ASTM C1091-2003a Standard Test Method for Hydrostatic Infiltration Testing of Vitrified Clay Pipe Lines《上釉陶土管道的水压渗入和渗出试验的标准试验方法》.pdf

上传人:ownview251 文档编号:463333 上传时间:2018-11-27 格式:PDF 页数:2 大小:20.90KB
下载 相关 举报
ASTM C1091-2003a Standard Test Method for Hydrostatic Infiltration Testing of Vitrified Clay Pipe Lines《上釉陶土管道的水压渗入和渗出试验的标准试验方法》.pdf_第1页
第1页 / 共2页
ASTM C1091-2003a Standard Test Method for Hydrostatic Infiltration Testing of Vitrified Clay Pipe Lines《上釉陶土管道的水压渗入和渗出试验的标准试验方法》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: C 1091 03aStandard Test Method forHydrostatic Infiltration Testing of Vitrified Clay Pipe Lines1This standard is issued under the fixed designation C 1091; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of la

2、st revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method defines procedures for hydrostaticinfiltration testing of new installations of vitrified clay pipeline

3、s, to demonstrate the structural integrity of the installedline. Refer to Practice C 12.1.2 This test method is suitable for testing gravity-flow pipelines constructed of vitrified clay pipe or combinations of claypipe and other pipe materials.1.3 This test method is applicable to the testing of the

4、 pipelines only. Manholes or other structures should be testedseparately.1.4 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are providedfor information only.1.5 This standard does not purport to address all of thesafety problems, if any, asso

5、ciated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C 12 Practice for Installing Vitrified Clay Pipe LinesC 8

6、28 Test Method for Low-Pressure Air Test of VitrifiedClay Pipe LinesC 896 Terminology Relating to Clay Products3. Terminology3.1 Terminology C 896 can be used for clarifications ofterminology in this test method.4. Summary of Test Method4.1 This test method shall be performed on lines afterconnectio

7、n laterals, if any, have been plugged and adequatelybraced to withstand the test pressure, and after the trencheshave been backfilled and compacted.5. Significance and Use5.1 The tests called for herein, for their results, indicate theacceptability of installed vitrified clay pipelines.6. Preparatio

8、n of the Line6.1 To ensure the proper seating of the test plugs and theaccuracy of the test, the lines should be cleaned prior to testing.6.2 Examples of methods for cleaning the lines are thesewer cleaning ball and high pressure flushing equipment.7. Procedure7.1 The hydrostatic infiltration test p

9、rocedure is applicablewhere the measured water table is 2 ft (610 mm) or greaterabove the pipe barrel at the lower manhole of the test section.Where the ground water elevation is indeterminate, less than 2ft (610 mm) above the top of the pipe barrel, or the line ispartially below the water table, us

10、e a combination of both theair test and infiltration procedure.NOTE 1The most practical method for testing is Test Method C 828,and is recommended. However, where ground water is present and meetsthe criteria established in 7.1, the infiltration test procedure outlined in thispractice is recommended

11、.7.2 Determine the allowable infiltration rate for the testsection using Table 1.NOTE 2What can be called false infiltration represents condensate onthe pipe walls.7.3 The test rate table is based on the standard of 50 gal/in.diametermileday (4.6 L/mm diameterkilometreday).7.4 Table 1 shows the allo

12、wable infiltration rate ingallons 100 ft of pipe hour (litres per 30.5 metres hour) foreach nominal pipe size.7.5 If the test section includes more than one pipe size,calculate the allowable test rate for each size and add to arriveat the total allowable test rate for the test section.1This test met

13、hod is under the jurisdiction of ASTM Committee C04 on VitrifiedClay Pipe and is the direct responsibility of Subcommittee C04.20 on Methods ofTest and Specifications.Current edition approved October 1, 2003. Published October 2003. Originallypublished in 1988. Last previous edition approved in 2003

14、 as C 1091 03.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor

15、Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.7.6 Discontinue all pumping of ground water for a period of24 h prior to testing.7.7 Plug the inlet to the section to be tested. If there isinfiltration in the section upstream from the test section, theupstream section shall be plu

16、gged off or dewatered to preventthe manhole from filling with water.7.8 Begin collection and measurement after constant flow isgenerated at the test section outlet. Collect the infiltration in acalibrated container or use a calibrated weir.7.9 Terminate the infiltration test when sufficient water is

17、collected or measured, or both, to establish the test rate.7.10 If the infiltration rate (Table 1) is within the establishedlimit, the line is presumed to have passed the test.7.11 If there is no flow in the test section or the flow isminimal and cannot be measured, the line has passed the test.8. P

18、recision and Bias8.1 No statement is made about either the precision or biasof this test method for measuring gallons (litres) and time,since the results merely state whether there is conformance tothe criteria for success specified in the procedure.9. Keywords9.1 air test; clay pipe; hydrostatic te

19、st; infiltration; pipe;pressure test; sewers; vitrified clay pipe; water testASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validi

20、ty of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your commen

21、ts are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have no

22、t received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple cop

23、ies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org).TABLE 1 Allowable Infiltration Test Rate in Gallons/100 ft ofLine Hour (Litre/Metre Hour)nominal pipesiz

24、e,in. (mm)gal/100 ft h(L/m h)nominal pipesizein. (mm)gal/100 ft h(L/m h)4 (100) 0.16 (0.020) 24 (610) 0.95 (0.12)6 (150) 0.24 (0.030) 27 (685) 1.1 (0.13)8 (200) 0.32 (0.039) 30 (760) 1.2 (0.15)10 (255) 0.39 (0.049) 33 (840) 1.3 (0.16)12 (305) 0.47 (0.059) 36 (915) 1.4 (0.18)15 (380) 0.59 (0.073) 39 (990) 1.5 (0.19)18 (455) 0.71 (0.088) 42 (1070) 1.7 (0.21)21 (535) 0.83 (0.10) 48 (1220) 1.9 (0.24)C 1091 03a2

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1