein, the provisions of MIL-A-2550 shall apply. 4.1.1 Materials. Inspection and testing of component parts and assemblies shall be made to determine compliance with 3.3

29、 and 3.4. If material defects, incompatability, or inferior quality is evident, and the Government deems material analysis necessary, the contractor will be requested to submit samples or specimens to the cognizant design agency for analysis and approval. 7 Provided by IHSNot for ResaleNo reproducti

30、on or networking permitted without license from IHS-,-,-MIL-S-63523A 33 m 7797706 0353745 I m 4.2 Classification-of tests. The following types of inspection shall be performed on this item: a. First Article Inspection b. Quality Conformance Inspection 4.3 First article inspection. 4.3.1 Submission.

31、The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of Table I. components and test specimens may be subjected by the Government to any or all of the examinations and tests specified in this specification. 4.3.2 Ins

32、pections to be performed. First article assemblies, 4.3.3 Rejection. 1 a. If an assembly, component or test specimen fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to termi.nate its inspection upon any failure of

33、 an assembly, component, or test specimen in the sample to comply with any of the stated requirements. accept/reject criteria for each specified environment. b. Each Environment Tests samples shall pass the c. The sum of all samples test fired (13 test for a total of 900 samples) shall pass an accep

34、t/reject criteria of 900-30-31. d. A simulator is classified a functional failure if it fails any of the requirements of Para. 3.5.1. 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-63523A 13 W 7977706 035L7L16 3 I- e I a e h w 4 4 v m N m M

35、w I cn I E E M 8 rl B - E- = x gti zz E 2 r Y E W U 4 a dN r-t d d nlni m m mm a . . e. m w d d ww *e . . e *e dN rl d N Ncv wd m 0 m m m M mm .e . . . .a . . e e. h Fi d ul QI d F Yi Fi Cn 3 . n u al followed by the same at cold temperature (six per orientation, total of 30 items). During Quality C

36、onformance Inspection, one (1) item shall be dropped once for each orientation (total 5 items per orientation). Observation shall be made for compliance with requirement 3.6.5. 17 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-S-63523A 13 99999

37、060352755 Lt MIL-S-63523A (AR) a. Bottom down. b. Top down. c. Side down. d. Bottom down at 45O angle. e. Top down at 45O angle. 4.5.8.6 Seven foot drop. The packaged simulators shall be dropped from a height of 7 feet (measured to the bottom of the package) on to a 2-inch thick steel plate embedded

38、 in concrete in the orientations below: a. One drop on side and one drop on end; at hot temperature. b. One drop on top and one on bottom at 45O angle; at hot c. One drop with bottom down and one drop on top edge at d. One drop on side (opposite (a) side) and one drop on one temper ature: 45O angle;

39、 at cold temperature. end (opposite (a) side); at cold temperature. J The packaged simulators shall be observed for compliance with requirement 3.6.3. 4.5.8.7 Forty-foot drop test. This test shall be conducted in accordance with Test 103 of MIL-STD-331. The packaged simulators shall be dropped in th

40、e following positions: One drop with bottom down at minus 2SF, one drop with end down at 125OF. A new simulator package shall be used for each drop. The simulator shall be observed for compliance with requirement 3.6.6 (Destructive Test). 4.5.8.8 Loose carqo. This test shall be conducted in accordan

41、ce with Method 514.3 of MIL-STD-810, Test Procedure II, Test Conditions 1-3.2.3. (One box positioned on its base and one box positioned on its end, at hot and cold temperature for first article only). The simulators shall be observed for compliance with requirement 3.6.4. 4.5.8.9 Temperature-humidit

42、y. The packaged simulators shall be subjected to a 14 day temperature humidity test according to MIL-STD-331, Test 105.1. Observation shall be made for compliance with requirement 3.6.12. 4.5.8.10 Temperature-cyclinq. The packaged items shall be conditioned Cold (minus 25+ SF), Ambient .(+7O0F), and

43、 Hot C+125OF), as specified in MIL-STD-810, Method 503.2, Procedure I, Table 503.2-1. Hot Dry Ambient Temperature item response will be 125“+ S0F. Observation shall be made for compliance with requirement 3.6.13. 18 Provided by IHSNot for ResaleNo reproduction or networking permitted without license

44、 from IHS-,-,-MIL-S-63523A 13 W 9999906 035175b b W MIL-S- 6 3 5 23A (AR) 4.5.9 Heat seal of barrier bag. (See Dwg. 9344297). The test shall be performed in accordance with the procedure specified in MIL-P-116H para. 4.4.4.3. After the test, the seal shall be examined for compliance with the applica

45、ble requirements. (Non-Des t r uc ti ve Test ) 5. PACKAGING 5.1 Cleaninq. The simulator shall be cleaned in accordance 5.2 Drying. The simulator shall be dried in accordance with with Process C-1 of MIL-P-116, as required. MIL-P-116; as required. 5.3 Preservation. Not required. 5.4 Packaging require

46、ments. Packaging shall be as specified on Dwgs. 9344296 and 9344297. 5.5 Packinq.and markinq. Packing and marking shall be as specified on Dwgs. 9344296 and 9344297. 5.6 Department of transportation. DOT authorization and classification to ship shall be obtained by the supplier. A copy of the DOT au

47、thorization shall be furnished to the Contracting Officer prior to delivery of any assemblies/items/hazardous materials. 5.6.1 DOT authorization/harzard classification. Certification from the supplier shall be required to assure no significant change in the item, materials, packaging, etc. which wou

48、ld affect the DOT authorization/hazard classification. Should any change in the DOT marking shown on drawing 9344296 be required by the DOT IAW Title 49 CFR, notification will .be provided through the contracting officer to the design agency. 6. NOTES 6.1 Intended use. The simulator is a device util

49、izing energy produced by explosives, propellants, or pyrotechnics or combination thereof ta produce a flash, bang and smoke signature. This is a training device used with the Hoffmann Device (Figure 1) on several armored vehicles. 6.2 Hazard-Motes. The provisions as cited in the following 6.2.1 Hazardous materials. Hazardous materials/components will paragraphs are applicable to this specification. be identified as they are selected and submi

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1