ASTM E1074-2006e2 431 Standard Practice for Measuring Net Benefits and Net Savings for Investments in Buildings and Building Systems.pdf

上传人:unhappyhay135 文档编号:527857 上传时间:2018-12-05 格式:PDF 页数:5 大小:96.27KB
下载 相关 举报
ASTM E1074-2006e2 431 Standard Practice for Measuring Net Benefits and Net Savings for Investments in Buildings and Building Systems.pdf_第1页
第1页 / 共5页
ASTM E1074-2006e2 431 Standard Practice for Measuring Net Benefits and Net Savings for Investments in Buildings and Building Systems.pdf_第2页
第2页 / 共5页
ASTM E1074-2006e2 431 Standard Practice for Measuring Net Benefits and Net Savings for Investments in Buildings and Building Systems.pdf_第3页
第3页 / 共5页
ASTM E1074-2006e2 431 Standard Practice for Measuring Net Benefits and Net Savings for Investments in Buildings and Building Systems.pdf_第4页
第4页 / 共5页
ASTM E1074-2006e2 431 Standard Practice for Measuring Net Benefits and Net Savings for Investments in Buildings and Building Systems.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: E 1074 062Standard Practice forMeasuring Net Benefits and Net Savings for Investments inBuildings and Building Systems1This standard is issued under the fixed designation E 1074; the number immediately following the designation indicates the year oforiginal adoption or, in the case of r

2、evision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEFootnotes updated editorially in August 2007.2NOTESection 2.2 and Footnote 4 were editorially corrected

3、in January 2009.INTRODUCTIONThe net benefits (NB) and net savings (NS) methods are part of a family of economic evaluationmethods that provide measures of economic performance of an investment over some period of time.Included in this family of evaluation methods are life-cycle cost analysis, benefi

4、t-to-cost andsavings-to-investment ratios, internal rates of return, and payback analysis.The NB method calculates the difference between discounted benefits and discounted costs as ameasure of the cost effectiveness of a project. The NS method calculates the difference betweenlife-cycle costs as a

5、measure of the cost-effectiveness of a project. The NB and NS methods aresometimes called the net present value method. The NB and NS methods are used to decide if a projectis cost effective (net benefits greater than zero, or net savings greater than zero), or which size, ordesign, competing for a

6、given purpose is most cost effective (the one with the greatest net benefits, orthe one with the greatest net savings).1. Scope1.1 This practice covers a recommended procedure forcalculating and interpreting the net benefits (NB) and netsavings (NS) methods in the evaluation of building designs ands

7、ystems.2. Referenced Documents2.1 ASTM Standards:2E 631 Terminology of Building ConstructionsE 833 Terminology of Building EconomicsE 917 Practice for Measuring Life-Cycle Costs of Buildingsand Building SystemsE 964 Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Building

8、s and Building SystemsE 1057 Practice for Measuring Internal Rate of Return andAdjusted Internal Rate of Return for Investments in Build-ings and Building SystemsE 1121 Practice for Measuring Payback for Investments inBuildings and Building SystemsE 1185 Guide for Selecting Economic Methods for Eval

9、u-ating Investments in Buildings and Building SystemsE 1369 Guide for Selecting Techniques for Treating Uncer-tainty and Risk in the Economic Evaluation of Buildingsand Building SystemsE 1765 Practice for Applying Analytical Hierarchy Process(AHP) to Multiattribute Decision Analysis of InvestmentsRe

10、lated to Buildings and Building SystemsE 1946 Practice for Measuring Cost Risk of Buildings andBuilding SystemsE 2204 Guide for Summarizing the Economic Impacts ofBuilding-Related Projects2.2 Adjuncts:Discount Factor Tables Adjunct to Practices E 917, E 964,E 1057, E 1074, E 112133. Terminology3.1 D

11、efinitionsFor definitions of terms used in thispractice, refer to Terminologies E 631 and E 833.1This practice is under the jurisdiction of ASTM Committee E06 on Perfor-mance of Buildings and is the direct responsibility of Subcommittee E06.81 onBuilding Economics.Current edition approved April 1, 2

12、006. Published April 2006. Originallyapproved in 1985. Last previous edition approved in 2004 as E 1074 04.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the stand

13、ards Document Summary page onthe ASTM website.3Available from ASTM International Headquarters. Order Adjunct No.ADJE091703.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.4. Summary of Practice4.1 This practice is organized as follow

14、s:4.1.1 Section 2, Referenced DocumentsLists ASTM stan-dards referenced in this practice.4.1.2 Section 3, DefinitionsAddresses definitions of termsused in this practice.4.1.3 Section 4, Summary of PracticeOutlines the con-tents of the practice.4.1.4 Section 5, Significance and UseExplains the appli-

15、cation of the practice and how and when it should be used.4.1.5 Section 6, ProceduresSummarizes the steps in mak-ing NB (NS) analysis.4.1.6 Section 7, Compute NB (NS)Describes calculationprocedures for NB (NS).4.1.7 Section 8, Anaylsis of NB(NS) Results and theDecisionDiscusses the decision criterio

16、n and the treatmentof uncertainty, risk, and unqualified effects.4.1.8 Section 9, ApplicationsExplains circumstances un-der which the NB (NS) method is appropriate.4.1.9 Section 10, ReportIdentifies information that shouldbe included in a report of a NB (NS) analysis.5. Significance and Use5.1 The N

17、B (NS) method provides a measure of the eco-nomic performance of an investment, taking into account allrelevant monetary values associated with that investment overthe investors study period. The NB (NS) measure can beexpressed in either present value or equivalent annual valueterms, taking into acc

18、ount the time value of money.5.2 The NB (NS) method is used to decide if a given projectis cost effective and which size or design for a given purposeis most cost effective when no budget constraint exists.5.3 The NB (NS) method can also be used to determine themost cost effective combination of pro

19、jects for a limitedbudget; that is, the combination of projects having the greatestaggregate NB (NS) and fitting within the budget constraint.5.4 Use the NB method when the focus is on the benefitsrather than project costs.5.5 Use the NS method when the focus in on project savings(that is, reduction

20、s in project costs).6. Procedures6.1 The recommended steps for applying the NB (NS)method to an investment decision are summarized as follows:6.1.1 Make sure that the NB (NS) method is the appropriateeconomic measure (see Guide E 1185),6.1.2 Identify objectives, alternatives, and constraints,6.1.3 E

21、stablish assumptions,6.1.4 Compile data,6.1.5 Convert cash flows to a common time basis (discount-ing),6.1.6 Compute NB (NS)4and compare alternatives, and6.1.7 Make final decision, based on NB (NS) results as wellas consideration of risk and uncertainty, unquantifiable effects,and funding constraint

22、s (if any).6.2 Since the steps mentioned in 6.1.2-6.1.5 are treated indetail in Practice E 917 and briefly in Practices E 964 andE 1121, they are not discussed in this practice. In calculatingNB (NS), these four steps should be followed exactly asdescribed in Practice E 917. The remainder of this pr

23、acticefocuses on the computation, analysis, and application of theNB (NS) measure.7. NB (NS) Computation7.1 Computation of NB for any given project requires theestimation, in dollar terms, of differences between benefits, anddifferences between costs, for that project relative to a mutuallyexclusive

24、 alternative. Computation of NS for any given projectrequires the estimation, in dollar terms, of the differencebetween life-cycle costs for the project relative to a mutuallyexclusive alternative. The mutually exclusive alternative maybe a similar design/system of a different scale, a dissimilardes

25、ign/system for the same purpose, or the do nothing case.Denote the alternative under consideration as Ajand themutually exclusive alternative to be used for purposes ofcomparison as Ak. Alternative Akis typically the do nothingcase or the project with the lowest first cost, which may or maynot be th

26、e same project. But the analyst can choose any of themutually exclusive alternatives as the base case against whichto compare alternatives. Benefits can include (but are notlimited to) revenue, productivity, functionality, durability, re-sale value, and tax advantages. Costs can include (but are not

27、limited to) initial investment, operation and maintenance (in-cluding energy consumption), repair and replacements, and taxliabilities.7.2 Eq 1 is used to compute the present value of net benefits(PVNBj:k) for the proposed project relative to its mutuallyexclusive alternative.PVNBj:k5(t50NBt2 Ct!/1

28、1 i!t(1)4The NIST Building Life-Cycle Cost (BLCC) Computer Program helps userscalculate measures of worth for buildings and building components that areconsistent with ASTM standards. The program is downloadable from http:/www.eere.energy.gov/femp/information/download_blcc.html.TABLE 1 Calculation o

29、f Net BenefitsYear, t Benefits, Bt, dollars Costs, Ct, dollarsNet Cash FlowBt Ct, dollarsSPV FactorAfor i=15%PVNB, dollars0 0 10 000 10 000 1.000 10 0001 4 000 3 000 +1 000 0.8696 +8702 11 500 4 500 +7 000 0.7561 +5 2933 10 000 4 000 +6 000 0.6575 +3 9454 8 000 5 000 +3 000 0.5718 +1 715Total 33 500

30、 26 500 +7 000 +1 823ATo find the PVNB of the net cash flow for each discounting period, the single present value (SPV) discount factor is multiplied times the net cash flow. For an explanationof discounting factors and how to use them, see Discount Factor Tables.E10740622where:Bt= dollar value of b

31、enefits in period t for the building orsystem being evaluated, Aj, less the counterpartbenefits in period t for the mutually exclusive alter-native against which it is being compared, Ak.Ct= dollar costs, including investment costs, in period tfor the building or system being evaluated, Aj, lessthe

32、counterpart costs in period t for the mutuallyexclusive alternative against which it is being com-pared, Ak.N = number of discounting time periods in the studyperiod, andi = the discount rate per time period.7.3 Use Eq 2 to convert the present value of net benefits toannual value terms, where N is t

33、he number of years in the studyperiod and i is the discount rate.AVNBj:k5 PVNBj:ki1 1 i!N!/1 1 i!N2 1! (2)where AVNBj:k= annual value of net benefits.7.4 Use Eq 3 to compute the present value of net savings(PVNSj:k) for the proposed project, Aj, relative to its mutuallyexclusive alternative, Ak. The

34、 terms appearing in Eq 3 arebased on the life-cycle cost (LCC) method, Practice E 917.Subtract from project costs in the year in which they occur anypure benefits (for example, increased rental income due toimprovements) in the LCC calculation.PVNSj:k5 LCCk LCCj(3)where:LCCj= the life-cycle costs of

35、 the alternative under consid-eration, Aj, andLCCk= the life-cycle costs of the mutually exclusivealternative, Ak.7.5 Use Eq 4 to convert the present value of net savings toannual value terms, where N is the number of years in the studyperiod and i is the discount rate.AVNSj:k5 PVNSj:ki 1 1 i!N!/1 1

36、 i!N1!# (4)where:AVNSj:k= annual value of net savings.7.6 For a given problem and data set, solutions in eitherpresent value or annual value terms will be time equivalentvalues (although different in actual dollar values) and willresult in the same investment or design decisions, providedannual valu

37、es are calculated using Eq 2 for net benefits and Eq4 for net savings.7.7 A simple application of Eq 1 is presented in Table 1 foran initial investment of $10 000 that yields an uneven yearlycash flow over four years. (Implicitly, the mutually exclusivealternative is the do nothing case.) Assuming a

38、 discount rate of15 %, the discounted cash flows yield a PVNB of $1823. (Notethat the sum of net cash flows, $7000, is a much larger value,since it fails to account for the eroding value of money overtime.) The larger the PVNB for a given project, the moreeconomically attractive it will be, other th

39、ings being equal.7.8 To find the AVNB that is time equivalent to $1823, useEq 2. The equivalent AVNB is $639.8. Analysis of NB (NS) Results and the Decision8.1 Use the results of the NB (NS) computation to rankorder alternatives from highest to lowest NB (NS). Thealternative with the highest NB (NS)

40、 is the most cost effective.8.2 In the final investment decision, take into account notonly the numerical values of NB (NS), but also uncertainty ofinvestment alternatives relative to the risk attitudes of theinvestor, the availability of funding and other cash-flow con-straints, any unquantified ef

41、fects attributable to the alternatives,and the possibility of noneconomic objectives. (These topicsare discussed in Section 10 of Practice E 917.)8.2.1 Decision makers typically experience uncertaintyabout the correct values to use in establishing basic assump-tions and in estimating future costs. G

42、uide E 1369 recommendstechniques for treating uncertainty in parameter values in aneconomic evaluation. It also recommends techniques for evalu-ating the risk that a project will have a less favorable economicoutcome than what is desired or expected. Practice E 1946establishes a procedure for measur

43、ing cost risk for buildingsand building systems, using the Monte Carlo simulationtechnique as described in Guide E 1369. Practice E 917 pro-vides direction on how to apply Monte Carlo simulation whenperforming economic evaluations of alternatives designed tomitigate the effects of natural and man-ma

44、de hazards that occurinfrequently but have significant consequences. Practice E 917contains a comprehensive example on the application of MonteCarlo simulation in evaluating the merits of alternative riskmitigation strategies for a prototypical data center.8.2.2 Describe any significant effects that

45、 remain unquanti-fied. Explain how these effects impact the recommendedalternative. Refer to Practice E 1765 for guidance on how topresent unquantified effects along with the computed values ofNB (NS) or any other measures of economic performance.9. Applications9.1 The NB (NS) measure indicates that

46、 a given project iscost effective if the PVNB (PVNS) is greater than zero. If thePVNB (PVNS) is less than zero, then the project is not costeffective.9.2 How large an investment to make (that is, what is themost economically efficient scale) is generally answered withNB (NS) analysis. The size or sc

47、ale of investment is increaseduntil the PVNB (PVNS) is maximized. Typical size or scaleexamples from the building industry include (1) how large abuilding to construct, (2) how large a dam to construct, (3) howmuch insulation to put in a house, and (4) how many squarefeet of collector area to instal

48、l in a solar energy system.9.3 Fig. 1 illustrates graphically how the NB method is usedto choose the economically efficient level of energy conserva-tion in a building (that is, where the PVNB is maximized).Conservation costs, in present value terms, are shown toincrease at an increasing rate as the

49、 physical quantity of inputsto conserve energy (Qi) is increased (for example, increasedinsulation). Conservation benefits (in present value terms), asmeasured by dollar energy savings, also increase with addi-tional inputs to energy conservation, but at a decreasing rate.The difference between these dollar conservation benefits andcosts at any given level of conservation inputs is the PVNB.E10740623The level of energy conservation where the PVNB is maxi-mized is Qe. Any smaller (Q1) or larger investments (Q2or Q3)than Qewould be economically in

展开阅读全文
相关资源
猜你喜欢
  • AECMA PREN 9134-2004 Aerospace series Quality systems supply chain risk management guideline Edition P 1《航空航天系列.质量系统供应链风险管理指南.P1版》.pdf AECMA PREN 9134-2004 Aerospace series Quality systems supply chain risk management guideline Edition P 1《航空航天系列.质量系统供应链风险管理指南.P1版》.pdf
  • AECMA PREN 9162-2005 Aerospace Series Operator Self-Verification Programs Edition P 1《航空航天系列.操作自我查证.P1版》.pdf AECMA PREN 9162-2005 Aerospace Series Operator Self-Verification Programs Edition P 1《航空航天系列.操作自我查证.P1版》.pdf
  • AECMA PREN 9200-2001 Aerospace Series Programme Management Guidelines for Project Management Specification Edition P 1《航空航天系列.项目管理指南工程管理规范.P1版》.pdf AECMA PREN 9200-2001 Aerospace Series Programme Management Guidelines for Project Management Specification Edition P 1《航空航天系列.项目管理指南工程管理规范.P1版》.pdf
  • AECMA PREN 9300-001-2005 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 001 Structure Edition .pdf AECMA PREN 9300-001-2005 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 001 Structure Edition .pdf
  • AECMA PREN 9300-002-2004 Aerospace series Long Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data within the aerospace industry 揂EC.pdf AECMA PREN 9300-002-2004 Aerospace series Long Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data within the aerospace industry 揂EC.pdf
  • AECMA PREN 9300-003-2009 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 003 Fundamentals and c.pdf AECMA PREN 9300-003-2009 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 003 Fundamentals and c.pdf
  • AECMA PREN 9300-004-2005 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 004 Description Method.pdf AECMA PREN 9300-004-2005 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 004 Description Method.pdf
  • AECMA PREN 9300-010-2006 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 010 Overview Data Flow.pdf AECMA PREN 9300-010-2006 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 010 Overview Data Flow.pdf
  • AECMA PREN 9300-011-2006 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 011 Reference process .pdf AECMA PREN 9300-011-2006 Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data Part 011 Reference process .pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASTM

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1