ARMY UFGS-31 11 00-2008 CLEARING AND GRUBBING《清理和除根》.pdf

上传人:proposalcash356 文档编号:449686 上传时间:2018-11-16 格式:PDF 页数:8 大小:45.99KB
下载 相关 举报
ARMY UFGS-31 11 00-2008 CLEARING AND GRUBBING《清理和除根》.pdf_第1页
第1页 / 共8页
ARMY UFGS-31 11 00-2008 CLEARING AND GRUBBING《清理和除根》.pdf_第2页
第2页 / 共8页
ARMY UFGS-31 11 00-2008 CLEARING AND GRUBBING《清理和除根》.pdf_第3页
第3页 / 共8页
ARMY UFGS-31 11 00-2008 CLEARING AND GRUBBING《清理和除根》.pdf_第4页
第4页 / 共8页
ARMY UFGS-31 11 00-2008 CLEARING AND GRUBBING《清理和除根》.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 11 00 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 11 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 11 00CLEARING AND GRUBBIN

2、G08/08PART 1 GENERAL1.1 SUBMITTALS1.2 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 TREE WOUND PAINT2.2 HERBICIDEPART 3 EXECUTION3.1 PROTECTION3.1.1 Roads and Walks3.1.2 Trees, Shrubs, and Existing Facilities3.1.3 Utility Lines3.2 CLEARING3.3 TREE REMOVAL3.4 PRUNING3.5 GRUBBING3.6 DISPOSAL OF MA

3、TERIALS3.6.1 Saleable Timber3.6.2 Nonsaleable Materials- End of Section Table of Contents -SECTION 31 11 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 11 00 (August 2008)-Preparing Activity: USACE Su

4、persedingUFGS-31 11 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 11 00CLEARING AND GRUBBING08/08*NOTE: This guide specification covers the requirements for clearing and grubbing.Edit this guide specification for project specif

5、ic requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification ar

6、e welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*

7、NOTE: When this specification is used for hazardous waste site remediations, define what materials generated from clearing, grubbing, and tree removal are contaminated and what materials are non-contaminated. The decision on how to define contaminated and non-contaminated materials must be made by t

8、he appropriate regulatory authorities and documented in the design analysis.The following information must be shown on the project drawings:1. Limits of clearing2. Limits of grubbingSECTION 31 11 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,

9、-,-3. Trees and shrubs to remain in area to be cleared4. Trees to be removed in areas which are not to be cleared5. Describe size, density, and type of trees to be cleared and grubbed.*1.1 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edi

10、t the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only

11、 delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up

12、to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in th

13、e District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army p

14、rojects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Go

15、vernment. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataNonsaleable Materials; G; G, _Written permission to dispose of such products on private property shall be filed with the Contracting Officer.SECTION 31 11 00 Page 3Provided by IHSNot for ResaleN

16、o reproduction or networking permitted without license from IHS-,-,-SD-04 SamplesTree wound paintHerbicideSamples in cans with manufacturers label.1.2 DELIVERY, STORAGE, AND HANDLINGDeliver materials to store at the site, and handle in a manner which will maintain the materials in their original man

17、ufactured or fabricated condition until ready for use.PART 2 PRODUCTS2.1 TREE WOUND PAINTBituminous based paint of standard manufacture specially formulated for tree wounds.2.2 HERBICIDE*NOTE: Specify by generic name. Spraying of herbicides should be prohibited near vegetation to be saved; if deemed

18、 necessary, this may be made more controllable by careful selection of herbicides. Recommended types and rate of coverage should be obtained from recognized authorities. When grubbing is included as part of the contract, delete requirements for herbicides.*_. Comply with Federal Insecticide, Fungici

19、de, and Rodenticide Act (Title 7 U.S.C. Section 136) for requirements on Contractors licensing, certification and record keeping. Contact the command Pest Control Coordinator prior to starting work.PART 3 EXECUTION3.1 PROTECTION3.1.1 Roads and WalksKeep roads and walks free of dirt and debris at all

20、 times.3.1.2 Trees, Shrubs, and Existing FacilitiesProtection shall be in accordance with Section 01 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROLS. Trees and vegetation to be left standing shall be protected from damage incident to clearing, grubbing, and construction operations by the erection of b

21、arriers or by such other means as the circumstances require.3.1.3 Utility LinesProtect existing utility lines that are indicated to remain from damage. Notify the Contracting Officer immediately of damage to or an encounter SECTION 31 11 00 Page 4Provided by IHSNot for ResaleNo reproduction or netwo

22、rking permitted without license from IHS-,-,-with an unknown existing utility line. The Contractor shall be responsible for the repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which

23、are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service. Refer to Section 01 30 00, ADMINISTRATIVE REQUIREMENTS and Section 01 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROLS for additional utility protection

24、.3.2 CLEARING*NOTE: Any clearing which requires the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work should be indicated and specified in the Section 02 41 00 DEMOLITION AND DECONSTRUCTION.When grubbing is included as part of the contract, delete require

25、ments for herbicides.Where loose rocks, boulders, or rock piles are present on the surface of the areas designated to be cleared, appropriate provisions will be inserted to provide for the disposal of such material. Where stone occurs that can be economically used in the project, provision will be m

26、ade for the proper stockpiling of such stone in a designated area adjacent to the location of its intended use.If only minor structures will be encountered, such work may be included. Where large structures are to be demolished, the requirements of this work will be covered in Section 02 41 00 DEMOL

27、ITION AND DECONSTRUCTION.Herbicides intended for controlling vegetative growth should be specified and used with caution on hazardous waste sites to avoid contributing to site contamination.*Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disp

28、osal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing shall also include the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Trees, stumps, r

29、oots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface, except such trees and vegetation as may be indicated or directed to be left standing. Trees designated to be left standing within the cleared areas shall be trimmed of dead bran

30、ches 40 mm 1-1/2 inches or more in diameter and shall be trimmed of all branches the heights indicated or directed. Limbs and branches to be trimmed shall be neatly cut close to the bole of the tree or main branches. Cuts more than 40 mm 1-1/2 inches in diameter shall be painted with an approved tre

31、e-wound paint. Apply herbicide at the rate of _ in accordance with the manufacturers label to the top surface of stumps designated not to be removed.SECTION 31 11 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3 TREE REMOVALWhere indicate

32、d or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work shall include the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING. Trees shall be disposed o

33、f as specified in paragraph DISPOSAL OF MATERIALS.3.4 PRUNINGPrune Trim trees designated to be left standing within the cleared areas of dead branches 38 mm 1 1/2 inches or more in diameter; and trim branches to heights and in a manner as indicated. Neatly cut limbs and branches to be trimmed close

34、to the bole of the tree or main branches. Paint cuts more than 32 mm 1 1/4 inches in diameter with an approved tree wound paint.3.5 GRUBBING*NOTE: Delete the second sentence when this work is included under another section or sections of the project specification.For hazardous waste sites, the amoun

35、t of grubbing performed in contaminated areas should be minimized due to potential added costs for disposal of contaminated materials and health and safety concerns.*Grubbing shall consist of the removal and disposal of stumps, roots larger than 75 mm 3 inches in diameter, and matted roots from the

36、designated grubbing areas. Material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, shall be removed to a depth of not less than 455 mm 18 inches below the original surface level of the ground in areas indicated to be grubbed and in areas

37、indicated as construction areas under this contract, such as areas for buildings, and areas to be paved. Depressions made by grubbing shall be filled with suitable material and compacted to make the surface conform with the original adjacent surface of the ground.3.6 DISPOSAL OF MATERIALS3.6.1 Salea

38、ble Timber*NOTE: Do not include this article in SOUTHNAVFACENGCOM projects. Instead, notify the Project Manager, obtain an estimated value if timber is saleable, and include the following in the BASIS OF BIDS statement: “Bidders are advised that there is marketable standing timber, having fair marke

39、t value which the Government appraises to be $_, within the limits of construction. The Contractor is required to pay the appraised amount to the Government within 30 days after notice to proceed has been given. This is to be deposited in the SECTION 31 11 00 Page 6Provided by IHSNot for ResaleNo re

40、production or networking permitted without license from IHS-,-,-Navys forestry account.“Verify with the natural resources office for the installation the most appropriate option.1. The first option should be used when the Contractor will be required to cut and stack saleable lumber for the Governmen

41、t.2. The second option should be used when the Government will harvest saleable timber prior to award of the contract.3. The third option should be used when the Contractor will be required to pay the Government an appraised amount for the saleable timber on the project site. Use of the third option

42、 must be approved by EFD/EFA legal counsel for NAVFAC projects. When the felled timber has a distinct commercial value, the disposal of such timber may be left to the Contractor provided the Contracting Officer has reasonable assurance that the bidders will consider the value of the salvageable timb

43、er in estimating their bids. An applicable length will be inserted in the blank. At hazardous waste sites, timber removed from areas of contamination is normally not salable due to liability concerns.4. The fourth option should be used when the disposition of cleared materials is left to the Contrac

44、tors discretion. When the timber that can be obtained from felled trees is not of sufficient commercial value to warrant salvaging, this paragraph may be deleted, and the Contractor permitted either to make use of or to dispose of such timber in an approved manner.When this specification is being used for the remediation of hazardous waste sites, this paragraph should define how both contaminated and non-contaminated materials will be disposed of. As an alternative, disposal requirements could

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1