ASTM A939-2007 Standard Practice for Ultrasonic Examination from Bored Surfaces of Cylindrical Forgings《圆柱体锻件钻孔表面的超声波检验用标准实施规程》.pdf

上传人:boatfragile160 文档编号:460032 上传时间:2018-11-25 格式:PDF 页数:2 大小:51.37KB
下载 相关 举报
ASTM A939-2007 Standard Practice for Ultrasonic Examination from Bored Surfaces of Cylindrical Forgings《圆柱体锻件钻孔表面的超声波检验用标准实施规程》.pdf_第1页
第1页 / 共2页
ASTM A939-2007 Standard Practice for Ultrasonic Examination from Bored Surfaces of Cylindrical Forgings《圆柱体锻件钻孔表面的超声波检验用标准实施规程》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: A 939 07Standard Practice forUltrasonic Examination from Bored Surfaces of CylindricalForgings1This standard is issued under the fixed designation A 939; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last

2、 revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This practice covers a basic procedure of ultrasonicallyinspecting cylindrical forgings with bores from the boresurface.

3、1.2 This practice applies to the manual testing mode. It doesnot restrict the use of other testing modes, such as mechanizedor automated.1.3 This practice applies to cylindrical forgings having boresizes equal to or greater than 2.5 in. (63.5 mm).1.4 The values stated in inch-pound units are to be r

4、egardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the u

5、ser of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Significance and Use2.1 This practice shall be used when ultrasonic inspectionfrom the bore surface is required by the order or specificationfor inspe

6、ction purposes in which the acceptance of the forgingis based on limitations of the number, amplitude, or location ofdiscontinuities or a combination thereof, which leads to ultra-sonic indications.2.2 The acceptance criteria shall be stated clearly as orderrequirements.2.3 This practice specifies d

7、ual search units, which depend-ing on the angle, are sensitive only to 2 to 3 in. into the metalfrom the bore surface.3. General Requirements3.1 As far as possible, the entire bore surface shall besubjected to ultrasonic inspection. It may be impossible toinspect some small portions of the bore surf

8、ace because ofchamfers at stepdowns and other local configurations.3.2 The bore ultrasonic inspection shall be performed afterthe final austenitizing and tempering heat treatment for me-chanical properties of the forging, and may be performed eitherprior to or after any subsequent stress relieving h

9、eat treatment.3.3 The ultrasonic beam shall be introduced radially foroverall scanning.3.4 Forgings may be tested either when stationary or whilerotated by means of a lathe or rollers.3.5 To ensure complete coverage of the bore surface, thesearch unit shall be indexed approximately 75 % of thetransd

10、ucer width with each pass of the search unit.3.6 A frequency of 214 MHz shall be used unless additionaltransducer frequencies are specified by the purchaser.3.7 The bore hole diameter and calibration hole(s) shall beas specified on the purchasers drawing or order.4. Pulsed Ultrasonic Reflection Equi

11、pment andAccessories4.1 Electronic ApparatusA pulse echo instrument permit-ting inspection frequencies of 1, 2.25, and 5 MHz is required.The accuracy of discontinuity amplitude analysis using thispractice involves a knowledge of the true operating frequencyof the complete inspection system. One of t

12、he best ways toobtain the desired accuracy is by use of a tuned pulser andnarrow band amplifier of known frequency response, witheither a broad band transducer or a narrow band tunedtransducer of known and matching frequency. An equipmentcalibration plan that is acceptable to both the purchaser and

13、thesupplier shall be available.4.2 AmplifierThe amplifier and the cathode ray tube shallprovide linear response (within 65%)upto112 in. (38.1 mm)sweep to peak.An equipment calibration plan that is acceptableto both the purchaser and the supplier shall be available.4.3 Signal AttenuatorThe instrument

14、 shall contain a cali-brated gain control or signal attenuator (accurate within 65%in each case) that will allow indications beyond the linear rangeof the instrument to be measured. It is recommended that thesecontrols permit signal adjustment up to 25 to 1 (28 dB).4.4 Search UnitsDual longitudinal

15、wave search units ofknown effective frequency should be used for scanning. Each14- by 1-in. (6.35 by 25.4-mm) 2.25 MHz transducer, used withthe 1-in. dimension parallel to the longitudinal axis of theforging, will provide a desirable combination of resolution and1This practice is under the jurisdict

16、ion of ASTM Committee A01 on Steel,Stainless Steel and Related Alloys and is the direct responsibility of SubcommitteeA01.06 on Steel Forgings and Billets.Current edition approved May 1, 2007. Published May 2007. Originallyapproved in 1995. Last previous edition approved in 2006 as A 939 96 (2006).1

17、*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.beam width. Search units shall have interchangeable plexiglassshoes that are machined to various diameters for matchingd

18、ifferent bore diameters.5. Preparation of Forging for Ultrasonic Inspection5.1 The surface of the bore shall be free of tool tears, loosescale, grinding particles, or other foreign material at the time ofultrasonic testing.5.2 Bore surfaces should be honed for bore diameter uni-formity to maintain a

19、 near constant energy transmission fromthe transducer into the forging.6. Procedure6.1 Establish the inspection sensitivity such that the reflec-tion amplitude equals 100 % of the screen height throughoutthe entire inspection, using the calibration hole, specified bythe purchaser, drilled parallel t

20、o the bore surface.6.2 Check the distance calibration for linearity.6.3 Using only one transducer connected with pulse delay,mark the location of the reflected signal from the curvedsurface of the plexiglass shoe as the bore surface.6.4 Record the distance from the bore surface to the side ofthe cal

21、ibration hole.6.5 Adjust the sweep length control to position the backreflection approximately three fourths of the distance across thecathode ray tube.6.6 Record all indications axially and circumferentially as apercentage of the calibration hole sensitivity.6.7 Support the search unit with structu

22、ral means at regularintervals.6.8 Record all indications for radial distance and axialdistance.7. Report7.1 Report the following information:7.1.1 Amplitudes of all indications as a percentage of thecalibration hole sensitivity,7.1.2 Axial locations of all indications,7.1.3 Radial and circumferentia

23、l locations of all indications,7.1.4 Areas with high densities of indications as levels of5 % increments, and7.1.5 All reflection losses of 20 % or more.8. Keywords8.1 bore inspection; bored turbine rotor; forgings; ultrasonicexaminationSUMMARY OF CHANGESCommittee A01 has identified the location of

24、selected changes to this standard since the last issue (A 939 96(2006) that may impact the use of this standard. (Approved May 1, 2007.)(1) Changed from Test Method to Practice.ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item ment

25、ionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee

26、and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting

27、 of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO B

28、ox C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org).A939072

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TR 62627-03-03-2013 5530 Fibre optic interconecting devices and passive components Reliability Report on high-power reliability for metal-doped optical fibre plug-style .pdf BS PD IEC TR 62627-03-03-2013 5530 Fibre optic interconecting devices and passive components Reliability Report on high-power reliability for metal-doped optical fibre plug-style .pdf
  • BS PD IEC TR 62627-08-2016 Fibre optic interconnecting devices and passive components Study of optical power blocking measurement methods for adaptors with an optical powe.pdf BS PD IEC TR 62627-08-2016 Fibre optic interconnecting devices and passive components Study of optical power blocking measurement methods for adaptors with an optical powe.pdf
  • BS PD IEC TR 62660-4-2017 Secondary lithium-ion cells for the propulsion of electric road vehicles Candidate alternative test methods for the internal short circuit test o.pdf BS PD IEC TR 62660-4-2017 Secondary lithium-ion cells for the propulsion of electric road vehicles Candidate alternative test methods for the internal short circuit test o.pdf
  • BS PD IEC TR 62681-2014 Electromagnetic performance of high voltage direct current (HVDC) overhead transmission lines《高压直流 (HVDC) 架空输电线路的电磁性能》.pdf BS PD IEC TR 62681-2014 Electromagnetic performance of high voltage direct current (HVDC) overhead transmission lines《高压直流 (HVDC) 架空输电线路的电磁性能》.pdf
  • BS PD IEC TR 62689-100-2016 Current and voltage sensors or detectors to be used for fault passage indication purposes Requirements and proposals for the IEC 61850 series d.pdf BS PD IEC TR 62689-100-2016 Current and voltage sensors or detectors to be used for fault passage indication purposes Requirements and proposals for the IEC 61850 series d.pdf
  • BS PD IEC TR 62690-2014 Hydrogen effects in optical fibre cables Guidelines《光缆的氢效应 指南》.pdf BS PD IEC TR 62690-2014 Hydrogen effects in optical fibre cables Guidelines《光缆的氢效应 指南》.pdf
  • BS PD IEC TR 62691-2016 Optical fibre cables Guidelines to the installation of optical fibre cables《光缆 光缆安装指南》.pdf BS PD IEC TR 62691-2016 Optical fibre cables Guidelines to the installation of optical fibre cables《光缆 光缆安装指南》.pdf
  • BS PD IEC TR 62726-2014 Guidance on quantifying greenhouse gas emission reductions from the baseline for electrical and electronic products and systems《电气和电子产品和系统基准的温室气体减排.pdf BS PD IEC TR 62726-2014 Guidance on quantifying greenhouse gas emission reductions from the baseline for electrical and electronic products and systems《电气和电子产品和系统基准的温室气体减排.pdf
  • BS PD IEC TR 62746-2-2015 Systems interface between customer energy management system and the power management system Use cases and requirements《客户能源管理系统与动力管理系统之间的系统接口 使用案.pdf BS PD IEC TR 62746-2-2015 Systems interface between customer energy management system and the power management system Use cases and requirements《客户能源管理系统与动力管理系统之间的系统接口 使用案.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASTM

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1