1、*USACE / NAVFAC / AFCESA / NASA UFGS-12 24 13 (August 2010)-Preparing Activity: USACE SupersedingUFGS-12 24 13 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 12 - FURNISHINGSSECTION 12 24 13ROLLER WINDOW S
2、HADES08/10PART 1 GENERAL1.1 GENERAL REQUIREMENTS1.2 REFERENCES1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Qualifications1.4.1.1 Manufacturers Qualifications1.4.1.2 Installers Qualifications1.4.2 Flammability Requirements1.4.3 Electrical Requirements1.4.4 Anti-Microbial Requirements1.4.5 Sustainable Des
3、ign Documentation1.4.6 Sustainable Design Certification1.5 DELIVERY, STORAGE, AND HANDLING1.6 WARRANTYPART 2 PRODUCTS2.1 WINDOW SHADES2.1.1 Light Filtering Shades2.1.2 Room Darkening Shades2.2 COLORPART 3 EXECUTION3.1 FIELD MEASUREMENTS3.2 ROLLER WINDOW SHADE PLACEMENT SCHEDULE3.3 INSTALLATION3.4 CL
4、EAN-UP- End of Section Table of Contents -SECTION 12 24 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-12 24 13 (August 2010)-Preparing Activity: USACE SupersedingUFGS-12 24 13 (February 2010)UNIFIED FAC
5、ILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 12 24 13ROLLER WINDOW SHADES08/10*NOTE: This guide specification covers the requirements for roller window shades and hardware.Edit this guide specification for project specific requirements by adding, deleting
6、, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to
7、 the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).PART 1 GENERAL*NOTE: Use Section 12 21 00 for WINDO
8、W BLINDS. Use Section 12 22 00 for CURTAINS AND DRAPES*1.1 GENERAL REQUIREMENTSProvide roller window shades, complete with necessary brackets, fittings, and hardware in accordance with paragraph ROLLER WINDOW SHADE PLACEMENT SCHEDULE as located in the drawings. Mount and operate equipment in accorda
9、nce with manufacturers instructions. Windows to receive a shade shall be completely covered.a. Submit drawings showing plans, elevations, sections, product details, installation details, operational clearances, wiring diagrams and relationship to adjacent work. Include the use of same room designati
10、ons as indicated on the drawings.SECTION 12 24 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b. Provide manufacturers data composed of catalog cuts, brochures, product information, and operating and maintenance instructions on each product
11、 to be used. Include styles, profiles and features.c. Furnish samples of each type and color of roller shade fabric and roller shade channel. Shade material shall be minimum 150 by 150 mm6 by 6 inch in size. Mark face of material to indicate interior faces.d. Mock up: Install shade in area designate
12、d by Contracting Officer. Do not proceed with remaining work until the Contracting Officer approves workmanship and operation. Re-work mock-up as required to produce acceptable work. The approved shade can be used in installation.e. Submit fire resistance data, flame spread and smoke contribution da
13、ta.f. Provide LEED documentation relative to: local/regional materials (LEED) credit and recycled content credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specifi
14、cation. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the referenc
15、e in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publicat
16、ions listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.ASTM INTERNATIONAL (ASTM)ASTM G 21 (1996; R 2002) Determining Resistance of Synthetic Polymeric Materials to FungiGREENGUARD ENVIRONMENTAL INSTITUTE (G
17、EI)GEI Greenguard Standards for Low Emitting ProductsSECTION 12 24 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 701 (2010) Standard Methods of Fire Tests for Flame Propagation of Textiles an
18、d FilmsSCIENTIFIC CERTIFICATION SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor AdvantageUNDERWRITERS LABORATORIES (UL)UL 325 (2002; R 2010) Door, Drapery, Gate, Louver, and Window Operators and Systems1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33
19、00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are
20、already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval
21、on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Divis
22、ion or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the s
23、econd bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will
24、 review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURESSD-02 Shop DrawingsSECTION 12 24 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Installation; G; G, _SD-03 Product DataWi
25、ndow Shades; G; G, _CertificationSD-04 SamplesWindow Shades; G; G, _SD-06 Test ReportsWindow ShadesSD-08 Manufacturers InstructionsWindow ShadesSD-10 Operation and Maintenance DataWindow ShadesSD-11 Closeout SubmittalsLocal/Regional Materials (LEED)Shade Cloth (LEED)1.4 QUALITY ASSURANCE1.4.1 Qualif
26、ications1.4.1.1 Manufacturers QualificationsObtain motor-controlled roller shades through one source from a single manufacturer with a minimum of twenty years experience and minimum of three projects of similar scope and size in manufacturing products comparable to those specified in this section.1.
27、4.1.2 Installers QualificationsInstaller trained and certified by the manufacturer with a minimum of ten years experience in installing products comparable to those specified in this section.1.4.2 Flammability RequirementsPasses in accordance with NFPA 701 small and large-scale vertical burn. Materi
28、als tested shall be identical to products proposed for use.1.4.3 Electrical RequirementsNFPA Article 100 listed and labeled in accordance with UL 325 or other testing agency acceptable to authorities having jurisdiction, marked for intended use, and tested as a system. Individual testing of componen
29、ts will no be acceptable in lieu of system testing.SECTION 12 24 13 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.4.4 Anti-Microbial RequirementsNo Growth per ASTM G 21 results for fungi ATCC9642, ATCC 9644, ATCC9645.1.4.5 Sustainable Desig
30、n DocumentationEnvironmental Certification: Submit written certification from the manufacturer, including third party evaluation, recycling characteristics, and perpetual use certification as specified below. Initial submittals, which do not include the Environmental Certification, below will be rej
31、ected. Materials that are simply PVC free without identifying their inputs will not qualify as meeting the intent of this specification and shall be rejected.a. Third Party Evaluation: Provide documentation stating the shade cloth (LEED) has undergone third party evaluation for all chemical inputs,
32、down to a scale of 100 parts per million, that have been evaluated for human and environmental safety. Identify any and all inputs, which are known to be carcinogenic, mutagenic, teratogenic, reproductively toxic, or endocrine disrupting. Also identify items that are toxic to aquatic systems, contai
33、n heavy metals, or organohalogens. The material shall contain no inputs that are known problems to human or environmental health per the above major criteria, except for an input that is required to meet local fire codes.b. Recycling Characteristics: Provide documentation that the shade cloth can an
34、d is part of a closed loop of perpetual use and not be required to be down cycled, incinerated or otherwise thrown away. Scrap material can be sent back to the mill for reprocessing and recycling into the same quality yarn and woven into new material, without down cycling. Certify that this process
35、is currently underway and will be utilized for the project.c. Perpetual Use Certification: Certify that at the end of the useful life of the shade cloth, that the material can be sent back to the manufacturer for recapture as part of a closed loop of perpetual use and that the material can and will
36、be constituted into new yarn, for weaving into new shade cloth. Provide information on each shade band indicating that the shade band can be sent back to the manufacturer for this purpose.1.4.6 Sustainable Design CertificationProduct shall be third party certified by GEI Greenguard Indoor Air Qualit
37、y Certified, SCS Scientific Certification Systems Indoor Advantage or equal. Certification shall be performed annually and shall be current.1.5 DELIVERY, STORAGE, AND HANDLINGDeliver components to the jobsite in the manufacturers original packaging with the brand or company name, item identification
38、, and project reference clearly marked. Store components in a dry location that is adequately ventilated and free from dust, water, or other contaminants and has easy access for inspection and handling. Store materials flat in a clean dry area with temperature maintained above 10 degrees C 50 degree
39、s F. Do not open containers until needed for installation unless verification inspection is required.SECTION 12 24 13 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.6 WARRANTYProvide 10 year minimum limited warranty.PART 2 PRODUCTS*NOTE: Coo
40、rdinate with the drapery hardware specified for the project.*2.1 WINDOW SHADES*NOTE: Light filtering shades are translucent and softly diffuse light to the amount that the fabric selected by the designer allows. Room darkening (black-out) shades are opaque and block out light completely. The designe
41、r should specify a complete room darkening system only if total light block is necessary, as in an audio visual application. A room darkening shade is typically made of a vinyl coated fiberglass cloth. Do not specify cotton cambric fabric for room darkening shades since it cannot provide total light
42、 block. Coordinate maximum unit sizes available with the window sizes.*Roller tube shall operate smoothly and be of sufficient diameter and thickness to prevent excessive deflection. Provide brackets that are appropriate for inside outside ceiling mount. The shade cloth shall meet the performance de
43、scribed in NFPA 701, small scale test. Treat steel features for corrosion resistance.2.1.1 Light Filtering ShadesProvide light filtering window shades to conform with the following:a. Roller tube shall be extruded aluminum or steel. Diameter, wall thickness, and material to be selected by the manufa
44、cturer to accommodate the shade size. Provide roller idler assembly of molded nylon and zinc-plated steel pin. Sliding pin shall allow easy installation and removal of roller. Fabric shall be connected to the roller tube with double sided adhesive specifically developed to attach coated textiles to
45、metal to eliminate horizontal impressions in fabric or attached with a spline lock system.b. Fascia shall be L-shaped aluminum extrusion to conceal shade roller and hardware that snaps onto end caps without requiring exposed fasteners of any kind. Fascia can be mounted continuously across two or more shade bands.c. End caps shall be sta