ARMY UFGS-32 01 11 52-2008 RUNWAY RUBBER REMOVAL《跑道上橡胶的清除》.pdf

上传人:fatcommittee260 文档编号:449702 上传时间:2018-11-16 格式:PDF 页数:6 大小:37.81KB
下载 相关 举报
ARMY UFGS-32 01 11 52-2008 RUNWAY RUBBER REMOVAL《跑道上橡胶的清除》.pdf_第1页
第1页 / 共6页
ARMY UFGS-32 01 11 52-2008 RUNWAY RUBBER REMOVAL《跑道上橡胶的清除》.pdf_第2页
第2页 / 共6页
ARMY UFGS-32 01 11 52-2008 RUNWAY RUBBER REMOVAL《跑道上橡胶的清除》.pdf_第3页
第3页 / 共6页
ARMY UFGS-32 01 11 52-2008 RUNWAY RUBBER REMOVAL《跑道上橡胶的清除》.pdf_第4页
第4页 / 共6页
ARMY UFGS-32 01 11 52-2008 RUNWAY RUBBER REMOVAL《跑道上橡胶的清除》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 11.52 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 11.52 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 11.5

2、2RUNWAY RUBBER REMOVAL08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 SYSTEM DESCRIPTION1.2.1 RUBBER REMOVAL EQUIPMENT1.2.1.1 Waterblasting Equipment1.2.1.2 Shotblasting Equipment1.2.1.3 Sandblasting Equipment1.2.2 Chemical Rubber Removal Equipment1.3 SUBMITTALS1.4 QUALITY ASSURA

3、NCE1.4.1 Maintenance of Traffic1.4.2 Landing and Take-Offs1.5 DELIVERY, STORAGE, AND HANDLING1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION3.1 RUBBER REMOVAL3.2 CLEANUP AND WASTE DISPOSAL- End of Section Table of Contents -SECTION 32 01 11.52 Page 1Provided by IHSNot

4、for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 11.52 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 11.52 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008

5、*SECTION 32 01 11.52RUNWAY RUBBER REMOVAL08/08*NOTE: This guide specification covers the requirements for runway rubber removal.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate

6、 information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, includi

7、ng their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES1.1.1 MeasurementRubber removal will be measured by the number of square meters feet of runway to be cleaned.1

8、.1.2 PaymentRubber removal will be paid for at the contract unit price per square meter foot of runway rubber removed.SECTION 32 01 11.52 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2 SYSTEM DESCRIPTION1.2.1 RUBBER REMOVAL EQUIPMENTMechan

9、ical rubber removal equipment includes waterblasting, shotblasting, sandblasting, or other approved nonchemical systems. Control equipment to be used on asphalt or tar concrete to remove rubber accumulations and minimize disturbance to asphalt or tar mixtures. Equipment to be used on portland cement

10、 concretes shall be controlled to remove rubber accumulations and prevent removal of hardened paste from the concrete. Basic hand tools and the following major types of mechanical equipment will be considered acceptable for this project.1.2.1.1 Waterblasting EquipmentProvide mobile waterblasting equ

11、ipment capable of producing a pressurized stream of water that will effectively remove rubber from the pavement surface without significantly damaging the pavement. Regulate water pressure so that substantially all rubber accumulations are removed during execution of the work.1.2.1.2 Shotblasting Eq

12、uipmentProvide mobile self propelled shotblasting equipment capable of producing an adjustable depth of rubber removal and of propelling abrasive particles at high velocities on the rubber for effective removal. Each unit shall be self cleaning and self contained. Provide equipment able to confine t

13、he abrasive, any dust that is produced, and removed rubber; and capable of recycling the abrasive for reuse.1.2.1.3 Sandblasting EquipmentProvide mobile sandblasting equipment capable of producing a pressurized stream of sand and air that will effectively remove rubber from the pavement surface with

14、out filling voids with debris in asphalt or tar pavements or removing joint sealants in portland cement concrete pavements. Include with the equipment an air compressor, hoses, and nozzles of adequate size and capacity for removing all rubber. Equip the compressor with traps that will maintain the c

15、ompressed air free of oil and water, and capable of furnishing a flow rate of at least 0.071 cubic meters/second 150 cubic feet/minute of air at a pressure of at least 621 kPa90 psi at each nozzle.1.2.2 Chemical Rubber Removal EquipmentChemical equipment shall be capable of application and removal o

16、f chemicals from the pavement surface and shall leave only non-toxic biodegradable residue.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals shoul

17、d be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the SECTION 32 01 11.52 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-submittal requires Government approval. Some submittals are a

18、lready marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval o

19、n Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Divisi

20、on or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the se

21、cond bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office that will r

22、eview the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataRubber Removal EquipmentA list of construction equipment including item names and descriptions.Rubber RemovalStatements regarding the suitability of materials, pers

23、onnel, and methods proposed to accomplish the work.1.4 QUALITY ASSURANCE1.4.1 Maintenance of TrafficCoordinate the operation of equipment and the performance of work upon and in the vicinity of airfields with the Contracting Officer and with the Flight Operations Officer. Neither equipment nor perso

24、nnel shall use any portion of an airfield without permission of these officers unless the runway is closed. In all cases, maintain verbal communication with the control tower before and during work in the vicinity of the airfield. The control tower shall be advised when work is completed. Runways wi

25、ll be closed during the following times:SECTION 32 01 11.52 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Day or Runway Runway ImportantDate Closing Time Opening Time Notes_ _ _ _1.4.2 Landing and Take-OffsEmergency landings and take-offs sha

26、ll take precedence over all Contractor operations. When notified of an emergency situation, cease all rubber removal operations and immediately clear the runway of all equipment and personnel for a distance of at least 60 meters 200 feet from the edge of the runway.1.5 DELIVERY, STORAGE, AND HANDLIN

27、GDeliver materials, that are required in the approved rubber removal process, in original manufacturers containers labeled with appropriate EPA, OSHA, or other agency warnings, if applicable. Protect materials from the environment until their use is required during execution of the work.1.6 ENVIRONM

28、ENTAL REQUIREMENTSPavement surface shall be free of snow, ice or slush. Surface temperature shall be at least 5 degrees C 40 degrees F and rising at the beginning of operations except those involving shotblasting or sandblasting for which a lower surface temperature may be approved. Cease operation

29、during thunderstorms. Cease operation during rainfall except for waterblasting and removal of previously applied chemicals. Cease waterblasting where surface water accumulation alters the effectiveness of material removal.PART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION*NOTE: The Contracting Officer

30、, the airport administrator and the pavements engineer will jointly develop guidelines and requirements for rubber removal operations; and will jointly evaluate the feasibility of the Contractors methods and project compliance with applicable regulations.*3.1 RUBBER REMOVALThe pavement surface may b

31、e of portland cement, tar or asphalt mixtures. Only use chemical methods which are compatible with pavement materials, the environment and working personnel. Exercise close control of water pressure and blasting time/duration to prevent disintegration damage to asphalt and tar concretes. Exercise ex

32、tremely good control for porous friction courses. Demonstrate the ability to remove rubber at a touchdown area of the runway selected by the Contracting Officer; at least one site per runway will be chosen. Rubber removal shall be as complete as possible without damage to the pavement surface. The s

33、urface texture of the cleaned demonstration area will be compared to that of nonrubber traffic areas to determine satisfactory completion of the removal operation. After approval of the Contractors operations the cleaned area will become the standard for rubber removal and final surface texture for

34、the remainder of work.SECTION 32 01 11.52 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 CLEANUP AND WASTE DISPOSALKeep the worksite clean of debris and waste from rubber removal operations. Cleanup operations shall be continuous. Debris and waste materials shall be accumulated and disposed at approved sites.- End of Section -SECTION 32 01 11.52 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1