ARMY MIL-T-50384 (2)-1990 TELESCOPE ELBOW M114A1《M114A1曲折望远镜》.pdf

上传人:李朗 文档编号:448707 上传时间:2018-11-16 格式:PDF 页数:3 大小:121.23KB
下载 相关 举报
ARMY MIL-T-50384 (2)-1990 TELESCOPE ELBOW M114A1《M114A1曲折望远镜》.pdf_第1页
第1页 / 共3页
ARMY MIL-T-50384 (2)-1990 TELESCOPE ELBOW M114A1《M114A1曲折望远镜》.pdf_第2页
第2页 / 共3页
ARMY MIL-T-50384 (2)-1990 TELESCOPE ELBOW M114A1《M114A1曲折望远镜》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-T-50384 (2) 12 W 7777706 0413352 8 W ._ . MIL-T-50384(AR) AMENDMENT 2 25 JAN i99n.- SUPERSEDING AMENDMENT 1 17 August 1984 MILITARY SPECIFICATION TELESCOPE, SLBOW: M114El This Amendment forms a part of Military Specification MIL-T-50384(MU), dated 16 June 1970, and is approved for use by the U.S

2、. Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Title: Change from “M114E1“ to “M114A1“ and wherever it appears in the specification. * 2.1, Drawings: Change from “Frankford Arsenal“ to “Armament Research,

3、Development arid Engineering Center“ PAGE 2 * 2.2: Delete “of DSAM 4158.8“. * 3.3: Delete and substitute: “3.3 General specifications. The contractor shall be responsible for the compliance with the requirements of specification MIL-F-13926.“ * 3.10: Delete and substitute 3.10 and add 3.10.1 and 3.1

4、0.2: “3.10: Illumination: 3.10.1 Reticle. The reticle markings shall be visible in ambient light conditions ranging from dusk into night. When required, the use of a mask with a 3/4“ aperture, located on the entrance window, will be permitted to meet the requirements; 3.10.2 External tritium contami

5、nation. There shall be no trace of tritium in excess of 1000 disintesrations per minute (dpm)/lOO sq. cm. on the external surface of the telescope. AMSC N/A 1 OF 3 FSC 1240 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. c Provided by IHSNot for ResaleNo reproductio

6、n or networking permitted without license from IHS-,-,-MIL-T-50389 (2) 12 m 9999906 OY13353 T MIL-T-50384(AR) AMENDMENT 2 PAGE 6 * 4.3.2.2, Table II: After CRITICAL: Change to “None“. Add “MAJOR: 100% Inspection“. Delete “MAJOR: AQL 1.0% Defective“ and renumber as follows: Characteristic 1 to 101, 2

7、 to 102, 101 to 103, 102 to 104, 103 to 105, etc. 114: After operability: Add “(600F(16C) to 90OF(32OC) )It. 115: Change 3.10“ to “3.10.1“. Add: “117 External Tritium contamination 3.10.2 4.2.16 MIL-F-13926 4.7“ 118 Fabrication 3.2 119 Packaging Inspection 5.1 PAGE 11 4.6.2.15, lines 8 and 13: Chang

8、e “3.10 to 3.10.1“. * Add new paragraphs 4.2.16 and 4.7: “4.2.16 External tritium contamination. Contamination test shall be performed by wipinq the telescope with filter paper moistened in distilled water. performed with moderate finger pressure. The damp filter paper shall be placed in a container

9、 with the proper portion of scintillation liquid. The scintillating system used to measure contamination must be calibrated and shall be within 10% of the known standard value when counted to a total of 2000 disintergrations. contamination is performed by placing the container into the scintillation

10、 system. The measured contamination shall be within the limits specified in 3.10.3.“ The wiping shall be The actual test for determining “4.7 Packaging inspection. The preservation, packaging, and marking shall be inspected to verify conformance to the requirements of 5.1. I PAGE 12 6.2: Add new sub

11、paragraph d: d. Contract-data requirements for submission of inspection equipment designs conforming to Data Item Description DI-R-1714, Tailored. See 6.4.1.“ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-c MIL-T-50384(AR) AMENDMENT 2 Add new parag

12、raphs 6.4 and 6.4.1: “6.4 Inspection equipment design.“ “6.4.1 Submission of designs for approval. Contractor designs for final inspection acceptance inspection shall be approved by the Government prior to fabrication or procuring the equipment. The contractor is referred to MIL-HDBK-204 for guidanc

13、e. Submission of design concept on inspection equipment is permissible for tentative approval, The completion date for design review will be based on the date of the final submission of designs and the required delivery schedule as stipulated in the contract. Submit designs as required to: Commander

14、, US Army Armament Research, Development and Engineering Center, Attn: AMSMC-QAF-I(D), Picatinny Arsenal, NJ 07806-5000. When the contractor submits inspection equipment designs to the government for approval, he shall give the following information in his letter of transmittal: a. The contract numb

15、er. b. The contract item (name, model number, etc.). c. The designs remaining to be submitted and the expected date of submittal. AMENDMENT 1 2.1: Delete “MIL-L-50778“ and “MIL-HDBK-204“. NOTE: The margins of this Amendment are marked with asterisks to indicate where changes (additions, modification

16、s, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR 3 Preparing activity: Army-AR Project (1240-A948) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1