ASTM C1320-2005(2009)e1 Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《轻型框架结构用矿物纤维毛层和隔热毯的标准安装规程》.pdf

上传人:testyield361 文档编号:464215 上传时间:2018-11-27 格式:PDF 页数:4 大小:75.68KB
下载 相关 举报
ASTM C1320-2005(2009)e1 Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《轻型框架结构用矿物纤维毛层和隔热毯的标准安装规程》.pdf_第1页
第1页 / 共4页
ASTM C1320-2005(2009)e1 Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《轻型框架结构用矿物纤维毛层和隔热毯的标准安装规程》.pdf_第2页
第2页 / 共4页
ASTM C1320-2005(2009)e1 Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《轻型框架结构用矿物纤维毛层和隔热毯的标准安装规程》.pdf_第3页
第3页 / 共4页
ASTM C1320-2005(2009)e1 Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《轻型框架结构用矿物纤维毛层和隔热毯的标准安装规程》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: C1320 05 (Reapproved 2009)1Standard Practice forInstallation of Mineral Fiber Batt and Blanket ThermalInsulation for Light Frame Construction1This standard is issued under the fixed designation C1320; the number immediately following the designation indicates the year oforiginal adoptio

2、n or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEThe title of CPSC Product Safety Fact Sheet No. 518 was editorially corrected in M

3、arch 2010.1. Scope1.1 This practice covers procedures for the installation ofmineral fiber batt and blanket thermal insulation in ceilings,attics, floors, and walls of new or existing housing and otherlight frame construction.1.2 This practice covers the installation process from pre-installation in

4、spection through post-installation inspection. Itdoes not cover the production of the insulation materials.1.3 This practice is not intended to replace manufacturersinstallation instructions, but it shall be used in conjunction withsuch instructions. This practice is not intended to supersedelocal,

5、state, or federal codes.1.4 This practice assumes that the installer possesses aworking knowledge of applicable codes and regulations, safetypractices, tools, equipment, and methods necessary for theinstallation of thermal insulation materials. It also assumes thatthe installer understands the funda

6、mentals of construction thataffect the installation of insulation.1.5 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.6 This standard d

7、oes not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM St

8、andards:2C168 Terminology Relating to Thermal InsulationC665 Specification for Mineral-Fiber Blanket Thermal In-sulation for Light Frame Construction and ManufacturedHousingC755 Practice for Selection of Water Vapor Retarders forThermal InsulationD3833/D3833M Test Method forWaterVaporTransmissionof

9、Pressure-Sensitive TapesE84 Test Method for Surface Burning Characteristics ofBuilding Materials2.2 Other Standards:NFPA-31 Standard for the Installation of Oil BurningEquipment3NFPA-54 National Fuel Gas Code3NFPA-70 National Electric Code3NFPA-211 Standard for Chimneys, Fireplaces,Vents andSolid-Fu

10、el Burning Appliances3ICC International Residential Code4CPSC Product Safety Fact Sheet No. 518 “The HomeElectrical System”53. Terminology3.1 DefinitionsDefinitions relating to thermal insulationin Terminology C168 apply to terms used in this practice.3.2 Description of Terms Specific to This Standa

11、rd:3.2.1 conditioned spacespace in a building that is servedby a heating or cooling system.3.2.2 installerthe person or persons who apply thermalinsulation materials in buildings whether or not such person orpersons have contracted with the owner to perform the work.3.2.3 mineral fiber batt and blan

12、ket thermal insulatingmaterialsthose materials that meet the minimum require-ments set forth in Specification C665.3.2.4 ownerthe person, partnership, corporation, agency,or other entity who owns the building to be insulated whethersuch ownership is by virtue of deed, contract, or any other1This pra

13、ctice is under the jurisdiction of ASTM Committee C16 on ThermalInsulation and is the direct responsibility of Subcommittee C16.23 on Blanket andLoose Fill Insulation.Current edition approved Sept. 1, 2009. Published September 2009. Originallyapproved in 1995. Last previous edition approved in 2005

14、as C1320 05. DOI:10.1520/C1320-05R09.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from National

15、 Fire Protection Association (NFPA), 1 BatterymarchPark, Quincy, MA 02169-7471, http:/www.nfpa.org.4Available from International Code Council (ICC), 500 New Jersey Ave., NW,6th Floor, Washington, DC 20001-2070, http:/www.iccsafe.org.5Available from U.S. Consumer Product Safety Commission (CPSC), 433

16、0 EastWest Hwy., Bethesda, MD 20814, http:/www.cpsc.gov.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.instrument for acquiring legal title under the laws of the Statein which the building is located.3.2.5 vapor retardermembrane or

17、tape that has a watervapor permeance (perm) rating of 1 perm (5.7 3 1011kgPa1s1m2) or less as defined in Practice C755 or TestMethod D3833/D3833M respectively.4. Significance and Use4.1 This practice recognizes that effectiveness, safety, anddurability of insulation depend not only on the quality of

18、 theinsulating materials but also on their proper installation.4.2 This practice provides general procedures that will helpto ensure installation of insulation in a safe and effectivemanner. It shall be noted that actual conditions in existingbuildings vary greatly and in some cases additional care

19、shallbe taken to ensure effective and safe installation.5. Safety Precautions5.1 The installer shall wear proper clothing and equipmentas recommended by the insulation manufacturer.5.2 In areas where insulation is to be installed, componentsof the electrical system shall be in good condition. If the

20、re isreason to believe the electrical system is faulty, do not installinsulation in such areas until the owner has been informed andrepair has been accomplished.NOTE 1The CPSC Product Safety Fact Sheet No. 518 has identifiedthe following signs of electrical deficiencies: lights dimming, fusesblowing

21、, circuit breakers tripping frequently, electrical sparks and “glow-ing” from receptacles, light flickering, and coverplates on switches andoutlets that are warm or hot to the touch.6. Pre-installation Inspection and Preparation6.1 Inspect the roof, walls, ceilings, and attic floors toidentify areas

22、 where previous or existing moisture problemshave caused paint peeling, warpage, staining, visible fungusgrowth, rotting, or other structural damage. Do not installinsulation in such areas until the owner has been informed andhas certified that these conditions have been corrected and theirsource(s)

23、 of moisture eliminated.6.2 Provide proper attic ventilation in accordance with localbuilding requirements or practices, such as the ICC Interna-tional Residential Code.6.3 When the attic has soffit vents at the eaves, makeprovisions to prevent insulation from blocking the vents andrestricting attic

24、 ventilation.6.4 Where insulation is to be installed beneath floors overcrawl spaces or on crawl space walls, cover the ground surfacewith a vapor retarder.6.5 Provide proper crawl space ventilation in accordancewith local building requirements or practices, such as the ICCInternational Residential

25、Code.6.6 Inspect attic floors for openings that might permitentrance of air from conditioned spaces below. Do not installinsulation in such areas until the owner has been informed andhas certified that these conditions have been corrected.7. Installation Procedures7.1 General:7.1.1 Handle the insula

26、tion material in accordance with themanufacturers instructions and keep free of extraneous mate-rials. Keep materials dry, off the ground, and protected fromwater.7.1.2 It is difficult to describe every situation that will beencountered by the insulation installer. In general, however, theinstaller

27、shall be guided by the need to reduce heat flow aroundor through obstructions and to protect mechanical systems.Wherever insulation is installed in a building, it is veryimportant that it fit snugly on all sides. If the insulation is toolong for a space, cut it to the correct size. If it is too shor

28、t, cuta piece to fill the void.7.1.3 Install the insulation in such a way that the thicknessspecified by the manufacturer is met or exceeded. Avoidcompression of the insulation where ever possible. Failure toachieve the manufacturers labeled thickness will reduce theR-value.7.1.4 When a vapor retard

29、er facing is provided with theinsulation, it can be pressure fit with no stapling or face stapledor inset stapled. Both inset and face staple methods are widelyused and are acceptable procedures. Inset stapling is usuallypreferred by the wall finish trades because it allows adhesiveapplication of th

30、e wall board. Some areas require face stapling.Always check the local code requirements.7.1.4.1 Position the vapor retarder toward the winter-warmside, except in a hot, humid climate where local requirementsor practices differ regarding the placement of vapor retarders.7.1.4.2 Friction fit batts suc

31、h as R13, R15, R21, R22, R30C,or R38C as well as kraft faced batts without attached staplingflanges do not have to be stapled in place. The higher densityor increased glass batt width of these products helps hold themin place without a measurable loss in the moisture protection ofthe vapor retarder.

32、 Make sure the insulation facing is flush withthe face of the stud. The insulation shall fit snugly at the sidesand ends.7.1.4.3 When inset stapling, gently press the insulation atthe sides of the framing cavity, usually about34 in. (19 mm),until the outside of the flange is flush with the face of t

33、heframing. When inset stapling between inclined or verticalframing members, as in cathedral ceilings or walls, startstapling at the top and work down. Use enough staples to holdthe insulation firmly in place and avoid gaps or fishmouthsbetween flanges and framing.7.1.4.4 When face stapling, place th

34、e insulation betweenframing members and check to be sure it fits the cavity at bothends. With facing material flush with the face of the framing,the flanges will overlap the framing. Staple the flanges to theface of the framing, using enough staples to hold the insulationfirmly in place and avoid ga

35、ps and fishmouths. The flange ofthe faced insulation placed in the next cavity will overlap thepreviously stapled flange. When more than one batt is used,pieces shall be snugly butted.7.1.5 Building insulations faced with kraft or standard foilhaving a flame spread index greater than 25 shall never

36、be leftexposed as stated on the facing of the product. The facing shallbe covered and in substantial contact with an approved ceiling,wall, or floor construction material as required by the buildingC1320 05 (2009)12codes. When supplied with stapling flanges inset and facestapling of these products a

37、re acceptable procedures.7.1.6 Maintain a 3-in. (75-mm) minimum air space aroundmotors, fans, blowers, heaters, other heat-producing devices,flues and chimneys, as specified by NFPA-31, NFPA-54, andNFPA-211.7.1.7 Maintain a 3-in. (75-mm) minimum air space aroundall sides of recessed lighting fixture

38、s, unless such fixtures areapproved for installation in direct contact with insulation, ICrated, as specified in NFPA-70. This includes fixture wiringcompartments and ballasts, and other heat-producing devices.Do not cover open areas above these devices; allow free aircirculation, unless they are sp

39、ecifically approved for operationwhen covered with thermal insulation. Allow devices that mayrequire periodic servicing to remain accessible after the insu-lation is installed.7.2 Walls:7.2.1 Carefully fill any small spaces remaining aroundwindows, doors, or wall cavity obstructions with insulation.

40、Patch the vapor retarder with vapor retarder tape where it hasbeen interrupted in these areas, including any remaining fishmouths or gaps between flanges and framing.7.2.2 Caulk, gasket, or otherwise seal around all otherpenetrations of the interior wall, including plumbing, electrical,heat register

41、s, and grills.7.2.3 Insulate junction boxes for wall switches and conve-nience outlets at outside walls between the rear of the box andthe sheathing. Place insulation behind the junction box, and ifnecessary, cut insulation to fit snugly around it. Where electri-cal wiring passes through a stud cavi

42、ty and is located close tothe inside wall surface, insulation shall be pressed behind thewiring. When the wiring is in the center of the cavity, eithermake a shallow cut in the insulation to allow the wiring to passthrough the insulation or split the insulation lengthwise andsandwiched the wiring wi

43、thin.7.2.4 Place insulation between the piping in exterior wallsand the exterior wall sheathing. Sidewalls where plumbingfixtures are to be placed shall be insulated before the fixturesare installed. To guard against pipes freezing, insulation shallnever be placed between piping and the warm side of

44、 the wall.7.3 Attics, Ceilings, and Floors:7.3.1 When installing insulation around trusses or crossbracing of ceiling or floor joists, care shall be taken to ensurethat the insulation material is of the proper width, fits tightlyaround these obstructions, and that there are no gaps in theinsulation.

45、7.3.2 Use only full width (typically 16 or 24 in. wide) battsor blankets when insulating between attic trusses and ceilingjoists below open attic spaces. When insulating with twolayers, the first layer of insulation shall be at least the sameheight as the bottom structural member.Apply the second la

46、yercrosswise to the joists. For single layer applications, useinsulation thicker than the bottom structural member and makesure the tops of adjacent batts or blankets meet and cover thestructural members where unobstructed.7.3.3 Install floor insulation between floor joists to fit snuglyin the joist

47、 areas in contact with the floor and support with suchthings as wire fasteners, screening, or nylon mesh held in placeby stapling or nailing.7.3.4 Install insulation around air vents in a manner that willensure free movement of air through the vents into the attic orcrawl space.7.3.5 Fit the attic s

48、ide of access doors or panels with aninsulation batt (or equivalent material) except where there is aretractable ladder or other equipment attached. Anchor theinsulation to the door or panel with staples or adhesive.8. Post-installation Inspection8.1 Ensure that no gaps or areas exist where insulati

49、on isunnecessarily compressed. Examples are behind piping andelectrical wiring. When inset stapling, minimal compressionshall be used to fasten the facing flanges.8.2 Ensure that insulation does not restrict vents so thatminimum attic ventilation requirements specified in 6.2,orcrawl space ventilation requirements specified in 6.5 of thispractice are met.8.3 Ensure that insulation material is not in the air spaces,specified in 7.1.6 and 7.1.7 of this practice, around and abovemotors, fans, blowers, heaters, recessed lighting fixtures, bal-lasts, wiring compa

展开阅读全文