ASTM D6433-2003 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf

上传人:eastlab115 文档编号:522498 上传时间:2018-12-03 格式:PDF 页数:47 大小:5.08MB
下载 相关 举报
ASTM D6433-2003 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf_第1页
第1页 / 共47页
ASTM D6433-2003 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf_第2页
第2页 / 共47页
ASTM D6433-2003 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf_第3页
第3页 / 共47页
ASTM D6433-2003 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf_第4页
第4页 / 共47页
ASTM D6433-2003 Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys《道路和停车场路面条件系数测量标准实施规范》.pdf_第5页
第5页 / 共47页
亲,该文档总共47页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: D 6433 03Standard Practice forRoads and Parking Lots Pavement Condition IndexSurveys1This standard is issued under the fixed designation D 6433; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision

2、. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the determination of roads andparking lots pavement condition through visual surveys usingthe Pavement Condit

3、ion Index (PCI) method of quantifyingpavement condition.1.2 The PCI for roads and parking lots was developed by theU.S. Army Corps of Engineers (1, 2).2It is further verified andadopted by DOD and APWA.1.3 The values stated in inch-pound units are to be regardedas the standard. The SI units given in

4、 parentheses are forinformation only.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory lim

5、itations prior to use. Specific precau-tionary statements are given in Section 6.2. Terminology2.1 Definitions of Terms Specific to This Standard:2.1.1 additional samplea sample unit inspected in addi-tion to the random sample units to include nonrepresentativesample units in the determination of th

6、e pavement condition.This includes very poor or excellent samples that are nottypical of the section and sample units, which contain anunusual distress such as a utility cut. If a sample unitcontaining an unusual distress is chosen at random it should becounted as an additional sample unit and anoth

7、er randomsample unit should be chosen. If every sample unit is surveyed,then there are no additional sample units.2.1.2 asphalt concrete (AC) surfaceaggregate mixturewith an asphalt cement binder. This term also refers to surfacesconstructed of coal tars and natural tars for purposes of thispractice

8、.2.1.3 pavement brancha branch is an identifiable part ofthe pavement network that is a single entity and has a distinctfunction. For example, each roadway or parking area is aseparate branch.2.1.4 pavement condition index (PCI)a numerical ratingof the pavement condition that ranges from 0 to 100 wi

9、th 0being the worst possible condition and 100 being the bestpossible condition.2.1.5 pavement condition ratinga verbal description ofpavement condition as a function of the PCI value that variesfrom “failed” to “excellent” as shown in Fig. 1.2.1.6 pavement distressexternal indicators of pavementdet

10、erioration caused by loading, environmental factors, con-struction deficiencies, or a combination thereof. Typical dis-tresses are cracks, rutting, and weathering of the pavementsurface. Distress types and severity levels detailed inAppendixX1 forAC, andAppendix X2 for PCC pavements must be usedto o

11、btain an accurate PCI value.2.1.7 pavement sample unita subdivision of a pavementsection that has a standard size range: 20 contiguous slabs (68slabs if the total number of slabs in the section is not evenlydivided by 20 or to accommodate specific field condition) forPCC pavement, and 2500 contiguou

12、s square feet, 6 1000 ft2(225 6 90 m2), if the pavement is not evenly divided by 2500or to accommodate specific field condition, for AC pavement.2.1.8 pavement sectiona contiguous pavement area hav-ing uniform construction, maintenance, usage history, andcondition. A section should have the same tra

13、ffic volume andload intensity.2.1.9 portland cement concrete (PCC) pavementaggregate mixture with portland cement binder includingnonreinforced and reinforced jointed pavement.2.1.10 random samplea sample unit of the pavementsection selected for inspection by random sampling techniques,such as a ran

14、dom number table or systematic random proce-dure.3. Summary of Practice3.1 The pavement is divided into branches that are dividedinto sections. Each section is divided into sample units. Thetype and severity of pavement distress is assessed by visual1This practice is under the jurisdiction of ASTM C

15、ommittee E17 on Vehicle-Pavement Systems and is the direct responsibility of Subcommittee E17.41 onPavement Management.Current edition approved Dec. 1, 2003. Published January 2004. Originallyapproved in 1999. Last previous edition approved in 1999 as D 6433 99.2The boldface numbers in parentheses r

16、efer to the list of references at the end ofthis standard.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.inspection of the pavement sample units. The quantity of thedistress is measured as described in Appendix X1 and Appen-dix X2.

17、The distress data are used to calculate the PCI for eachsample unit. The PCI of the pavement section is determinedbased on the PCI of the inspected sample units within thesection.4. Significance and Use4.1 The PCI is a numerical indicator that rates the surfacecondition of the pavement. The PCI prov

18、ides a measure of thepresent condition of the pavement based on the distressobserved on the surface of the pavement, which also indicatesthe structural integrity and surface operational condition (lo-calized roughness and safety). The PCI cannot measure struc-tural capacity nor does it provide direc

19、t measurement of skidresistance or roughness. It provides an objective and rationalbasis for determining maintenance and repair needs andpriorities. Continuous monitoring of the PCI is used to estab-lish the rate of pavement deterioration, which permits earlyidentification of major rehabilitation ne

20、eds. The PCI providesfeedback on pavement performance for validation or improve-ment of current pavement design and maintenance procedures.5. Apparatus5.1 Data Sheets, or other field recording instruments thatrecord at a minimum the following information: date, location,branch, section, sample unit

21、size, slab number and size, distresstypes, severity levels, quantities, and names of surveyors.Example data sheets for AC and PCC pavements are shown inFigs. 2 and 3.5.2 Hand Odometer Wheel, that reads to the nearest 0.1 ft(30 mm).5.3 Straightedge or String Line, (AC only), 10 ft (3 m).5.4 Scale, 12

22、 in. (300 mm) that reads to18 in. (3 mm) orbetter. Additional 12-in. (300 mm) ruler or straightedge isneeded to measure faulting in PCC pavements.5.5 Layout Plan, for network to be inspected.6. Hazards6.1 Traffic is a hazard as inspectors may walk on thepavement to perform the condition survey.7. Sa

23、mpling and Sample Units7.1 Identify branches of the pavement with different usessuch as roadways and parking on the network layout plan.7.2 Divide each branch into sections based on the pave-ments design, construction history, traffic, and condition.7.3 Divide the pavement sections into sample units

24、. If thepavement slabs in PCC have joint spacing greater than 25 ft (8m) subdivide each slab into imaginary slabs. The imaginaryslabs all should be less than or equal to 25 ft (8 m) in length,and the imaginary joints dividing the slabs are assumed to bein perfect condition. This is needed because th

25、e deduct valuesdeveloped for jointed concrete slabs are less than or equal to 25ft (8 m).7.4 Individual sample units to be inspected should bemarked or identified in a manner to allow inspectors andquality control personnel to easily locate them on the pavementsurface. Paint marks along the edge and

26、 sketches with locationsconnected to physical pavement features are acceptable. It isnecessary to be able to accurately relocate the sample units toallow verification of current distress data, to examine changesin condition with time of a particular sample unit, and to enablefuture inspections of th

27、e same sample unit if desired.7.5 Select the sample units to be inspected. The number ofsample units to be inspected may vary from the following: allof the sample units in the section, a number of sample units thatprovides a 95 % confidence level, or a lesser number.7.5.1 All sample units in the sec

28、tion may be inspected todetermine the average PCI of the section. This is usuallyprecluded for routine management purposes by availablemanpower, funds, and time. Total sampling, however, isdesirable for project analysis to help estimate maintenance andrepair quantities.7.5.2 The minimum number of sa

29、mple units (n) that must besurveyed within a given section to obtain a statisticallyadequate estimate (95 % confidence) of the PCI of the sectionis calculated using the following formula and rounding n to thenext highest whole number (see Eq 1).FIG. 1 Pavement Condition Index (PCI) and Rating ScaleD

30、6433032FIG.2FlexiblePavementConditionSurveyDataSheetforSampleUnitD6433033n 5 Ns2/e2/4!N 1! 1 s2! (1)where:e = acceptable error in estimating the section PCI; com-monly, e=65 PCI points;s = standard deviation of the PCI from one sample unit toanother within the section. When performing the initialins

31、pection the standard deviation is assumed to be tenfor AC pavements and 15 for PCC pavements. Thisassumption should be checked as described below afterPCI values are determined. For subsequent inspections,the standard deviation from the preceding inspectionshould be used to determine n; and,N = tota

32、l number of sample units in the section.7.5.2.1 If obtaining the 95 % confidence level is critical, theadequacy of the number of sample units surveyed must beconfirmed. The number of sample units was estimated based onan assumed standard deviation. Calculate the actual standarddeviation (s) as follo

33、ws (see Eq 2):s 5 (ni51PCIi PCIs!2/n 1!1/2(2)where:PCIi= PCI of surveyed sample units i,PCIs= PCI of section (mean PCI of surveyed sampleunits), andn = total number of sample units surveyed.7.5.2.2 Calculate the revised minimum number of sampleunits (Eq 1) to be surveyed using the calculated standar

34、ddeviation (Eq 2). If the revised number of sample units to besurveyed is greater than the number of sample units alreadysurveyed, select and survey additional random sample units.FIG. 3 Joint Rigid Pavement Condition Survey Data Sheet for Sample UnitD6433034These sample units should be spaced evenl

35、y across the section.Repeat the process of checking the revised number of sampleunits and surveying additional random sample units until thetotal number of sample units surveyed equals or exceeds theminimum required sample units (n) in Eq 1, using the actualtotal sample standard deviation.7.5.3 Once

36、 the number of sample units to be inspected hasbeen determined, compute the spacing interval of the unitsusing systematic random sampling. Samples are spaced equallythroughout the section with the first sample selected at random.The spacing interval (i) of the units to be sampled is calculatedby the

37、 following formula rounded to the next lowest wholenumber:i 5 N/n (3)where:N = total number of sample units in the section, andn = number of sample units to be inspected.The first sample unit to be inspected is selected at randomfrom sample units 1 through i. The sample units within asection that ar

38、e successive increments of the interval i after thefirst randomly selected unit also are inspected.7.6 A lessor sampling rate than the above mentioned 95 %confidence level can be used based on the condition surveyobjective. As an example, one agency uses the following tablefor selecting the number o

39、f sample units to be inspected forother than project analysis:Given Survey1 to 5 sample units 1 sample unit6 to 10 sample units 2 sample units11 to 15 sample units 3 sample units16 to 40 sample units 4 sample unitsover 40 sample units 10 %7.7 Additional sample units only are to be inspected whennonr

40、epresentative distresses are observed as defined in 2.1.1.These sample units are selected by the user.8. Inspection Procedure8.1 The definitions and guidelines for quantifying distressesfor PCI determination are given in Appendix X1 for ACpavements. Using this test method, inspectors should identify

41、distress types accurately 95 % of the time. Linear measure-ments should be considered accurate when they are within10 % if remeasured, and area measurements should be consid-ered accurate when they are within 20 % if remeasured.Distress severities that one determines based on ride quality areconside

42、red subjective.8.2 Asphalt Concrete (AC) Surfaced PavementIndividually inspect each sample unit chosen. Sketch thesample unit, including orientation. Record the branch andsection number and the number and type of the sample unit(random or additional). Record the sample unit size measuredwith the han

43、d odometer. Conduct the distress inspection bywalking over the sidewalk/shoulder of the sample unit beingsurveyed, measuring the quantity of each severity level ofevery distress type present, and recording the data. Eachdistress must correspond in type and severity to that describedin Appendix X1. T

44、he method of measurement is included witheach distress description. Repeat this procedure for eachsample unit to be inspected. A copy of a Blank FlexiblePavement Condition Survey Data Sheet for Sample Unit isincluded in Fig. 2.8.3 PCC PavementsIndividually inspect each sample unitchosen. Sketch the

45、sample unit showing the location of theslabs. Record the sample unit size, branch and section number,and number and type of the sample unit (random or additional),the number of slabs in the sample unit and the slab sizemeasured with the hand odometer. Perform the inspection bywalking over the sidewa

46、lk/shoulder of the sample unit beingsurveyed and recording all distress existing in the slab alongwith their severity level. Each distress type and severity mustcorrespond with that described in Appendix X2. Summarizethe distress types, their severity levels and the number of slabsin the sample unit

47、 containing each type and severity level.Repeat this procedure for each sample unit to be inspected. Acopy of a Blank Jointed Rigid Pavement Condition SurveyData Sheet for Sample Unit is included in Fig. 3.9. Calculation of PCI for Asphalt Concrete (AC)Pavement9.1 Add up the total quantity of each d

48、istress type at eachseverity level, and record them in the “Total Severities”section. For example, Fig. 4 shows five entries for the DistressType 1, “Alligator Cracking”: 5L, 4L, 4L, 8H, and 6H. Thedistress at each severity level is summed and entered in the“Total Severity” section as 13 ft2(1.2 m2)

49、 of low severity and14 ft2(1.3 m2) of medium severity. The units for the quantitiesmay be either in square feet (square meters), linear feet(meters), or number of occurrences, depending on the distresstype.9.2 Divide the total quantity of each distress type at eachseverity level from 9.1 by the total area of the sample unit andmultiply by 100 to obtain the percent density of each distresstype and severity.9.3 Determine the deduct value (DV) for each distress typeand severity level combination from the distress deduct valuecurves in Appendix X3.9.4 Determine the

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASTM

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1