ASTM C891-2009 Standard Practice for Installation of Underground Precast Concrete Utility Structures《地下预制混凝土公用设施装配标准》.pdf

上传人:registerpick115 文档编号:508681 上传时间:2018-12-01 格式:PDF 页数:3 大小:57.62KB
下载 相关 举报
ASTM C891-2009 Standard Practice for Installation of Underground Precast Concrete Utility Structures《地下预制混凝土公用设施装配标准》.pdf_第1页
第1页 / 共3页
ASTM C891-2009 Standard Practice for Installation of Underground Precast Concrete Utility Structures《地下预制混凝土公用设施装配标准》.pdf_第2页
第2页 / 共3页
ASTM C891-2009 Standard Practice for Installation of Underground Precast Concrete Utility Structures《地下预制混凝土公用设施装配标准》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: C891 09Standard Practice forInstallation of Underground Precast Concrete UtilityStructures1This standard is issued under the fixed designation C891; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revi

2、sion. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the procedures to be followed in theplanning, site preparation, and installation of undergroundprecast con

3、crete utility structures. Concrete pipe and boxculverts are not covered under this practice. Also, precastconcrete manholes covered in Specification C478 are excludedfrom this practice.1.2 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathem

4、aticalconversions to SI units that are provided for information onlyand are not considered standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and heal

5、th practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C478 Specification for Precast Reinforced Concrete Man-hole Sections3. Survey3.1 The installation area shall be surveyed using the work-print and a checklist to identify th

6、e work to be done and todetermine that the plans are correct.3.1.1 The location of the utility structure should be where itwill cause minimum interference with traffic and shall beclearly defined on work prints.3.1.2 All underground facilities and structures such as gas,water, sewer, power, telephon

7、e cable, and so forth shall belocated and identified. Location markings shall be placed bythe affected utilities before the construction.3.2 The survey shall identify any obstacles such as overheadwires, building structures, and so forth that will interfere withcrane operations, work progress, or cr

8、eate a safety hazard.Precautionary arrangements shall be made before excavationbegins.3.3 The survey shall give consideration to the soil structureso that proper shoring, sloping, or both, may be planned inadvance of the excavation work.4. Planning4.1 Permits required to do work in accordance with t

9、hedetail plans shall be secured before starting the job. All permitsor a record of the permits shall be retained on the job forimmediate reference.4.2 All utilities and owners of surface and subsurfacefacilities and structures in the area shall be given advancenotification of proposed excavation. Ev

10、ery effort shall be madeto avoid damage to the facilities of others. If any damageoccurs, the owner of the damaged facility shall be notifiedimmediately.4.3 Planning shall include the coordination of all respon-sible parties to ensure that arrangements for removal of brokenpavement, rocks, excess sp

11、oil, and so forth have been made.Responsible parties shall arrange for the delivery, distribution,and storage of required material. If such material cannot bestored on the site, other storage areas must be provided.4.4 Should it appear that a structure location will interferewith traffic, review the

12、 situation with the engineer and notifyappropriate authorities.4.5 Provide for access to call boxes, fire hydrants, etc.5. Safety Requirements5.1 Safety requirements for construction shall be in accor-dance with all federal, state, and local regulations.5.2 The utility structure or any sections that

13、 comprise thestructure assembly shall only be lifted at the lifting points sodesignated by the manufacturer.6. Excavating6.1 Coordinate the various excavation operations from thepoint of opening the pavement to completion of backfill so thatthe work area thus occupied is kept to a minimum consistent

14、1This practice is under the jurisdiction of ASTM Committee C27 on PrecastConcrete Products and is the direct responsibility of Subcommittee C27.10 onUtility Structures.Current edition approved Nov. 1, 2009. Published November 2009. Originallyapproved in 1978. Last previous edition approved in 2003 a

15、s C891 90(2003). DOI:10.1520/C0891-09.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM Interna

16、tional, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.with the conditions governing the work. This is particularlyimportant where an excavation is adjacent to hospitals, policeand fire department buildings, service stations, and so forth.6.2 If unforeseen facili

17、ties or obstructions are encountered,stop excavating operations immediately. Expose the obstruc-tions with wood handled digging tools and investigate themwith caution. If there is any doubt as to the type of obstructionexposed, request positive identification from those suspected ofowning the facili

18、ty and then proceed as circumstances dictate.6.3 Buried work frequently requires the use of heavyconstruction equipment and transport of heavy loads. Certainsoil conditions may be encountered that will not support theseloads. To avoid hazards and unnecessary delays caused bycave-ins or equipment bec

19、oming mired, carefully observe theprevailing conditions beforehand and take appropriate preven-tive measures.6.4 When excavating across highways, streets, alleys,drives, and walks, perform the work in a manner that willminimize interference with traffic. If necessary, bridge theopening with a struct

20、ure of adequate strength to support anytraffic likely to pass over it. Handrails are required forstructures bridging sidewalk openings.6.5 Inspect excavations after every rainstorm or otherhazard-increasing occurrence, and increase the protectionagainst slides and cave-ins, if necessary.6.6 In dewat

21、ering excavations, make certain that the dis-charge is carried to a suitable runoff point.6.7 The excavation size must allow for the overall as-sembled height of the utility structure plus the height of collarsections, a manhole frame and cover, and any bedding materialrequired. A clearance of 12 in

22、. (300 mm) around the sidewallsof the structure is recommended for ease of installation.7. Shoring7.1 Shoring for construction shall be in accordance with allfederal, state, and local regulations.7.2 Install shoring by starting at the top of the excavationand working down. Take care to place braces

23、and jacks in a truehorizontal position with proper vertical spacing. Braces mustbe firmly secured to prevent kickouts.7.3 All materials used for shoring must be in good conditionand of the right size. Do not use timbers with large loose knots.Prefabricated box type shoring is permitted provided it i

24、s cleanand structurally sound after previous use.7.4 Installation of the shoring should follow closely theexcavation work even if no work is being done in theexcavation. The longer an excavation is left unsupported, thegreater the chance of a cave-in.7.5 As soon as the work in the excavation is comp

25、leted andthe utility structure has been installed, remove the shoring andcomplete the backfilling, unless otherwise instructed by au-thorities. Remove the shoring from the bottom up. Release thejacks or braces slowly. Use chains or wire ropes to pull out thejacks or braces from above.8. Installation

26、 Procedures8.1 Consult the detailed plan for the proper orientation ofthe precast concrete utility structure to ensure proper alignmentwith entering cables, pipes, or conduits.8.2 Do not place damaged precast concrete sections unlessapproved by the customer.8.3 Do not field modify the structure unle

27、ss it is determinedthat such modifications (for example, cuts to form slots orholes) will not adversely affect the strength of the structure.8.4 Do not install structures under conditions known toresult in loads heavier than that for which the structure wasdesigned.8.5 After the excavation has been

28、completed to the requireddimensions specified on the detailed plan, level off the areawhere the base section will be located. If necessary, to providea more level and solid foundation, fill in and compact the finesoil, sand, or gravel. Set the base as level as possible so anywater in the structure w

29、ill drain toward the sumps.8.6 Assemble the multisection utility structures by loweringeach section into the excavation. Lower, set level, and firmlyposition the base section before placing the additional sections.8.7 Where the possibility exists of a watertight structurebecoming buoyant in a floode

30、d excavation, take necessarysteps to avoid flotation of the structure.8.8 To ensure joint integrity when joining sections ofprecast concrete structures, give particular attention to remov-ing all foreign materials such as dirt, mud, and stones fromjoint surfaces and see that all sealing materials ar

31、e placedproperly.8.9 The sealing material provided for the joints betweensections may be installed in accordance with the sealantmanufacturers recommendations at the job site or at themanufacturers plant.8.10 If a mortar grout is to be used as a seal, clean andmoisten all surfaces to be grouted. The

32、 grout should be of aconsistency so that it will not flow when applied. Apply themortar grout in a manner to ensure filling of all voids in thejoint being sealed.8.11 Apply the mortar grout in an amount to provide aminimum of38-in. (10-mm) thickness of mortar on all jointsurfaces. After assembly, dr

33、ess the interior joints to removeexcess mortar.8.12 If a misalignment of sections occurs during installa-tion, remove the appropriate section. If the sealing material isdamaged, clean the joint surfaces before repairing or placingnew sealing material. Avoid misalignment of sections by usingguide dev

34、ices attached to the lower section to position theupper section into place.9. Backfilling and Restoration9.1 Do the backfilling as soon as possible after the utilitystructure has been placed.9.2 Excavations shall meet or exceed requirements of thelocal permit granting authority and backfilled with a

35、 granularmaterial free from large stones, rocks, pavement, and so forth.Expansive soil material shall not be used as backfill around thestructure.9.3 When a precast concrete utility structure is placed in anunpaved area, slope the area around the entrance frame andcover to provide drainage away from

36、 the entrance cover. Slopethe final grading upward to within 1 in. (25 mm) of the topsurface of the frame and cover.C891 0929.4 Backfill ProceduresBackfilling shall be achieved byusing lifts (layers) or flooding (jetting) the excavation to therequired compaction.9.5 Restoration of the area where the

37、 utility structure wasinstalled shall meet the requirements of the local grantingauthority or the property owner.9.6 Followup inspections for settlement are required.Should settlement occur, the contractor shall be responsible forthe necessary repair to restore the area to its original conditionin a

38、ccordance with the terms of the agreement.ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and t

39、he riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision

40、of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shoul

41、dmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org).C891 093