1、. - Q f d i 1 INCH-POUND 1 MIL-V-44362( GL) AMENDMENT 1 10 Jariuary 1991 MILITARY SPECIFICATION VEST, GRENADE, CARRIER (FOR 40-mm GRENADES) This amendment forms a part of MIL-V-44362(GL),dated 9 March 1989, and is approved for use by all Departments and Agencies of the Department of Defense, PAGE 2
2、2.1.2, under “DRAWINGS“: Add the following: “2-1-2242 - 40mm Pyrotechnic Grenade Gauge - 2-1-2243 - 40nun High Explosive Grenade Gauge“ PAGE 3 Add the following new paragraph: “3.2.1 Fit gauges. The two fit gauges for the grenades shall be coristruct- ed as specified on drawings 2-1-2242 and 2-1-224
3、3 (see 4.4.5 and 4.5).“ PAGE 14 Under “Examine“, line 1, after “grenade“ insert “fit gauges“. Under “Defect“, first defect, line 1, delete “grenades“ and insert “greiiade Under “Defect“, second defect, line 1, delete “grenades“ and insert “grenade fit gauges“. . fit gauges“. , Table III, under “NOTE
4、“ for “Fit of grenade into pockets and closure Of tal$: Delete entire paragraph and substitute the following: “The 40-mm grenade fit examination shall be performed with the two grenade fit gauges supplied by the contractor (see 3.2.1 and 4.5). gauges shall be inserted into each pocket, face towards
5、the tab of the pockets. A defect shall be scored if either grenade fit gauge must be forced into the pocket(s), or if they extend beyond the bottom of the pocket by more than 1/2 inch. The two grenade fit gauges shall be Each of the grenade fit The flat ends of the fit gauges shall supplied by the c
6、ontractor.“ I* 1 of 2 FSC 8413 AMSC N/A DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-44362(GL) AMENDMENT 1 Table III, under “NOTE“ for “Securing of grenadereta
7、iner tabt, line 1, after trenade“, Add: “fit gauge(c)“. 11 PAGE 15 Add the following: “4.5 Methods of inspection. 4.5.1 Fit gauge inspecti,on. The fit gauges shall be inspected for dimen- sional requirements specified in 4.4.5 (see 3.2.1). cause for rejection of the gauge,“ Any nonconformance shall
8、be PAGE 17 5.3, lines 6 and 7, delete: “K and L ar film bonding means O or P.“ and sub- stitute: “C and D or film bonding means F or G.“ 6.4, lines 1 and 2, delete: “and 40-mm grenades or fit test items or gauges required for the fit examination in 4.4.5.“ Custodian: Army - GL Preparing Activity: Army - GL Review activities: (Project 8415A792) . Army - MD DLA - CT , c . 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-